Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
22 Apr 2025, 12:00 pmClosed
EE ETD BIJNOR
Office of the executive engineer electricity Transmission Division 132 KV SS Premises area nagina road bijnor
Work of Carriage and installation of 145 KV Bus PT and 145 KV Section isolator at 132 KV SS Kiratpur Under ETD Bijnor
2025_UPTCL_1028270_1
01W/ETDBJ/2025-26
Open Tender
Electrical Works
30 days
132 KV SS Kiratpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹296
EE ETD BIJNOR
₹1,000
22 Apr 2025
15 Apr 2025
22 Apr 2025
15 Apr 2025
22 Apr 2025
15 Apr 2025
Amount
Work of Safe carriage of 1 NO. BBL structure from 132 kv ss nagina to 132 kv ss KIRATPUR.
(i).Sorting counting stacking and then loading of steel structure in private vehicle at 132 KV S/s Nagina.
(ii).Safe Carriage of steel structure from 132 KV S/s Nagina to 132 KV S/s Kiratpur through private vehicle approx. distance 15 Km.
(iii).Unloading of the material from vehicle.Sorting counting and stacking of the steel structure at proper place at 132 KV S/s Kiratpur handing over the material to the concerned JE as per invoice .
Safe Carriage of 1 No. 145 KV PT from 132 KV Aawas Vikas (Moradabad) using proper T&P to 132 KV S/s Kiratpur approx. distance 100 Km.
Safe Carriage of 1 No. 145 KV section Isolator from 132 KV S/s Bijnor to 132 KV S/s Kiratpur approx distance 20 Km.
Erection of 145 kv PT at main bus at 132 KV Substation KIRATPUR including Jumpering, connection from junction box and earthing and all associated work to complete the job satisfactorly.
Erection of 145 KV PT Junction Box.
Erection of 145 KV Section Isolator at 132 kv main bus at 132 KV Substation KIRATPUR including Jumpering and earthing and all associated work to complete the job satisfactorly.
Erection of 01 No. BBL structure.
(i).Sorting and Stacking struture, Shifting of structure from store to site and Erection as per drawing with the help of GI nut & bolt. Cutting and Matching of members of structure if required including cost of all men and T&P excluding GI structure nut & bolt and its proper tighting to complete the Work Satisfactorily.
Making U Jumpers with supporting string at from 132 kv main bus to section isolator on both side of the gantry.
SARASWAT ELECTRICALS (BID ID -5136264)
P&H Engineering (BID ID -5135973)