| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹2.3 L+₹15,098.10 (7.12%)Rejected-Finance | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹2.3 L+₹19,579.74 (9.24%)Rejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance TC recommendation |
Tender Value
₹2.1 L
EMD Value
₹2,700
Closing Date
13 Feb 2023, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Repair, Hydraulic Test and fitting with commissioning of Lancashire Boiler No. WBL8466 of Tilaboni Colliery under Bankola Area
2023_ECL_269905_1
ECL/GM/BA/E TENDER/22-23/Enm/122 Dt. 03.02.2023
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Tilaboni Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹2,700
30 Mar 2023
3 Feb 2023
14 Feb 2023
3 Feb 2023
13 Feb 2023
3 Feb 2023
3 Feb 2023 - 7 Feb 2023
Amount
Item Description/ Heading
Old both side fusible plug opening boring threading labour chrges
New fusible plug both side & same position fitting with IBR T.C
Cboiler all valve mounting repairing, overhauling & instection by boiler inspector, with consumable & Labour charges
Isolated peeting of different shell strake to be build up by MMAW process unsing low hydrogen electrode and gring smooth
Complete brick work of both side flue pass, bottom of the boiler both side furnace with materials & labour charges
Fabication & fitting of fire bar of L/boiler at both side furnace with cost of cost & electrode
Supply & fitting of 20" long 3/4 dia gauge glass tube
Supply & fitting of 8 inch dail pressure gauge (o-300 lbs)
Changing of manhole stud (40mm dia x 250 mm long man hole stud) a) Man hole stud
b) Fabrication & fitting of Man hold brize
c) Labour charges for removing of old stud by gas cutting & fitting of new one with arc welding
a) Welding of blow down bend through out the lengh & grid smooth to make the original shape
Making New Guard Wall between two Boiler
Lancashire boiler hydraulic test arrangement by inspector (Director of Boiler)
Lancashire boiler fitting purches materials tape joint, cotton tape, steam joint, hole tight, nut bolt, rubber joint, fibre bush, rubber cone gauge glass etc
Lancashire boiler fitting , commissioning steaming & running condition with consumable & labour charges
Total impact of GST for the purpose of CTC
GHOSH ENGINEERING
SABIR CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .