Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance NO 02 HYPERIONIT PRIVATE LIMITED 50TH STREET ASHOKNAGAR CHENNAI TAMIL NADU 600083 | CHENNAI | TAMIL NADU | 600083 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
22 Jan 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Mr. Rajnikant Patel
EPC Constructions India Limited, 27th km, Surat Hazira Road, Near Hazira Police Station, Surat-394270
Instrumentation works for HGU-205
2020_DGMMC_7646_1
EPCC/CPCL/RLNG/209
Limited
Instrumentation-Goods
Item Rate
150 days
CPCL, Manali
Please refer Tender Documents
9 documents required · 9 mandatory
₹0
Exempted
5 Mar 2021
24 Dec 2020
22 Jan 2021
24 Dec 2020
22 Jan 2021
1 Jan 2021
25 Dec 2020 - 19 Jan 2021
120 days
Amount
UNIT HGU-205
PART A: ERECTION, INSTALLATION, TESTING, COMMISSIONING SUPPORT & HANDOVER OF FOLLOWING INSTRUMENTATION ITEMS :
Installation of Pressure transmitter (with or without integral manifold) inclusive of mounting of instrument on yoke (if required), supply and erection of supports (other than yoke) wherever required, fabrication and installation of impulse lines with supports as per standards indicated below, hydraulic testing, DP testing, radiography and painting of supports and impulse lines excluding supply of instrument, piping materials, yoke, all electrical/pneumatic connections and calibration. Installation charges include shifting of materials from site- store/yard to installation location, consumables, tools & tackles, man power, accessories installation (fittings, integral manifold, etc), submission of reports, etc. all complete as per specification and direction of Engineer- in-charge.
Installation of pressure instruments as per Process Hookup No. 1063-205-006-23-0001, page 20 of 64, Pipe Class A1A
Installation of pressure instruments as per Process Hookup No. 1063-205-006-23-0001, page 21 of 64, Pipe Class A1K
Installation of pressure instruments as per Process Hookup No. 1063-205-006-23-0001, page 22 of 64, Pipe Class B1A
Installation of pressure instruments as per Process Hookup No. 1063-205-006-23-0001, page 18 of 64, Pipe Class B1K
Installation of pressure instruments as per Process Hookup No. 1063-205-006-23-0001, page 23 of 64, Pipe Class B5A
Installation of pressure instruments as per Process Hookup No. 1063-205-006-23-0001, page 19 of 64, Pipe Class D1A
Installation of pressure instruments as per Process Hookup No. 1063-205-006-23-0001, page 24 of 64, Pipe Class D1A
Installation of pressure instruments as per Process Hookup No. 1063-205-006-23-0001, page 28 of 64, Pipe Class D2A
Installation of pressure instruments as per Process Hookup No. 1063-205-006-23-0001, page 29 of 64, Pipe Class D2D
Installation of pressure instruments as per Process Hookup No. 1063-205-006-23-0001, page 25 of 64, Pipe Class D5D
Installation of pressure instruments as per Process Hookup No. 1063-205-006-23-0001, page 30 of 64, Pipe Class D5D
Installation of pressure instruments as per Process Hookup No. 1063-205-006-23-0001, page 26 of 64, Pipe Class D91M
Installation of pressure instruments as per Process Hookup No. 1063-205-006-23-0001, page 27 of 64, Pipe Class D91M
Installation of Differential Pressure transmitter (with or without integral manifold) inclusive of mounting of instrument on yoke (if required), supply and erection of supports (other than yoke) wherever required, fabrication and installation of impulse lines with supports as per standards indicated below, hydraulic testing, DP testing, radiography and painting of supports and impulse lines excluding supply of instrument, piping materials, yoke, all electrical/pneumatic connections and calibration. Installation charges include shifting of materials from site- store/yard to installation location, consumables, tools & tackles, man power, accessories installation (fittings, integral manifold, etc), submission of reports, etc. all complete as per specification and direction of Engineer- in-charge.
Installation of differential pressure instruments, as per Process Hookup No. 1063-205-006-23-0001,page 30 of 64, Pipe Class D5D
Installation of differential pressure instruments, as per Process Hookup No. 1063-205-006-23-0001, page 31-33 of 64, Pipe Class D5D & D91M
Installation of differential pressure instruments, as per Process Hookup No. 1063-205-006-23-0001, page 64 of 64, Pipe Class D1D
Installation of line mounted/ remote mounted Pressure gauge (direct/ surface mounted) inclusive of mounting of instrument on yoke (if required), supply and erection of supports (other than yoke) wherever required, fabrication and installation of impulse lines with supports as per standards indicated below, hydraulic testing, DP testing, radiography and painting of supports and impulse lines excluding supply of instrument, piping materials, yoke and calibration. Installation charges include shifting of materials from site-store/yard to installation location, consumables, tools & tackles, man power, accessories installation (fittings, integral manifold, etc), submission of reports, etc. all complete as per specification and direction of Engineer-in-charge.
Installation of Pressure gauges/accessories as per Process Hookup No. 1063-205-006-23-0001,Page 3 & 8 of 64, Pipe Class A1A
Installation of Pressure gauges/accessories as per Process Hookup No. 1063-205-006-23-0001,Page 9 of 64, Pipe Class A1K
Installation of Pressure gauges/accessories as per Process Hookup No. 1063-205-006-23-0001,Page 10 of 64, Pipe Class B1A
Installation of Pressure gauges/accessories as per Process Hookup No. 1063-205-006-23-0001,Page 4 of 64, Pipe Class B1K
Installation of Pressure gauges/accessories as per Process Hookup No. 1063-205-006-23-0001,Page 11 of 64, Pipe Class B5A
Installation of Pressure gauges/accessories as per Process Hookup No. 1063-205-006-23-0001,Page 12 of 64, Pipe Class B5D
Installation of Pressure gauges/accessories as per Process Hookup No. 1063-205-006-23-0001,Page 5-7,13 of 64, Pipe Class D1A
Installation of Pressure gauges/accessories as per Process Hookup No. 1063-205-006-23-0001,Page 16 of 64, Pipe Class D2A
Installation of Pressure gauges/accessories as per Process Hookup No. 1063-205-006-23-0001,Page 17 of 64, Pipe Class D2D
Installation of Pressure gauges/accessories as per Process Hookup No. 1063-205-006-23-0001,Page 14 of 64, Pipe Class D5D
Installation of Pressure gauges/accessories as per Process Hookup No. 1063-205-006-23-0001,Page 15 of 64, Pipe Class D91M
Installation of temperature transmitter remote mounted inclusive of mounting on yoke, fabrication and erection of supports (other than yoke), painting of supports but exclusive of supply of transmitter, yoke, all electrical connections and calibration. Installation charges include shifting of materials from site-store/yard to installation location, consumables, tools & tackles, man power, accessories installation, submission of reports, etc. all complete as per specification and direction of Engineer-in-charge.
Installation of temperature transmitters, as per Typical Instrument Installation Drawings No. 1063-901-006-41-0001
Installation of temperature gauges/ thermocouples/RTDs with flanged thermowell excluding supply of gauges/thermocouples/RTDs/thermowell, calibration and all electrical connections. Installation charges include shifting of materials from site- store/yard to installation location, consumables, tools & tackles, man power, accessories installation, submission of reports, etc. all complete as per specification and direction of Engineer-in-charge.
Installation of temperature instruments, Temperature Element with Thermowell, as per Process Hookup No. 1063-205-006-23-0001,Page 34 of 64.
Installation of temperature instruments,Thermowell, as per Process Hookup No. 1063-205-006-23-0001,Page 36 of 64.
Installation of temperature instruments, Temperature Gauge with Thermowell,as per Process Hookup Drawing No. 1063-205-006-23-0001,Page 40 of 64.
Installation of skin type temperature Elements, as per Process Hookup Drawing No. 1063-205-006-23-0001,Page 37 of 64.
Installation of Multipoint temperature Elements, as per Process Hookup Drawing No. 1063-205-006-23-0001,Page 38 of 64.
Installation of Flow transmitter (with or without integral manifold) inclusive of mounting of instrument on yoke (if required), supply and erection of supports (other than yoke) wherever required, fabrication and installation of impulse lines with supports as per standards indicated below, hydraulic testing, DP testing, radiography and painting of supports and impulse lines excluding supply of instrument, piping materials, yoke, all electrical/pneumatic connections and calibration. Installation charges include shifting of materials from site- store/yard to installation location, consumables, tools & tackles, man power, accessories installation (fittings, integral manifold, etc), submission of reports, etc. all complete as per specification and direction of Engineer- in-charge.
Installation of Flow instruments,Flow Transmitter, as per Process Hookup No. 1063-205-006-23-0001, page 46,53 of 64, Pipe Class A1A
Installation of Flow instruments,Flow Transmitter, as per Process Hookup No. 1063-205-006-23-0001, page 59 of 64, Pipe Class A1K
Installation of Flow instruments,Flow Transmitter, as per Process Hookup No. 1063-205-006-23-0001, page 60 of 64, Pipe Class B1A
Installation of Flow instruments,Flow Transmitter, as per Process Hookup No. 1063-205-006-23-0001, page 48,54 & 63 of 64, Pipe Class D1A
Installation of Flow instruments,Flow Transmitter, as per Process Hookup No. 1063-205-006-23-0001, page 55 of 64, Pipe Class D2A
Installation of Flow instruments,Flow Transmitter, as per Process Hookup No. 1063-205-006-23-0001, page 50 of 64, Pipe Class D2D
Installation of Flow instruments,Flow Transmitter, as per Process Hookup No. 1063-205-006-23-0001, page 57 & 61 of 64, Pipe Class D5D
Installation of Magnetic Level Gauge in vessel through 2 inch process connection of vessel along with 3/4 inch Valves and end flanges at vent and drain, The job includes resetting of flaps, resetting and commissioing of the level gauges along with submission of reports, etc. all complete. installation charges include shifting of materials from site- store/yard to installation location, consumables, tools & tackles, man power, accessories installation (fittings, integral manifold, etc), submission of reports, etc. all complete as per specification and direction of Engineer- in-charge.
MLG with C to C distance of 250 mm piping class D2A
MLG with C to C distance of 900 mm piping class D2A
Installation of GWR Level transmitter in vessel through 2 inch process connection of vessel along with 3/4 inch Valves and end flanges at drain, testing and all electrical connections. Installation charges include shifting of materials from site- store/yard to installation location, consumables, tools & tackles, man power, accessories installation (fittings, integral manifold, etc), submission of reports, etc. all complete as per specification and direction of Engineer- in-charge.
Installation of Level instruments,GWR Level Transmitter, as per Process Hookup No. 1063-205-006-23-0001, page 43 of 64, Pipe Class A1A
Installation of Level instruments,GWR Level Transmitter, as per Process Hookup No. 1063-205-006-23-0001, page 44 of 64, Pipe Class D2A
Installation, Termination and commissioning of Mass flow meter
Installation of Junction Box in support, Glanding Termination and Commissioning of flow meter with Density and Flow connection as per Process Hookup No. 1063-205-006-23-0001, page 45 of 64
Calibration, Inspection & Testing, as per Tender Specifications. Cleaning, calibration of instruments listed below including providing necessary equipments, test jig, instrument air, nitrogen cylinders, test reports, all consumable, etc. Calibration charges include shifting of instruments from site-store/yard to calibration site and shifting them back to a safe location after calibration.
Differential pressure transmitters for Flow and DP
Pressure gauges
Pressure transmitters
Temperature gauges
Temperature transmitters
GWR Level transmitters
Fabrication and Erection of Instrument Airline and Fittings (in SS) with proper supports, as per Pneumatic Hookup drawing No. 1063-205-006-23-0002 attached, excluding the supply of SS Pipe & Fittings. All joints shall be Butt Welded, Except for Ball Valves which shall be seal welded.
For size 1/2"
For size 1"
Valve tubing - Pneumatic Hookup, including Leak Testing. Tubing hook up of control valves/ on off valves with air filter regulators, positioners, solenoid valves, etc as applicable as per standards, as per Instrument Pneumatic Hook-Up No. 1063-205-006-23-0002 excluding the supply of tube and tube fittings
Control valves / On Off Valves - 6 mm tubing
Control valves / On Off Valves - 12 mm tubing
Stroke testing / checking of control and on off valves Stroke checking / calibration of valves including adjustment of positioners, limit switches, Lock Relays, AFR, Correction of Gauges, Position Scale, loosening / tigtening of glands, Lubrication of valves, preperation of reports etc.. required for smooth operation of valves but is exclusive of removal and shifting of valves from working location.
Control valves with SMART positioners.
Control valves with SMART positioners, Solenoid Valve and Limit switches
On off valves with Solenoid Valves and limit switches.
Installation of miscellaneous instruments Mounting of miscellaneous instrument items on supports as listed below including supply and erection of supports other than yoke and painting of supports but excluding the supply of instrument items, all electrical/pneumatic connections and calibration. Installation charges include shifting of materials from site-store/yard to installation location, consumables, tools & tackles, man power, accessories installation, submission of reports, etc. all complete as per specification and direction of Engineer-in-charge.
Air Filter Regulators
Solenoid valve
On off valve reset PB station
Junction box installation Installation of weather proof/weatherproof and flameproof Cast aluminium alloy junction boxes including screwing plugs for unused entries and painting but exclusive of fabrication and erection of supports, supply of junction boxes and glands/fittings. Installation charges shall include transportation from site-store/yard to the installation location, erection, alignment, necessary tools and tackles, manpower, etc. all complete as per specification and direction of Engineer-in-charge.
For cable size 6Px1.5MM2 signal/control, , Exproof / Weatherproof type
For cable size 12Px1.5MM2 signal/control, Exproof / Weatherproof type
3 way junction boxes
Civil works Following civil works shall be carried out as per the instructions of Engineer-in-charge
Breaking of RCC wall of thickness 250 mm for fixing of MCT frame of size 6X6 -7 No, the job also involves fixing of the MCT frame and finishing the surface with RCC. Supply of all tools and concreting materials, RCC components required for completion of job is in contractors scope.
Structural Installation of Galvanised Iron pre fabricated perforated trays and its supports at every 1.2 m, including tees, bends and elbows with one coat of primer as per IS:2074 and two coats of finished paints in joints including supply of paint as per standard and necessary weld materials required for fabrication of supports but exclusive of supply of supports and trays
150-200 mm x 30 mm GI Perforated Tray, Hot Dip Galvanised, with out cover
50-60 mm x 20 mm GI Perforated Tray, Hot Dip Galvanised,with out cover
Installation of Pre fabricated GI Cable Duct with cover on existing structural support at every 1.2 meter, this includes reducer, elbow, tee, bend and end cap of duct. The scope involves activities like inter coupling of ducts, coupling of duct with existing structural supports, providing earthing connection for ducts. Cutting of ducts where ever required, making slot in existing structure for securing the duct and covering of duct on completion of cable laying jobs. Tack welding shall be carried out where ever required. The scope excludes supply of ducts, structural materials, nuts , bolts etc... Installation charges include shifting of materials from site- store/yard to installation location, consumables, tools & tackles, man power, accessories installation (couplers, fish plates etc), submission of reports, etc. all complete as per specification and direction of Engineer- in-charge.
800 mm x 300 mm duct
600 mm x 300 mm duct
CABLES (FRLS Armored Instrumentation signal cable, alarm, shutdown, control cable, thermocouple, RTD, Detector and power cable):- Laying of Instrumentation cables in Ducts, Trays, Trenches, etc., including, laying through instrument road crossing, megger testing, glanding and termination at both ends, including in existing Junction Box / System / Marshalling Panel, by opening and identifying spares. Shall also include supply of clamping materials, printed ferrules, tag plates, at both ends, lugs up to 2.5 sq. mm as required. But excluding the supply of cable and cable glands. Installation charges shall include transportation from site-store/yard to the installation location, necessary tools and tackles, consumables (lugs, ferrules, sealing compounds, etc) etc. all complete as per specification and direction of Engineer-in-charge.
1P x 1.5 sq. mm \ 1T X 16AWG Armoured, Overall shielded, Signal Cable.
2P x 1.5 sq. mm Armoured, Individual and Overall shielded, Signal Cable.
12P x 1.5 sq. mm Armoured, Individual and Overall shielded, Signal Cable.
6P x 1.5 sq. mm Armoured, Individual and Overall shielded, Signal Cable.
3C x 2.5 sq. mm, Copper, Armoured, Power Cable.
Loop checking Hot loop checking of instruments including continuity test, troubleshooting, checking the correctness of instrument parameters such as tag no, range, unit, etc at both instrument and control system end, ensuring correctness of installation of line mounted instruments like orifice plates in line with flow direction, inlcuding but not limited to basic tools & tackles (screw driver, valid multimeter, continuity tester, etc.), submission of loop checking reports, etc exclusive of supply of special tools such as HART communicator, process calibrator, etc.
I/O - Analogue Input / Analogue Output / Digital Input / Digital Output.
General site work Identification of instrument items wherever required like transmitters, valves, junction boxes, etc as specified by the engineer-in charge including supply of approved color of paints/ paints (Fluorescent), for painting of tag number (approz 25-50 mm high) along with background painting of 40 - 70 mm High of contrast Dark Color.
Identification of instrument items with 11 Characters per Tag No, Example 205-XX-XXXX
Commissioning assistance Providing technical after commissioing assistance by deploying different categories of skilled personnel as listed below.
Supply of Manpower on man day basis, including tools (Tester, Screwdriver set, Safety Belt and one multimeter), for After commissioning assistance considering 12 hours, Either Day or Night (Inclusive of holidays and off days)- Instrument Technician (Skilled)
Supply of Manpower on man day basis, including (Allen Keys, Pipe wrench, Adjustable Spanners, Safety Belt and Spanner Set), for After commissioning support considering 12 hours, Either Day or Night (Inclusive of holidays and off days)- Helper (Un-Skilled)
Supply of cleaning Manpower on man day basis, including (Cleaning Materials like cloths, broom, bucket and moping materials), for cleaning floors and materials 8 hours in Day - Helper (Un-Skilled)
Rental of walkie talkie Supply of intrinsically safe (IEC zone 1, Gas group IIC) digital walkie talkie on monthly rental basis including supply of charger and battery. It shall have 5Km radial distance coverage.
Weekly rental rate for 3 set of walkie talkie - 6 Nos total, Motorola XiR P8668i Model or Equivalent.
PART B: SUPPLY AND INSTALLATION OF ITEMS SUPPLY AND INSTALLATION OF INSTRUMENTATION CONSUMABLE ITEMS:
Supply and Installation of FRP Prefabricated sunshade / canopy suitable for each transmitters, switches, Junction box, smart positioners, etc. (suitable for vertical as well as horizontal mounting), including supports for mounting on the stanchion and alignment. Installation charges include shifting of materials from site- store/yard to installation location, consumables, tools & tackles, etc. all complete as per specification and direction of Engineer-in-charge. The Material shall be supplied by the contractor at the earliest after receipt of LOA/FOA as per instruction of EIC. LOA/FOA.
Canopies for local instruments, transmitters as per standard attached
Canopies for one JB as per standard attached
Supply and installation of 2" Galvanized steel yoke support for instruments wherever applicable including supply, fabrication and erection of instrument yoke of all types as per standard drawing attached and painting of yoke supports but exclusive of mounting of instruments on supports, and structural materials like angles, plates and flats. Installation charges include shifting of materials from site-store/yard to installation location, consumables (Paints, Anchoring bolts, J bolts, Cementing materials, fasteners and welding rods), tools & tackles, etc. all complete as per specification and direction of Engineer-in-charge. The Material shall be supplied by the contractor at the earliest after receipt of LOA/FOA as per instruction of EIC. LOA/FOA.
2" Pipe Schedule 40. MOC: Galvanized Steel for fabrication of Yoke as per standards attached, inclusive of Anchor bolts, Cementing material etc required for fabrication of yoke.
PART C: SUPPLY OF ITEMS SUPPLY OF INSTRUMENTATION CONSUMABLE ITEMS:
All supporting structural material like MS Angles, ISMC MS Channels and MS Plates of Jindal, TATA, ESSAR and SAIL make as per specifications, required for Supports for junction boxes, instruments, trays, tubes, etc. The Material shall be supplied by the contractor at the earliest after receipt of LOA/FOA as per instruction of EIC.
Supply of instrument items as per specifications given in the tender, For Hydrocarbon (Process Hookup) and Pneumatic (Inst. Air) Hookup. The Material shall be supplied by the contractor at the earliest after receipt of LOA/FOA as per instruction of EIC.
TUBE, 12 mm x 1.65 mm WALL THK.,SS 316.
TUBE, 6 mm x 1.2 mm WALL THK.,SS 316.
Two Ferrule compression Male Connector,12 mm OD x 1/2" NPT(M),SS 316.
Two Ferrule compression Female Connector,12 mm OD x 1/2" NPT(F),SS 316.
Two Ferrule compression Male Connector, 6 mm OD x 1/2" NPT(M),SS 316.
Two Ferrule compression Male Connector, 6 mm OD x 1/4" NPT(M),SS 316.
1/4" NPT(M) Dummy MOC: SS304.
SYPHON,1/2" NPT (M), SS316, IBR Certified
Condensate Pot 4 Inch with 4 No 1/2" NPT(F) connection IBR Certified, MOC: A106 Gr.B
Condensate Pot 4 Inch with 4 No 1/2" NPT(F) connection IBR Certified, MOC: A335 Gr.P11
Instrument ball valves Trim and Body SS304, 1/2" Threaded, 800#
EQ. TEE BW Connection, SS304, 1"
EQ. TEE BW Connection, SS304, 1/2"
UnEqual TEE BW Connection, SS304, 1" x 1/2"
Elbow BW Connection, SS304, 1"
Elbow BW Connection, SS304, 1/2"
Cap Scrd. NPT (F), SS304, 1"
Cap Scrd. NPT (F), SS304, 1/2"
Supply of Miscellaneous instrument items as per specifications given in the tender. The Material shall be supplied by the contractor at the earliest after receipt of LOA/FOA as per instruction of EIC.
Double Compression Stainless Steel, 1/2 Inch Cable gland suitable for Armoured Cable, Gas Group -IIC with Rubber Shrouds.
Double Compression Stainless Steel, 3/4 Inch Cable gland suitable for Armoured Cable, Gas Group -IIC with Rubber Shrouds.
Double Compression Stainless Steel, 1 Inch Cable gland suitable for Armoured Cable, Gas Group -IIC with Rubber Shrouds.
Double Compression Stainless Steel, 1 1/4 Inch Cable gland suitable for Armoured Cable, Gas Group -IIC with Rubber Shrouds.
Double Compression Stainless Steel, 1 1/2 Inch Cable gland suitable for Armoured Cable, Gas Group -IIC with Rubber Shrouds.
1/2 Inch Dummy Plug Suitable for Gas Group IIC
1 1/2 Inch Dummy Plug Suitable for Gas Group IIC
1 1/4 Inch Dummy Plug Suitable for Gas Group IIC
1 1/4 Inch ET Gland Stainless Steel, for Armoured Cable, Safe Area
Ex-Proof (Ex-D, Group-IIC) Junction Box loaded with 48 Terminal Block, 14 Nos - 1/2 inch cable Side Entry, 2 Nos - 1 1/4 Inch Cable Bottom Entry without glands. MOC: LM-6.
IP 66, Ex-e, Weather-Proof Junction Box loaded with 48 Terminal Block, 14 Nos - 1/2 inch cable Side Entry, 2 Nos - 1 1/4 Inch Cable Bottom Entry without glands. MOC: LM-6.
8 cm X 3 cm self adhesive engraved or embossed trifoliate or stainless steel name plate
10 Sq.mm earthing cable
Supply of Galvanised steel Flanged Multi cable transit (MCT) Frame consisting of blocks, module, lubricant, Wedge compression unit, Wedge clip, stay plate and other accessories, MCT Block \ module shall be peel off type with center. The Material shall be supplied by the contractor at the earliest after receipt of LOA/FOA as per instruction of EIC.
MCT Block 6+6 - 7 Nos consisting of Block size 40: 108 Nos, Block size 20: 54 Nos, Block Size 30: 24 Nos.
PART D: Dismantling of instrument items
Dismantling of following instrument items including cleaning, tagging and handing over the dismantled items to Owner designated place in proper working condition. The scope is exclusive of removal of stanctions and piping materials, but includes removal of cable termination and cable glands.
Transmitters - Pressure, Differential pressure, Level and temperature, capillary and non-capillary type.
I/P converters, Positioners and AFR from Control Valve, excludes removal of valves.
Solenoid Valve, Limit switch Boxes from ON/OFF Valves, excludes removal of valves
Local gauges - Pressure and temperature
Branch cables
FRANKLIN IME TECHS PVT LTD
HYPERIONIT PVT LTD
www.inovonz.com
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .