Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹85.8 LAdmitted-Finance PREM NAGAR ROAD NO 06 LATMA ROAD HATIA RANCHI | RANCHI | JHARKHAND | 829205 | -4.99% | ₹85.8 L | L1 | Admitted-Finance |
| 2 | L2₹87.1 LAdmitted-Finance FLAT NO 204 SAI ENCLAVE DIPATOLI NEAR KHELGAON CHOWK BARIATU RANCHI | RANCHI | -3.55% | ₹87.1 L | L2 | Admitted-Finance |
| 3 | L3₹88.0 LAdmitted-Finance | -2.55% | ₹88.0 L | L3 | Admitted-Finance |
| 4 | L4₹90.3 LAdmitted-Finance AMROOD BAGAN RATU ROAD DIST RANCHI | RANCHI | RANCHI | JHARKHAND | 834001 | +0.00% | ₹90.3 L | L4 | Admitted-Finance |
| 5 | Rejected-Technical GROUND FLOOR JESAL HOME DR PREM KUMAR HARIHAR SINGH ROAD BARIYATU RANCHI JHARKHAND 834009 | RANCHI | RANCHI | JHARKHAND | 834009 | - | - | - | Rejected-Technical Non Responsive |
Tender Value
₹90.3 L
EMD Value
₹1.8 L
Closing Date
25 Mar 2026, 5:00 pmClosed
EE RMC
RMC
Construction of PCC Road and RCC Drain at Rita shree Banquet Hall to shivaji Nagar under Ward No 05 of RMC
2026_UDD_111863_1
245/Eng 2026
Open Tender
Civil Works
Works
270 days
AS PER NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹1.8 L
20 Aug 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, levelling, ramming the foundation trenches removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. | - | m3 | - | - |
| 2Providing ,supplying & spreading of stone dust in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of materials , labour, royality and taxes all complete as per specification and direction of E/I (Mode of measurement compacted volume) | |||||
| 3Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. | |||||
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level1:1.5:3 (1 Cement : 1.5 coarse sand zone(III): 3 graded stone aggregate 20mm nominal size) | |||||
| 5Reinforced cement concrete work in walls (any Thickness), including attached pilasters, buttresses, abutments, posts and structs etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) | |||||
| 6Reinforced cement concrete work in beams, suspended floors, foors having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five lvevel, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (Zone-III) : 3 graded stone aggregate 20mm nominal size). | |||||
| 7Providing Tor steel reinforcement of 8mm ,10 mm, 12 mm and 16 mm dia rods bars as per approved design and drawing with cutting , bending and binding with annealed wire with cost of wire ,removal of rust , placing the rods in postion ( excluding carriage of bars to work site) , all complete as per building specification and direction of E/I.TMT Fe 500 ( only valid for SAIL and TATA steel , JSPL, Electro steel Ltd Bokaro and Vizag (RINL) 8mm | |||||
| 810mm | |||||
| 9Centering and Shuttering including strutting, propping etc and removal of from for Foundation , footing , bases of columns etc for mass concrete. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
Tendernotice_2.pdf
PDF • 1.73 MB
BOQ_151035.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].