Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 CrAccepted-AOC UNIT NO 301 ABH TOWN SQUARE NEAR CITY CENTER MALL NASHIK TAL AND DIST NASHIK | NASHIK | NASHIK | MAHARASHTRA | L1 | Accepted-AOC L1 | |
| 2 | L2₹19.8 Cr+₹87.9 L (4.64%)Rejected-AOC 03 GROUND FLOOR LAXMI APARTMENT NEAR SINDHI COLONY JALGAON | JALGAON | MAHARASHTRA | L2 | Rejected-AOC L2 |
Tender Value
₹23.3 Cr
EMD Value
₹11.7 L
Closing Date
7 Jun 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Pravin Sarnayak Executive Engineer
Office of the Executive Engineer, World Bank Project Division, Akola- 444 001
Construction of Family Court Building At Akola District Akola including Electification
2023_PWR_906616_1
WBP/AKL-ETN-05-01/Open/2023-24
Open Tender
Civil Works - Buildings
Item Rate
400 days
Akola District
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹11.7 L
Yes
office of the Chief Engineer, P.W. Region, Amravat
7 Dec 2023
23 May 2023
9 Jun 2023
23 May 2023
7 Jun 2023
23 May 2023
29 May 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Proposed Construction of Family Court Building at Akola Tq. and Distt. Akola Including Electrification | |||||
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. Spec.No. MORTH 201 | 3,652 | One Square Meter | - | - |
| 3 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Spec. No. : Means Bd.A.1 Page No.259 | 525.95 | One Cubic Meter | - | - |
| 4 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means Spec.No. : Means Bd.A.2 Page No.259 | 825.62 | One Cubic Meter | - | - |
| 5 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift 1.5 to 3.0m.) By Mechanical Means Spec.No. : Bd.A.3, Page No. 259. | 787.82 | One Cubic Meter | - | - |
| 6 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means Spec.No. : Bd.A.4, Page No. 259. | 641.55 | One Cubic Meter | - | - |
| 7 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material up to a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/murum watering, ramming etc. complete. (Lift up to 1.5m). By Mechanical Means Spec.No. : Bd.A.6, Page No. 260. | 554.85 | One Cubic Meter | - | - |
| 8 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed. Spec. No. MORTH 305 | 1,373.02 | One Cubic Meter | - | - |
| 9 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. B Spec. No. As Directed By Engineer In Charge. | 3,357.52 | One Square Meter | - | - |
| 10 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per square metre of surface area covering ten years guarantee on bond paper. Spec. As directed by Engineer in charge. | 1,179.71 | One Square Meter | - | - |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1580736.xls
BOQ Document • 4.12 MB
121494731.pdf
Tender Document • 1.16 MB
Booklet-05.pdf
Tender Document • 3.44 MB
121494733.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .