Construction of boundary wall, drinking water and additional classroom at Chintaguda K Primary School
2026_PBNAR_134781_14
TCN-02/2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
NARAYANPATNA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
BDO NARAYANPATNA
₹14,900
Yes
10 Jul 2026
10 Jul 2026
5 Aug 2026
10 Jul 2026
31 Jul 2026
10 Jul 2026
10 Jul 2026 - 31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earthwork excavation in hard of soil including stoney earth in foundation with all lifts, delifts and leads including dressing and levelling the bed and depositing excavated earth at place away from work site including dewatering, shuttering, cost of labour, royalty and T and P sundries required for the work etc complete as per direction of Engineer-in-Charge | 61.87 | Cum | 318 | ₹19,674.66 |
| 2 | Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T and P required for the work etc. complete in all respect as per direction by the Engineer in charge | 31.49 | Cum | 727 | ₹22,893.23 |
| 3 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm size clean hard black C.B granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm (6") thick to the required level ramming, watering, curing etc complete including cost, conveyance, royalties and taxes of all materials with all labour and T and P required for the work etc complete in all respect and as per the direction of the Engineer-in-charge. | 17.52 | Cum | 6,468.2 | ₹1,13,322.86 |
| 4 | Random rubble stone masonry in cm (1:6) in foundation and plinth by using hard black broken granite stone including splays cutting bond stones from approved quarry including circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering, curing including cost, conveyance, royalties and taxes of all materials with all labour and T and P required for the work complete in all respect as per direction of Engineer-in-Charge. | 36.53 | Cum | 5,329.9 | ₹1,94,701.25 |
| 5 | Fly ash brick masonry in cement mortar (1:6) in super structure using C.B Bricks 23cm x 11cm x 8cm size having crushing strength not less than 35Kg/sqcm with dimension tolerance plus 8 percent including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, royalties and taxes of all materials with all labour and T and P required for the work complete in all respect direction of Engineer-in-Charge
GROUND FLOOR | 34.34 | Cum | 5,579 | ₹1,91,582.86 |
| 6 | Cemert concrete of prop (1.2.4) with 12 mm hard granite C B chips of approved quality from approved quarry free from weathered skins and foreign materials incuding hoistng lowering and laying concrete in layers not exceeding 0.15mtr in depth watering and curing for 21 days etc complete including cost of all materials, conveyance. taxes, cess, royalty of materials with labour concrete mixer, vibrator T and P sundries for the work etc Ground Floor | 0.37 | Cum | 8,070.7 | ₹2,986.16 |
| 7 | R.C.C work of M20 in following works using 12mm to 20 mm (1/2" to 3/4") size ( 20 mm not exceed 25 percentage) hard black broken granite stone chips approved quarry free from including hosting, lowering, lying and compacting concret, watering curing, centering, shuttering, conyeyance, royalities, taxes of all material with all labour and T and P, required for the works etc. complete in all respect but excluding the cost of conveyance oc M.S. rods ot Tor steel and binding wire of 18 to 20 guage and labour charges for straighting, cutting, bending, binding and tying the grills and placing it proper position and as per the direction of the Engineer-in-Charge. Column Base | 5.02 | Cum | 6,900.1 | ₹34,638.5 |
| 8 | Coloumn | 3.54 | Cum | 16,282.9 | ₹57,641.47 |
| 9 | Plinth Beam | 3.69 | Cum | 7,774.5 | ₹28,687.91 |
| 10 | Lintel | 1.59 | Cum | 14,613.9 | ₹23,236.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.22 MB
DTCN.pdf
Tender Documents • 1.38 MB
BOQ_600267.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].