| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC | ₹6.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹7.0 L+₹9,343.44 (1.36%)Rejected-AOC A 238 AWAS VIKAS COLONY CIVIL LINE BADAUN | BADAUN | BADAUN | UTTAR PRADESH | ₹7.0 L+₹9,343.44 (1.36%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹7.2 L+₹35,711 (5.21%)Rejected-AOC | ₹7.2 L+₹35,711 (5.21%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹7.6 L+₹74,346.60 (10.8%)Rejected-AOC | ₹7.6 L+₹74,346.60 (10.8%) | L4 | Rejected-AOC Rejected |
| 5 | L5₹8.2 L+₹1.3 L (18.9%)Rejected-AOC | ₹8.2 L+₹1.3 L (18.9%) | L5 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | RAJKUMARI L3 | M/S DINESH KUMAR SINGH L2 | M/S J K INTERLOCKING BRICKS L4 | M/S DEVENDRA PAL SINGH L5 | M/S AMAR PAL SINGH CONTRACTOR L7 | M/S MADAN LAL CONTRACTOR & SUPLAYARS L1 | SURENDRA PAL CONTRACTOR AND SUPPLIER L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in cutting in making slope for pitching i/c disposal of excavated earth beyond 30 m all lift ramming & dressing the surface to the required level & slope and also i/c T&P etc. required for completion of work. | 117 | M3 | 50 ₹5,850 Lowest | 50 ₹5,850 Lowest | 100 ₹11,700 | 66 ₹7,722 | 67.94 ₹7,948.98 | 60 ₹7,020 | 60 ₹7,020 |
| 2.00 | Supply of old/used E.C. bags and Filled with RBM / Silt, sewing with sutli & suja, placing in position in NRC or in loose including carriage, loading, unloading, all cost of material, stacking, T&P and Taxes etc. required for all completion of work. | 30,617 | No. | 12 ₹3,67,404 Lowest | 14.61 ₹4,47,314.37 | 13.5 ₹4,13,329.5 | 17 ₹5,20,489 | 19.5 ₹5,97,031.5 | 12.5 ₹3,82,712.5 | 17.1 ₹5,23,550.7 |
| 3.00 | Collection of silt/sand from river bed be by mud pump i/c stacking, dressing & levelling T&P etc. for completion of work. | 325.01 | M3 | 70 ₹22,750.7 Lowest | 77 ₹25,025.77 | 80 ₹26,000.8 | 105.6 ₹34,321.06 | 104.28 ₹33,892.04 | 120 ₹39,001.2 | 91.2 ₹29,640.91 |
| 4.00 | Supplying of Nylon Rope Crate, size (1.0mx1.0mx1.0m) with mesh size 20.0 x 20.0 cm and weight not less than 300 gram, including all cost of material, carriage, loading, unloading, staking, T&P and Taxes etc. required for all completion of work. | 700 | No. | 40 ₹28,000 Lowest | 48 ₹33,600 | 45 ₹31,500 | 73 ₹51,100 | 71.1 ₹49,770 | 60 ₹42,000 | 62.5 ₹43,750 |
| 5.00 | Supply and Filling of Geo Bags made of 200 GSM woven fabric confirming to 15351(2015) of size 1.09m x 0.69m at site per Cum i/c all complete work. | 107.4 | M3 | 1,900 ₹2,04,060 | 1,175 ₹1,26,195 | 2,050 ₹2,20,170 | 1,078 ₹1,15,777.2 Lowest | 1,572 ₹1,68,832.8 | 1,300 ₹1,39,620 | 1,373 ₹1,47,460.2 |
| 6.00 | Supply of 9mm, 4 Stands Polypropylane (PP) Rope Gabion Size (1.8m X 1.8m X 0.5m) with lid only, 150x150mm mesh size Confirming to I.S. 5175:1992 (Reaffirmed 1997) at work site excluding all taxes but including C.profit. | 72 | No. | 1,300 ₹93,600 | 796 ₹57,312 Lowest | 800 ₹57,600 | 1,200 ₹86,400 | 1,066.5 ₹76,788 | 1,050 ₹75,600 | 931.5 ₹67,068 |
Tender Value
₹11.8 L
EMD Value
₹24,000
Closing Date
3 Jun 2026, 11:00 amClosed
Executive Engineer Flood Division Budaun
Executive Engineer Flood Division Budaun Near LIC Office Awas Vikas Colony Civil Line Buduan
Making of stud No. 1 near village Simariya Dedu on left bank of Ramganga river in Distt. Budaun.
2026_UPIDC_1155019_11
01/EE/2026-27
Open Tender
Civil Works
Item Rate
Budaun
Please refer Tender documents.
3 documents required · 3 mandatory
₹354
₹24,000
Yes
19 Jun 2026
28 May 2026
3 Jun 2026
28 May 2026
3 Jun 2026
28 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting in making slope for pitching i/c disposal of excavated earth beyond 30 m all lift ramming & dressing the surface to the required level & slope and also i/c T&P etc. required for completion of work. | 117 | M3 | - | - |
| 2 | Supply of old/used E.C. bags and Filled with RBM / Silt, sewing with sutli & suja, placing in position in NRC or in loose including carriage, loading, unloading, all cost of material, stacking, T&P and Taxes etc. required for all completion of work. | 30,617 | No. | - | - |
| 3 | Collection of silt/sand from river bed be by mud pump i/c stacking, dressing & levelling T&P etc. for completion of work. | 325.01 | M3 | - | - |
| 4 | Supplying of Nylon Rope Crate, size (1.0mx1.0mx1.0m) with mesh size 20.0 x 20.0 cm and weight not less than 300 gram, including all cost of material, carriage, loading, unloading, staking, T&P and Taxes etc. required for all completion of work. | 700 | No. | - | - |
| 5 | Supply and Filling of Geo Bags made of 200 GSM woven fabric confirming to 15351(2015) of size 1.09m x 0.69m at site per Cum i/c all complete work. | 107.4 | M3 | - | - |
| 6 | Supply of 9mm, 4 Stands Polypropylane (PP) Rope Gabion Size (1.8m X 1.8m X 0.5m) with lid only, 150x150mm mesh size Confirming to I.S. 5175:1992 (Reaffirmed 1997) at work site excluding all taxes but including C.profit. | 72 | No. | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_2163588.xls
BOQ • 0.27 MB
NIT.pdf
Tender Documents • 3.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .