Tender Value
₹65.6 L
Closing Date
29 Apr 2021, 3:00 pmClosed
Executive Engineer (Electrical)
Engineering Unit, Admin Block 3rd Floor, IIT Madras CHENNAI-600036
Providing HT/LT Equipment and allied cable works for the newly constructed substation near G1 type Quarters inside IITM Premises
2021_IITM_76038_1
11/2021-22/ELDB
Open Tender
Electrical Works
Item Rate
120 days
IIT MADRAS CHENNAI
All required documents as specified in tender
2 documents required · 2 mandatory
₹0
Exempted
6 May 2021
19 Apr 2021
30 Apr 2021
20 Apr 2021
29 Apr 2021
22 Apr 2021
20 Apr 2021 - 21 Apr 2021
Amount
DISTRIBUTION TRANSFORMER
Supply, Erection, Testing and Commissioning of 1000kVA 11kV /433V mineral oil filled ONAN type outdoor type Distribution Transformer with complete fittings and accessories as per the enclosed Technical Specification.
Supply
Erection
BUS BAR TRUNKING
Supplying, installing by suspension on ceiling, testing and commissioning of 2000A 50kA SC for 1 Sec capacity Sandwich Type Bus Bar Trunking for use on 3 phase 4 wire 415 volts, 50Hz A.C. supply with metal clad enclosure having IP-65 rating after fixing all accessories, made of 1.6mm thick steel sheet duly powder coated in convenient sections complete with 4 Nos aluminium bus bars having current density of 130 A/ sq cm at nominal current rating, necessary joints, elbow joints & expansion joints and bends, fire barrier at each floor, provision of tapping at every metre, adopter box and copper flexible for joints, continuous earthing with 2 Nos aluminium strip of suitable size (one on each side) including, G.I. clamping brackets, suspenders, angle iron bracket, steel fasteners.
CABLES AND TERMINATIONS
Supplying and Laying of following sizes 11kV (E) HT UG Aluminium armoured XLPE Power cable in a 100 mm dia HDPE DWC pipe in a trench of 50cm wide and 100cm depth including earth work excavation in all soils and sub soils and back filling, consolidated in a regular interval of 25cm thick rammed and complying with standard specification.The rate should be inclusive of cable route markers at every 50m interval as decided by the Engineer Incharge
3C X 120 sqmm
3C X 240 sqmm
Supplying and making Straight Through Joints for the following sizes of 11kV (E) HT UG Aluminium armoured XLPE Power cable with suitable lug / Ferrules socket and using necessary jointing materials with RPG make heat Shrinkable Joint Kit.
3C x 240 Sqmm
Supplying and Terminating the ends of the following 11kV (E) HT UG Aluminium armoured XLPE Power cable with suitable lug / Ferrules sockets and necessary jointing materials with Rhychem heat Shrinkable Joint Kit.
3C X 120 sqmm
3C X 240 sqmm
Supplying& Laying of following sizes PVC XLPE insulated alu. Conductor armored LTUG cable in a 50 mm to 100 mm dia HDPE DWC pipe in a trench of 50cm wide and 75cm depth including earth work excavation in all soils and sub soils and back filling, consolidated in a regular interval of 25cm thick rammed and complying with standard specification.
3.5c X 400 sq.mm ( Alu)
3.5c X 240 sqmm ( Alu)
3.5c X 150 sqmm ( Alu)
2R x 4C x2.5 Sqmm (Cu)
Supplying and making end termination for following sizes alu. Conductor LT UG cable using suitable compression gland with required copper ferulles / socket and other jointing materials
3.5c X 400 sq.mm( Alu)
3.5c X 240 sqmm ( Alu)
3.5c X 150 sqmm( Alu)
2R x 4C x2.5 Sqmm (Cu)
EARTHING
Supply, Erection, Testing and Commissioning of Cast iron pipe and copper plate earth as per IS - 3043 - 1987 including excavation of soil and sub soil , back filling with equal layers of salt and charcoal and the excavated soil , ramming, consolidating, Masonry construction, heavy duty cover slab etc. The CI pipe should be 100mm dia and 3mt long bolted with 600 x 600 x 3 mm thick copper plate at the bottom. 2R of 50 x 3 mm copper flats should be taken from the copper plate to the top of the CI pipe and clamping with suitable clamps
Earthing the installation with the following sizes of earth wires. The rate shall be inclusive of spacer clamp for main earth flat suitable clamping with the MS flats for earth wires including crimping of socket etc.or laying below 0.5m from ground level including earth work excavation and refilling the excavated soil.
50 x 10 mm GI Flat
50 x 5 mm GI Flat
25 x 5mm GI flat
MV PANELS
Supply , Erection,Testing and commissioning of suitable size extendable floor mounting cubical type following LT Main Panel board suitable for 415V 3ph 4 wire 50Hz AC supply system fabricated in a compartmentalized design from CRCA sheet steel of 2mm thick for frame works and cover with 3mm thick removable gland plate ,cleaning and finishing with 7 tank process for powder coating with siemens grey having extensible type TPN copper alloy busbar of suitable capacity as per the incomer ACB /MCCB/SDF ratings with DMC/SMC busbar suppotrs , bottom base channel of 100mmX 50mm X 5mm. .The In/Out going Cable entry should be from the rear side of the panel.
BUS BARS
Bus bars will be electrolytic copper , air insulated , R,Y,B, N(Black) PVC sleeved capable of carrying full load current for all the 3 phases + neutral continiously. The current density of copper shall be designed for 1.2A per sqmm. The bus chamber should have proper air ventilators.
EARTHING
2 separate run of 25 x 3 mm copper earth bus painted in green colour should be provided all along the panel and connected to the main grid. Interconnectios should be taken to metering chamber, MCCB's, ACB's, FSU's etc sothat all current carrying components are effectively earthed.
ADDITIONAL SCOPE OF WORK
The scope of work includes removal of existing industrial/cubical type panel after disconnection of cable and reconnecting them to the new panel by excavation of earth out side the building ,minor civil works like breaking of concrete floors ,construction of masonary trench and suitable MS 'П' type channels for the proposed panel as per the instruction from the Engineer in Charge.Necessary Panel drawings , QAPand GTP to be got approved from the Engineer incharge before fabrication.
PANEL-1
Incomer
1600A TP ACB- 1nos (MDO independent manual spring closing mechanism-1no, microprocessor release for o/c, e/f and short circuit protection- 1no, breaker ON/OFF/Trip indication lamps) as two incomers from two different sources.
Bus Coupler
1600A 4P ACB-1No (MDO independent manual spring closing mechanism-1no, microprocessor release for o/c, e/f and short circuit protection- 1no, breaker ON/OFF/Trip indication Lamps/CT's 3 nos and a micro processor based multifunction meter- 1no with suitable wiring for measuring the active and reactive components) as bus coupler and inter locking with 3 locks with two key arrangement.
Outgoings
800A TP ACB -1no (MDO independent manual spring closing mechanism-1no, microprocessor release for o/c, e/f and short circuit protection- 1no, breaker ON/OFF/Trip indication Lamps/CT's 3 nos and a micro processor based multifunction meter- 1no with suitable wiring for measuring the active and reactive components)
630A TPN 35kA MCCB microprocessor release with rotary front operated handle & ON/OFF/TRIP indications - 4 Nos
400A TPN 35kA MCCB microprocessor release with rotary front operated handle & ON/OFF/TRIP indications - 6 Nos
1600A copper bus bars for 3 phases and neutral
3 phase indication lamps with toggle switch-1NO, microprocessor based digital multi function meter with communication port and the facility for active and reactive power measurements -1set with required CTs and control fuses etc for each incomers and BC.Necessary Spreaders / extended copper bus bars of suitable rating with required holes should be provided for the cable and bus bar terminations.The handle should be pad lockable type in both ON/OFF positions.The work should be inclusive of providing mechanical interlocking arrangement by providing 3 locks and 2 keys arrangement.
Supply
Erection
Shifting of the following substation equipments from existing substation by removal of existing HT /LT UG Cables complete from the soil or subsoil up to end terminations , earth connections etc and reerect them in other substation and reterminating the existing/new HT/LT cables with required terminations ( new HT/LT cables will be supplied by IIT if required)with minor trench civil works.The rate should be inclusive of transport, labour/ Machineries and all tools as required.
500kVA 11/0.433kV Distribution Transformer including all accessories
4 Panel 800A HT VCB- 1 Set including MS Channels
440V MV Panel comprising Incomer Feeder 1 & Out going feeder -max 8 Nos.
110V DC Battery and Battery Charger- 1 Set including MS Channels
SAFETY EQUIPMENTS
Supplying & fixing of following Safety equipments as per the instruction of the Engineer Incharge.
2mm thick danger plates made of mild steel with skull and bone mentioning 11kV and 440V - 5 nos each
DCP type fire extinguisher and cylinders fully charged.-2 nos
Safety instruction chart in word duly framed with 5mm glass as required. -1no
GI bucket painted in post office red colour with prior coat of red oxide paint and written with white paint 'FIRE' and mounted on MS angle iron frame with bracket of appro.size & filling of sand etc.-3nos
First aid box kit -1no( with minimum size of 380mm x 380mm)
Shock treat chart duly mounted on a wooden frame( one in English and one in Tamil) with 5mm thick glass required.- 1 set
12mm and 6mm thick rubber mats( each 2 Nos) to withstand 15 kV and 3.3 kV dielectric strength as per IS 15652 - 4 nos
11kV withstand hand gloves- 1 set
Safety Lisence for the Sarayu Substation HT/LT equipments by submitting necessary as built drawings to CEA after completion of all works.
PRIYA ENTERPRISES ELECTRICALS
Saravanan Control Systems
ROYAL ELECTRICAL WORKS
ESSENN POWER CONTROLS PVT LTD
Delhi Electrical Construction
SS Enterprises Electricals
KEVIN ELECTRICALS PVT LTD
Arkensolutions Pvt Ltd.,
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .