Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.5 L+₹14,895.19 (4.47%)Admitted-Fee/PreQual/Technical/Finance | ₹3.5 L+₹14,895.19 (4.47%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.5 L+₹16,707.67 (5.01%)Admitted-Fee/PreQual/Technical/Finance | ₹3.5 L+₹16,707.67 (5.01%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.9 L+₹56,866.56 (17.1%)Admitted-Fee/PreQual/Technical/Finance | ₹3.9 L+₹56,866.56 (17.1%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | V KARTHIKEYAN L1 | BEEMJI ENTERPRISE L2 | Thangavel L4 | R.SHANTHA L3 |
|---|---|---|---|---|---|---|---|
| 1.00Providing CC pavement at Eshwarankovil street at Perunkachi village H/O Kodaikkal Panchayat (Wearing coat) Sholinghur Block Ranipet District | |||||||
| 2.00 | Supplying and centreing for sides and soffits including necessary supports and struttering up to 3.29 M height for plane services as detailed below in all floors with all cross bracing using mild steel sheets of 90x60 cm and 10 BG stiffened with welded mild steel angle of size 25mmx25mmx3mm for boarding laid over silver oak joists of size 10 x6.50cm cm spaced at abote 90 cm centre to centre and supported by casurina props of 10 cm to 30 cm Dia faced at not more than 75 cm centre to centre etc.complete complying with the standard specification (payment for centering shall be given after concrete is laid) | 19.2 | Sqm | 160.5 ₹3,081.6 Lowest | 345 ₹6,624 | 180.5 ₹3,465.6 | 200 ₹3,840 |
| 3.00 | cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 48 | Cum | 5,820.82 ₹2,79,399.36 Lowest | 6,010 ₹2,88,480 | 6,816.82 ₹3,27,207.36 | 6,100 ₹2,92,800 |
| 4.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 50,846.57 ₹50,846.57 Lowest | 53,118.72 ₹53,118.72 | 59,521.13 ₹59,521.13 | 53,395.2 ₹53,395.2 |
Tender Value
₹3.9 L
EMD Value
₹4,000
Closing Date
12 Aug 2026, 3:00 pmClosed
BDO BP
Panchayat Union Sholinghur
Providing CC pavement at Eshwarankovil street at Perunkachi village H/O Kodaikkal Panchayat (Wearing coat) Sholinghur Block Ranipet Distrct
2026_RDTN_688979_1
A2/1853/2026
Open Tender
Civil Works
Item Rate
180 days
Sholinghur
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,000
Yes
11 Sept 2026
28 Jul 2026
12 Aug 2026
28 Jul 2026
12 Aug 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing CC pavement at Eshwarankovil street at Perunkachi village H/O Kodaikkal Panchayat (Wearing coat) Sholinghur Block Ranipet District | - | - | - | - |
| 2 | Supplying and centreing for sides and soffits including necessary supports and struttering up to 3.29 M height for plane services as detailed below in all floors with all cross bracing using mild steel sheets of 90x60 cm and 10 BG stiffened with welded mild steel angle of size 25mmx25mmx3mm for boarding laid over silver oak joists of size 10 x6.50cm cm spaced at abote 90 cm centre to centre and supported by casurina props of 10 cm to 30 cm Dia faced at not more than 75 cm centre to centre etc.complete complying with the standard specification (payment for centering shall be given after concrete is laid) | 1 | Sqm | 182.5 | ₹182.32 |
| 3 | cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | - | Cum | 6,816.82 | - |
| 4 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | - | GST Amount | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.83 MB
BOQ_828203.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .