| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.8 LAccepted-AOC | ₹21.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹23.0 LRejected-Finance | ₹23.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹23.5 LRejected-Finance | ₹23.5 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Sunrise enterprises L2 | RAYMOND RAI L1 | M/s SAI CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50 m and initial lift of 1.5 m. iii) In mixed hard soil (i.e. hard moorum and soil containing laterite and boulders which do not require blasting.) | 100.8 | Cum | 12,297.6 ₹14,511.17 | 11,743.2 ₹13,856.98 Lowest | 12,518.35 ₹14,771.65 |
| 2.00 | Earth Work in excavation of foundation trenches or drains in all sorts of soil(including mixed soil but excluding laterite or sandstone) including removing. Spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches leveling dressing and ramming the bottom . Bailing out water as required complete.(a) Depth of excavation not exceeding 1500 mm. | 0.14 | %Cum | 1,861.4 ₹2,196.45 | 1,777.61 ₹2,097.58 Lowest | 1,894.94 ₹2,236.03 |
| 3.00 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150mm. Including watering and ramming etc. layer by layer complete. (a) with earth obtained from excavation of foundation. | 1.04 | %Cum | 8,944.39 ₹10,554.38 | 8,541.18 ₹10,078.59 Lowest | 9,105.49 ₹10,744.48 |
| 4.00 | Cement concrete with graded stone ballast (40 mm. size) excluding shuttering. In ground floor (B) with N.B. variety stone metal (b) 1:3:6 proportion. | 3.22 | Cum | 17,765.18 ₹20,962.91 | 16,964.4 ₹20,017.99 Lowest | 18,083.18 ₹21,338.15 |
| 5.00 | Ordinary cement concrete ( mix 1:1.5:3) with graded stone chips with (20 mm normal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes(ii) River Bazree. | 45.49 | Cum | 3,04,605.73 ₹3,59,434.76 | 2,90,867.54 ₹3,43,223.7 Lowest | 3,10,071.89 ₹3,65,884.83 |
| 6.00 | Hire and labour charges for shuttering with centering and necessary staging upto 4.0m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs,beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of work (upto roof of ground floor) (a) 25 mm to 30mm thick wooden shuttering as per decision and direction of the EIC. | 222.68 | Sqm | 82,613.54 ₹97,483.98 | 78,828.01 ₹93,017.05 Lowest | 84,043.13 ₹99,170.89 |
| 7.00 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars,stirrups,binders etc. initial straightening and removal of loose rust ( if necessary),cutting to requisite length hooking and bending to correct shape,placing in proper position and binding with 16 gauge black annealed wire at every inter-section,complete as per drawing and direction.(a) For works in foundation,basement and upto roof of ground floor/upto 4m) (i)Tor steel/Mild steel III. Others manufacturers not specified | 5.36 | MT | 3,73,500.88 ₹4,40,731.04 | 3,56,675.84 ₹4,20,877.49 Lowest | 3,80,227.73 ₹4,48,668.72 |
| 8.00 | 25 mm thick damp proof course with cement concrete with stone chips (1:1.5:3) (with graded stone aggregate 10mm nominal size) and admixture of water proofing compound as per manufacture's specification followed by two coat of polymer based paint ( 1st coat after 4 to 5 days of concrete laying and 2nd coat just before brick masonary work) as directed.(Cost of water proofing compond and polymer based paint to be paid seprately). (Chequering not required over concrete or painted surface). | 6.46 | Sqm | 1,589.78 ₹1,875.94 | 1,512.23 ₹1,784.43 Lowest | 1,613.88 ₹1,904.38 |
| 9.00 | Extra rate for using wate proofing and plastering admixtuere @ 0.2% by weight of cement (or at manufacture's specified rate ) for concrete of various grade. | 1.06 | kg | 139.42 ₹164.52 | 133.08 ₹157.03 Lowest | 142.03 ₹167.6 |
| 10.00 | Brick work with Ist class bricks in cement mortar(1:6) (b) In Super structure. Ground floor. | 7.3 | Cum | 54,020 ₹63,743.6 | 51,581.8 ₹60,866.52 Lowest | 54,987.83 ₹64,885.64 |
Tender Value
₹20.9 L
EMD Value
₹42,000
Closing Date
1 Apr 2024, 12:00 pmClosed
DGM (PNC), TLD-IV PS, Kalijhora,
Teesta Low Dam-IV Power Station, P.O.- Kalijhora Bazar, Distt - Darjeeling, West Bengal-734008
Construction of Community Hall at Yang Gumba Gaon, Kalimpong, West Bengal by TLD-IV PS
2024_NHPC_800167_1
NH/TLD-IV PS/PNC/W-907/2024/806
Open Tender
Civil Works
Works
90 days
TLD-IV PS, Kalijhora, NHPC Ltd
Please refer Tender documents.
8 documents required · 8 mandatory
₹590
NHPC Limited
₹42,000
Yes
20 Aug 2026
12 Mar 2024
8 Apr 2024
12 Mar 2024
1 Apr 2024
12 Mar 2024
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].