Loading…
Loading…
Tender Value
₹70.8 L
EMD Value
₹1.4 L
Closing Date
29 Dec 2025, 12:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TRD
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. Similar work means - ""Execution of 25kV/2x25kV Electrification work OR Execution of 25kV/2x25kV feeder wire work OR Execution of 25kV/2x25kV OHE modification work OR Execution of 25kV/2x25kV OHE upgradation work OR Execution of 25kV/2x25kV OHE maintenance work OR Execution of 25kV/2x25kV OHE AMC work OR Execution of 25kV/2x25kV OHE rehabilitation work OR Execution of 25kV/2x25kV OHE replacement work i.e. catenary wire/contact wire/feeder wire/ ATD/ cantilever assembly OR Execution of 66kV or higher voltage overhead Transmission line work OR Execution of 66kV or higher voltage Sub-Station work.".
The Tenderer/Firm must have valid Electrical Contractor License (ECL) and copy of license must be uploaded in IREPS site during bid. In case Tenderers submitted with ECL issued in the name of other firms/ tenderers will be summarily rejected. In case the ECL is not valid on the date of opening of tender, details of renewal should be submitted.
12 conditions · 6 needing a document upload
I/ We have read the check list and furnish the documents as per check list.
Goods & Services Tax (GST) registration certificate copy should be attached.
In case of Sole Proprietorship Concern firm has to submit Affidavit certifying the sole Proprietorship of the firm. This affidavit shall be notarized. Or In case of a Partnership Firm, Firm has to submit (a) Notary certified copy of the Partnership Deed. (b) A copy of power of Attorney firm has to submit (duly registered as per prevailing Law) in favour of an individual to tender for the work, sign the agreement etc., and create liability against the Firm. Or In case Tenderer is a Company registered under Companies Act-2013. The tenderer shall submit: (a)The copies of MOA (Memorandum of Association)/AOA (Articles of Association) of the company.(b) A copy of Certificate of Incorporation. (c) A copy of authorization/ Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of company and create liability against the company. Or In case Tenderer is LLP (Limited Liability Partnership); If the tender is submitted on behalf of a LLP registered under LLP Act-2008, the Tenderer shall submit along with tender: (a) A copy of LLP Agreement (b) A copy of Certificate of Incorporation (c) A copy of Power of Attorney/Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP. Or In case of a tenderer is registered Society and Registered trust. The tenderer shall submit: (a) A copy of certificate of registration. (b) A copy of Memorandum of Association of Society/Trust Deed (c)A copy of Power of Attorney in favour of the individual to sign the tender documents and create liability against the society/ Trust.
PAN Card copy should be attached..
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
OHE works for construction of RUBs in lieu of LC Gate Nos. 440, RV-20, 417, DD- 59, DD-19, DD-08, 375 and 389, CRR work under P-Way at BXA & BMY, and provision of 10 kVA AT for interlocking of LC-62 and for the additional shunting line at FMY, PP Yard, Raipur Division
TRD-R-2025-E14~SECR
TRD-R-2025-E14
Open
Works - General
24 Months
Raipur, Chhattisgarh
₹0
₹1.4 L
29 Dec 2025
1 Dec 2025
15 Dec 2025
906 items across 12 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 10,03,515.45 | ||
| — | 6.00 | — | — | ||
| Concerete for foundation & Pinth In other than Hard & Rocky soil. | — | — | — | 38,298 | |
| — | 0.42 | — | — | ||
| Supply of Galvanised Traction Mast (Rolled & Fabricated) | — | — | — | 49,354.2 | |
| — | 0.42 | — | — | ||
| Erection of Galvanised Traction Mast (Rolled & Fabricated) | — | — | — | 2,307.06 | |
| — | 0.42 | — | — | ||
| 100% extra for Erection of Galvanised Traction Mast (Rolled & Fabricated) under Power Block | — | — | — | 2,307.06 | |
| — | 0.42 | — | — | ||
| 50% extra for Erection of Galvanised Traction Mast (Rolled & Fabricated) under Night PB | — | — | — | 1,153.53 | |
| — | 0.10 | — | — | ||
| Supply of Fabricated Steel work other than Mast | — | — | — | 11,649.1 | |
| — | 0.10 | — | — | ||
| Erection of Fabricated Steel work other than Mast | — | — | — | 646.8 | |
| — | 0.10 | — | — | ||
| 100% extra for Erection of Fabricated Steel work other than Mast under Power Block | — | — | — | 646.8 | |
| — | 0.10 | — | — | ||
| 50% extra for Erection of Fabricated Steel work other than Mast under Night Power Block | — | — | — | 323.4 | |
| — | 2.00 | — | — | ||
| Supply of Single bracket assembly for Conventional OHE | — | — | — | 37,908 | |
| — | 2.00 | — | — | ||
| Fabrication & Erection of Single bracket assembly for Conventional OHE | — | — | — | 1,852 | |
| — | 2.00 | — | — | ||
| 100% extra for Fabrication & Erection of Single bracket assembly for Conventional OHE under PB | — | — | — | 1,852 | |
| — | 2.00 | — | — | ||
| 50% extra for Fabrication & Erection of Single bracket assembly for Conventional OHE under Night Power Block | — | — | — | 926 | |
| — | 2.00 | — | — | ||
| Supply of Guy Rod assembly Including Mast Anchor/Guy Rod fittings. | — | — | — | 20,302 | |
| — | 2.00 | — | — | ||
| Erection of Guy Rod assembly Including Mast Anchor/Guy Rod fittings. | — | — | — | 1,630 | |
| — | 2.00 | — | — | ||
| 100% extra for Erection of Guy Rod assembly Including Mast Anchor/Guy Rod fittings under Power Block. | — | — | — | 1,630 | |
| — | 2.00 | — | — | ||
| 50% extra for Erection of Guy Rod assembly Including Mast Anchor/Guy Rod fittings under Night PB | — | — | — | 815 | |
| — | 1.00 | — | — | ||
| Supply of Regulating Equipment 3 pulley type with Counter Weight assembly & guide tube for conventional type OHE. | — | — | — | 1,03,922 | |
| — | 1.00 | — | — | ||
| Erection of Regulating Equipment 3 pulley type with Counter Weight assembly & guide tube for conventional type OHE. | — | — | — | 3,122 | |
| — | 1.00 | — | — | ||
| 100% extra for Erection of Regulating Equipment 3 pulley type with Counter Weight assembly & guide tube for conventional type OHE. | — | — | — | 3,122 | |
| — | 1.00 | — | — | ||
| 50% extra for Erection of Regulating Equipment 3 pulley type with Counter Weight assembly & guide tube for conventional type OHE under Night PB | — | — | — | 1,561 | |
| — | 1.00 | — | — | ||
| Supply of Termination of single conductor of OHE (Component ) | — | — | — | 8,814 | |
| — | 1.00 | — | — | ||
| Erection of Termination of single conductor of OHE with Component | — | — | — | 824 | |
| — | 1.00 | — | — | ||
| 100% extra for Erection of Termination of single conductor of OHE with Component under PB | — | — | — | 824 | |
| — | 1.00 | — | — | ||
| 50% extra for Erection of Termination of single conductor of OHE with component under Night PB | — | — | — | 412 | |
| — | 1.00 | — | — | ||
| Supply of Termination of Double conductor of OHE(Component ) | — | — | — | 10,297 | |
| — | 1.00 | — | — | ||
| Erection of Termination of Double conductor of OHE with Component | — | — | — | 950 | |
| — | 1.00 | — | — | ||
| 100% extra for Erection of Termination of Double conductor of OHE with Component under PB working | — | — | — | 950 | |
| — | 1.00 | — | — | ||
| 50% extra for Erection of Termination of Double conductor of OHE with Component under night PB working | — | — | — | 475 | |
| — | 2.00 | — | — | ||
| Supply of Component of Solid core cut-in insulator | — | — | — | 3,520 | |
| — | 2.00 | — | — | ||
| Erection of Component of Solid core cut-in insulator | — | — | — | 2,512 | |
| — | 2.00 | — | — | ||
| 100% extra for Erection of Component of Solid core cut-in insulator under PB | — | — | — | 2,512 | |
| — | 2.00 | — | — | ||
| 50% extra for Erection of Component of Solid core cut-in insulator under night PB | — | — | — | 1,256 | |
| — | 2.00 | — | — | ||
| Supply & erection of Structure Bond | — | — | — | 1,142 | |
| — | 1.00 | — | — | ||
| Supply & Erection of Longitudinal Bond | — | — | — | 451 | |
| — | 1.00 | — | — | ||
| Supply and Erection of Transverse/Special Bond | — | — | — | 1,145 | |
| — | 2.00 | — | — | ||
| Supply of Number Plate Retro Reflective type (Mast/Structure) | — | — | — | 860 | |
| — | 2.00 | — | — | ||
| Erection of Number Plate Retro Reflective type (Mast/Structure) | — | — | — | 212 | |
| — | 2.00 | — | — | ||
| Supply of stay arm porcelain Insulator (CD-1050 mm) | — | — | — | 9,692 | |
| — | 2.00 | — | — | ||
| Supply of bracket porcelain Insulator (CD-1050 mm) | — | — | — | 9,516 | |
| — | 2.00 | — | — | ||
| Supply of 9 T porcelain Insulator (CD-1050 mm) | — | — | — | 13,696 | |
| — | 5.00 | — | — | ||
| Supply of Annealed copper Small jumper wire (50 sqmm 19/1.8 mm) | — | — | — | 2,220 | |
| — | 2.00 | — | — | ||
| Supply of Components of Copper jumper (C Jumper & Anti Theft) | — | — | — | 6,092 | |
| — | 2.00 | — | — | ||
| Erection of Copper jumper (C Jumper & Anti Theft) with Components | — | — | — | 312 | |
| — | 2.00 | — | — | ||
| 100% extra for Erection of Copper jumper (C Jumper & Anti Theft) with Components under PB working | — | — | — | 312 | |
| — | 2.00 | — | — | ||
| 50% extra for Erection of Copper jumper (C Jumper & Anti Theft) with Components under night PB working | — | — | — | 156 | |
| — | 2.00 | — | — | ||
| Transfer of Equipment from one Mast/Support to another. | — | — | — | 6,418 | |
| — | 2.00 | — | — | ||
| 100% extra for Transfer of Equipment from one Mast/Support to another under PB | — | — | — | 6,418 | |
| — | 2.00 | — | — | ||
| 50% extra for Transfer of Equipment from one Mast/Support to another under Night PB | — | — | — | 3,209 | |
| — | 1.00 | — | — | ||
| Provision of an Additional Bracket assembly on a Mast or support | — | — | — | 777 | |
| — | 1.00 | — | — | ||
| 100% extra for Provision of an Additional Bracket assembly on a Mast or support under PB working | — | — | — | 777 | |
| — | 1.00 | — | — | ||
| 50% extra for Provision of an Additional Bracket assembly on a Mast or support under night PB working | — | — | — | 388.5 | |
| — | 25.00 | — | — | ||
| Slewing & Re-slewing of OHE | — | — | — | 1,85,525 | |
| — | 25.00 | — | — | ||
| 100% extra for Slewing & Re-slewing of OHE under PB | — | — | — | 1,85,525 | |
| — | 25.00 | — | — | ||
| 50% extra for Slewing & Re-slewing of OHE under night PB | — | — | — | 92,762.5 | |
| — | 25.00 | — | — | ||
| Adjustment of existing OHE & Tower wagon checking. | — | — | — | 18,050 | |
| — | 25.00 | — | — | ||
| 100% extra for Adjustment of existing OHE & Tower wagon checking under PB | — | — | — | 18,050 | |
| — | 25.00 | — | — | ||
| 50% extra for Adjustment of existing OHE & Tower wagon checking under Bnight PB | — | — | — | 9,025 | |
| — | 4.00 | — | — | ||
| ATD Locking and Unlocking | — | — | — | 4,636 | |
| — | 4.00 | — | — | ||
| 100% extra for ATD Locking and Unlocking under PB | — | — | — | 4,636 | |
| — | 4.00 | — | — | ||
| 50% extra for ATD Locking and Unlocking under Night PB | — | — | — | 2,318 | |
| — | 1.00 | — | — | ||
| Dismantling of Mast/Structure upright | — | — | — | 3,371 | |
| — | 1.00 | — | — | ||
| 100% extra for Dismantling of Mast/Structure upright under PB | — | — | — | 3,371 | |
| — | 1.00 | — | — | ||
| 50% extra for Mast/Structure upright under Night PB | — | — | — | 1,685.5 | |
| — | 2.00 | — | — | ||
| Dismantling of cantilever | — | — | — | 1,660 | |
| — | 2.00 | — | — | ||
| 100% extra for Dismantling of cantilever under PB | — | — | — | 1,660 | |
| — | 2.00 | — | — | ||
| 50% extra for Dismantling of cantilever under night PB | — | — | — | 830 | |
| — | 1.00 | — | — | ||
| Dismantling of Guy rod | — | — | — | 728 | |
| — | 1.00 | — | — | ||
| 100% extra for Dismantling of Guy rod under PB | — | — | — | 728 | |
| — | 1.00 | — | — | ||
| 50% extra for Dismantling of Guy rod under PB | — | — | — | 364 | |
| — | 1.00 | — | — | ||
| Dismantling of Regulating Equipment assembly with counter & guide tube | — | — | — | 3,285 | |
| — | 1.00 | — | — | ||
| 100% extra for Dismantling of Regulating Equipment assembly with counter & guide tube under PB | — | — | — | 3,285 | |
| — | 1.00 | — | — | ||
| 50% extra for Dismantling of Regulating Equipment assembly with counter & guide tube under PB under night PB | — | — | — | 1,642.5 | |
| — | 2.00 | — | — | ||
| Dismantling of foundation etc. | — | — | — | 4,120 | |
| — | 1.00 | — | — | ||
| Supply of Single Earth Electrode | — | — | — | 3,105 | |
| — | 1.00 | — | — | ||
| Erection of Single Earth Electrode | — | — | — | 2,128 | |
| — | 5.00 | — | — | ||
| Drilling of holes on rails. | — | — | — | 360 | |
| — | 5.00 | — | — | ||
| Disconnection /Reconnection of missing/opened/existing traction bond. | — | — | — | 300 | |
| — | 2.00 | — | — | ||
| Supply of Hot Dip Galvanized antimonkey climbing arrangement for masts | — | — | — | 12,062 | |
| — | 2.00 | — | — | ||
| Erection of Hot Dip Galvanized antimonkey climbing arrangement for masts | — | — | — | 862 | |
| — | 1.00 | — | — | ||
| 100% extra for Erection of Hot Dip Galvanized antimonkey climbing arrangement for masts under PB | — | — | — | 431 | |
| — | 1.00 | — | — | ||
| 50% extra for Erection of Hot Dip Galvanized antimonkey climbing arrangement for masts under Night PB | — | — | — | 215.5 | |
| — | 1.00 | — | — | ||
| Warning board caution live wire drg. No. ETI/OHE/P-7540, specification no. ETI/OHE/33(2/73) or latest | — | — | — | 1,146 | |
| — | 1.00 | — | — | ||
| Caution plate 25kV A.C. as per RDSO drg. No ETI/OHE/P-7532, specification ETI/OHE/33(273) or latest | — | — | — | 924 | |
| — | 1.00 | — | — | ||
| — | — | — | 3,044 | ||
| — | 1.00 | — | — | ||
| — | — | — | 2,291 | ||
| — | 2.00 | — | — | ||
| — | — | — | 4,838 | ||
| — | 1.00 | — | — | ||
| — | — | — | 2,607 | ||
| — | 1.00 | — | — | ||
| Rail jumper with clamp at both end 3 mtr | — | — | — | 1,595 | |
| — | 1.00 | — | — | ||
| Rail jumper with clamp at both end 13 mtr | — | — | — | 3,717 | |
| — | 2.00 | — | — | ||
| PVC Sleeve of 3 to 5 mm thickness suitable for bond. | — | — | — | 134 | |
| — | 1.00 | — | — | ||
| Supply of Battery operated chamfering kit capacity up 17 to 32 mm hole powered by 48volt 4AH rechargeable Li-Ion battery with charger and one chamfering tool 17-25 mm and another 25-32mm. | — | — | — | 23,010 | |
| — | 2.00 | — | — | ||
| "40 kv 'Hand gloves rubber', made with suitable insulating rubber, for electrical applications, test potential voltage 40000 V and maximum use 36000 V. length 400 mm, palm size 10 inches as per IS 13774:1993." | — | — | — | 6,844 | |
| — | 1.00 | — | — | ||
| Shock treatment chart laminated | — | — | — | 2,001 | |
| — | 1.00 | — | — | ||
| First Aid box Supply & Installation | — | — | — | 906 | |
| — | — | — | 10,13,039.45 | ||
| — | 6.00 | — | — | ||
| Concerete for foundation & Pinth In other than Hard & Rocky soil. | — | — | — | 38,298 | |
| — | 0.74 | — | — | ||
| Supply of Galvanised Traction Mast (Rolled & Fabricated) | — | — | — | 86,957.4 | |
| — | 0.74 | — | — | ||
| Erection of Galvanised Traction Mast (Rolled & Fabricated) | — | — | — | 4,064.82 | |
| — | 0.74 | — | — | ||
| 100% extra for Erection of Galvanised Traction Mast (Rolled & Fabricated) under Power Block | — | — | — | 4,064.82 | |
| — | 0.74 | — | — | ||
| 50% extra for Erection of Galvanised Traction Mast (Rolled & Fabricated) under Night PB | — | — | — | 2,032.41 | |
| — | 2.00 | — | — | ||
| Supply of Single bracket assembly for Conventional OHE | — | — | — | 37,908 | |
| — | 2.00 | — | — | ||
| Fabrication & Erection of Single bracket assembly for Conventional OHE | — | — | — | 1,852 | |
| — | 2.00 | — | — | ||
| 100% extra for Fabrication & Erection of Single bracket assembly for Conventional OHE under PB | — | — | — | 1,852 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .