Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical 15 CANAL ROAD ROORKEE ROORKEE HARIDWAR UTTARAKHAND 247667 | HARIDWAR | UTTARAKHAND | 247667 | Admitted-Fee/PreQual/Technical |
Tender Value
₹4.5 Cr
EMD Value
₹9.0 L
Closing Date
6 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer/Sports Division-1
The Executive Engineer, Sports Division-1, Siri Fort Sports Complex, New Delhi-110049
Construction of Proposed Guest Rooms (Stilt and First Floor) adjacent to existing Club House Building including Civil, Sanitary, Plumbing, Internal Finishing, Facade, Waterproofing and Allied Works at DDA Golf Course, Sector-24, Dwarka.
2026_DDA_932594_1
40/EE/Sports Divn.-1/DDA/2026-27.
Open Tender
Civil Works
Works
365 days
The Executive Engineer, SD-1, Siri Fort Sports Com
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹9.0 L
7 Nov 2026
31 Oct 2026
7 Nov 2026
31 Oct 2026
6 Nov 2026
31 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 78 | cum | 3,551.25 | ₹2,76,997.5 |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
In cement mortar | 7 | cum | 2,060.2 | ₹14,421.4 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil | 1,726 | cum | 177.5 | ₹3,06,365 |
| 4 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :
All kinds of soil
Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia | 100 | Meter | 352.15 | ₹35,215 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 1,225 | cum | 196 | ₹2,40,100 |
| 6 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 8 | cum | 2,123.75 | ₹16,990 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 112 | Cum | 6,518.6 | ₹7,30,083.2 |
| 8 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing :
1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources). | 7 | Cum | 8,519.2 | ₹59,634.4 |
| 9 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Excess cement as per design mix, if any will not be payable separately.
All works upto plinth level
Concrete of M25 grade with minimum cement content of 330 kg /cum | 389 | Cum | 9,504.75 | ₹36,97,347.75 |
| 10 | All works above plinth level upto floor V level
Concrete of M25 grade with minimum cement content of 330 kg /cum | 395 | Cum | 9,860.4 | ₹38,94,858 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.28 MB
BOQ_980042.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .