Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹26.7 CrAccepted-Finance | ₹26.7 Cr | 1 | Accepted-Finance L1 |
| 2 | 2₹26.7 CrRejected-Finance | ₹26.7 Cr | 2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
18 Sept 2021, 3:30 pmClosed
JT. MUNICIPAL COMISSIONEER
SWM dept, 1st Floor, PMC Main Building, Near Mangala talkies, Shivaji Nagar-411005
Supply Installation Commissioning and operation and maintenance for a period of 10 years of minimum 100 MTPD Mechanized Mechanized Material Recovery facility integrated Transfer Station for Municipal Solid Waste at Bavdhan Sr No64 Part1
2019_PMCP_521831_1
PMC/SWM/2019/32
Open Tender
Solid Waste Management
3650 days
Bhavdhan Kurdh Sr.No.64
EMD , Experience, Financial Turnover, Staffing Pattern, Byproduct production and sale certificate
8 documents required · 8 mandatory
₹11,979
via Payment Gateway
₹5 L
Office of Joint Municipal Commissioner, SWm dept
31 Jan 2022
23 Dec 2019
20 Sept 2021
23 Dec 2019
18 Sept 2021
9 Sept 2021
6 Jan 2020
Amount
Fabrication Shed
a. Machinery b. Input Waste storage c. By product storage (Not less than 2000 sq.metre) 9.m high at centre and to 5.5m high at side. Shed design should approved by structural consultant which is on of structural consultant panel of PMC. Fabrication Shed roof should be provided by good industrial ventilator and whole plant should provided by odor control fogging system.
9" thick BBM wall of 2.0m high and 2.0 m high chain link with angle frame of suitable size ,remaining closed with G.I. sheet .External & Internal plaster, roof with steel truss with G.I sheet as per design given by site engineer in charge/Consultant on PMC panel, Cement painting for wall and oil painting as an where required. Specification will as per DSR specification of PMC.
Retaining Wall as per site Requirement
To construct shed with office room, curing space and storage space toilet for labour, recreational/Change room cum bathroom for working labors etc.
Bidder should provide 50,000 kgs weighing scale(i.e.it will min 50 MT waste.) of Samsung, Seiko or equivalent model.
Column Footing at appropriate distance at compound wall for G.I. Sheet cladding (as shown in fig.
Platform: Concrete ramp at entrance, M40 Concrete OR above PCC for total Structural shed base, and for working platform, drainage system for collection of lechate generated at landing platform and toilet bathroom.
Office room and utilization :Office room size of 3m x 3m ,Change room with Bathroom of size 3m x 2.5m, Toilet for working person requirement or as per directed by site in charge engineer/ Consultant on PMC panel.
Drainage System : As per layot
Any other work Complying Scope of Work
Bidder Name
Amount
shivprasad shamrao bandal(GSTN-27ANJPB4576G1ZX)
ADECO SOLUTIONS ADSL LLP(GSTN-NA)
Description of Work / Item(s)
Description
ANNEXURE 1 CIVIL WORK:
ANNEXURE 2 MECHANICAL WORK & ELECTRICAL WORK:
ANNEXURE 3 Operation and maintenance
shivprasad shamrao bandal
shivprasad shamrao bandal
shivprasad shamrao bandal
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid