Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹13.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹13.2 L+₹10,866.21 (0.83%)Admitted-Fee/PreQual/Technical/Finance | ₹13.2 L+₹10,866.21 (0.83%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹13.2 L+₹11,061.02 (0.84%)Admitted-Fee/PreQual/Technical/Finance | ₹13.2 L+₹11,061.02 (0.84%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹13.2 L+₹11,488.82 (0.88%)Admitted-Fee/PreQual/Technical/Finance | ₹13.2 L+₹11,488.82 (0.88%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L4₹13.2 L+₹11,488.82 (0.88%)Admitted-Fee/PreQual/Technical/Finance | ₹13.2 L+₹11,488.82 (0.88%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | BHARATA LAXMI BISWAL L4 | ASHIRBAD BISWAL L4 | RAMAKANTA BISWAL L5 | Tapan Mahapatra L1 | MAMATAMAYEE DAS L6 | HRUSIKESH ROUT L9 | PRATAP KUMAR PRADHAN L3 | AMBIKA PRASAD BEHERA L10 | PRIYA RANJAN ROUTRAY L6 | RANJAN KUMAR NAYAK L8 | DIPTI RANJAN SAHOO L7 | BISWANATH KHATUA L6 | NISHITA SWAIN L5 | LOTUS INFRA L5 | CHINMAYEE SATAPATHY L6 | ABANTI DAS ADHIKARI L6 | M/S SAI CONSTRUCTIONS L6 | RAKESH KUMAR BISWAL L2 | NIRANJAN PRUSTY L5 | JHARANA DAS L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Site clearance for cutting bushes cleaning the sites etc complete. | 2,475 | Sqm. | 2.75 ₹6,806.25 | 2.75 ₹6,806.25 | 2.38 ₹5,890.5 Lowest | 2.38 ₹5,890.5 Lowest | 2.38 ₹5,890.5 Lowest | 2.38 ₹5,890.5 Lowest | 2.38 ₹5,890.5 Lowest | 2.4 ₹5,940 | 2.38 ₹5,890.5 Lowest | 2.38 ₹5,890.5 Lowest | 2.38 ₹5,890.5 Lowest | 2.38 ₹5,890.5 Lowest | 2.38 ₹5,890.5 Lowest | 2.38 ₹5,890.5 Lowest | 2.38 ₹5,890.5 Lowest | 2.38 ₹5,890.5 Lowest | 2.38 ₹5,890.5 Lowest | 2.38 ₹5,890.5 Lowest | 2.38 ₹5,890.5 Lowest | 2.38 ₹5,890.5 Lowest |
| 2.00 | Drilling of Tubewell 240mm dia to accommodate 125 mm. dia PVC Casing Pipe & gravel of 6 mm to 10 mm size | 330 | Mtr. | 800 ₹2,64,000 | 800 ₹2,64,000 | 705.33 ₹2,32,758.9 Lowest | 705.5 ₹2,32,815 | 705.5 ₹2,32,815 | 705.58 ₹2,32,841.4 | 705.5 ₹2,32,815 | 706 ₹2,32,980 | 705.5 ₹2,32,815 | 705.5 ₹2,32,815 | 705.5 ₹2,32,815 | 705.5 ₹2,32,815 | 705.33 ₹2,32,758.9 Lowest | 705.33 ₹2,32,758.9 Lowest | 705.5 ₹2,32,815 | 705.5 ₹2,32,815 | 705.5 ₹2,32,815 | 705.5 ₹2,32,815 | 705.33 ₹2,32,758.9 Lowest | 705.5 ₹2,32,815 |
| 3.00 | Supplying & lowering of 125 mm dia PVC casing pipe without slots in perfectly vertical position including cost of pipe etc complete | 286 | Mtr. | 895 ₹2,55,970 | 895 ₹2,55,970 | 903.51 ₹2,58,403.86 | 903.72 ₹2,58,463.92 | 903.72 ₹2,58,463.92 | 903.83 ₹2,58,495.38 | 885 ₹2,53,110 Lowest | 904 ₹2,58,544 | 903.72 ₹2,58,463.92 | 913.5 ₹2,61,261 | 903.72 ₹2,58,463.92 | 903.72 ₹2,58,463.92 | 903.51 ₹2,58,403.86 | 903.51 ₹2,58,403.86 | 903.72 ₹2,58,463.92 | 903.72 ₹2,58,463.92 | 903.72 ₹2,58,463.92 | 903.72 ₹2,58,463.92 | 903.51 ₹2,58,403.86 | 903.72 ₹2,58,463.92 |
| 4.00 | Supplying & lowering of 125 mm dia PVC casing pipe with slots in perfectly vertical position including cost of pipe etc complete | 55 | Mtr. | 936.7 ₹51,518.5 | 936.7 ₹51,518.5 | 913.28 ₹50,230.4 | 913.5 ₹50,242.5 | 913.5 ₹50,242.5 | 913.6 ₹50,248 | 913.5 ₹50,242.5 | 913 ₹50,215 Lowest | 913.5 ₹50,242.5 | 913.5 ₹50,242.5 | 913.5 ₹50,242.5 | 913.5 ₹50,242.5 | 913.28 ₹50,230.4 | 913.28 ₹50,230.4 | 913.5 ₹50,242.5 | 913.5 ₹50,242.5 | 913.5 ₹50,242.5 | 913.49 ₹50,241.95 | 913.28 ₹50,230.4 | 913.5 ₹50,242.5 |
| 5.00 | Supplying & fitting of 150 mm. dia ( IS 1239) GI Pipe | 3.3 | Mtr. | 1,400 ₹4,620 Lowest | 1,400 ₹4,620 Lowest | 1,422.31 ₹4,693.62 | 1,422.64 ₹4,694.71 | 1,422.65 ₹4,694.75 | 1,422.81 ₹4,695.27 | 1,422.64 ₹4,694.71 | 1,420 ₹4,686 | 1,422.65 ₹4,694.75 | 1,422.65 ₹4,694.75 | 1,422.65 ₹4,694.75 | 1,422.65 ₹4,694.75 | 1,422.31 ₹4,693.62 | 1,422.31 ₹4,693.62 | 1,422.65 ₹4,694.75 | 1,422.65 ₹4,694.75 | 1,422.65 ₹4,694.75 | 1,422.05 ₹4,692.77 | 1,422.31 ₹4,693.62 | 1,422.65 ₹4,694.75 |
| 6.00 | Earth work in excavation of foundation trenches in hard soil within initial lift of 1.50 mtr. and depositing the excavated materials away from worksite within 50 mtr.initial lead including dressing and levelling the bed etc. as per the direction of Engineer-in-Charge. | 48.62 | Cum | 150 ₹7,293 Lowest | 150 ₹7,293 Lowest | 235.3 ₹11,440.29 | 235.36 ₹11,443.2 | 235.35 ₹11,442.72 | 235.38 ₹11,444.18 | 235.35 ₹11,442.72 | 238 ₹11,571.56 | 235.35 ₹11,442.72 | 235.36 ₹11,443.2 | 235.36 ₹11,443.2 | 235.35 ₹11,442.72 | 235.3 ₹11,440.29 | 235.3 ₹11,440.29 | 235.35 ₹11,442.72 | 235.35 ₹11,442.72 | 235.35 ₹11,442.72 | 235.35 ₹11,442.72 | 235.3 ₹11,440.29 | 235.35 ₹11,442.72 |
| 7.00 | Earth work in excavation of foundation trenches in hard soil within initial lift of 1.50 mtr. and depositing the excavated materials away from worksite within 50 mtr.initial lead including dressing and levelling the bed etc. as per the direction of Engineer-in-Charge. | 38.28 | Cum | 420 ₹16,077.6 | 420 ₹16,077.6 | 381 ₹14,584.68 Lowest | 381.09 ₹14,588.13 | 381.1 ₹14,588.51 | 381.13 ₹14,589.66 | 381.08 ₹14,587.74 | 385.57 ₹14,759.62 | 381.1 ₹14,588.51 | 381.09 ₹14,588.13 | 381.09 ₹14,588.13 | 381.1 ₹14,588.51 | 381 ₹14,584.68 Lowest | 381 ₹14,584.68 Lowest | 381.1 ₹14,588.51 | 381.1 ₹14,588.51 | 381.1 ₹14,588.51 | 381.08 ₹14,587.74 | 381 ₹14,584.68 Lowest | 381.1 ₹14,588.51 |
| 8.00 | b) 3rd depth - | 1.32 | Cum | 580 ₹765.6 | 580 ₹765.6 | 517.34 ₹682.89 | 517.46 ₹683.05 | 517.46 ₹683.05 | 517.52 ₹683.13 | 517.46 ₹683.05 | 523.55 ₹691.09 | 517.46 ₹683.05 | 517.47 ₹683.06 | 517.46 ₹683.05 | 517.46 ₹683.05 | 517.34 ₹682.89 | 517.34 ₹682.89 | 517.46 ₹683.05 | 517.46 ₹683.05 | 517.46 ₹683.05 | 516 ₹681.12 Lowest | 517.34 ₹682.89 | 517.46 ₹683.05 |
| 9.00 | Filling the F & P with sand well watered and rammed etc complete | 1.98 | Cum | 680 ₹1,346.4 | 680 ₹1,346.4 | 679.13 ₹1,344.68 Lowest | 679.29 ₹1,344.99 | 679.29 ₹1,344.99 | 679.37 ₹1,345.15 | 679.29 ₹1,344.99 | 687.3 ₹1,360.85 | 679.29 ₹1,344.99 | 679.3 ₹1,345.01 | 679.29 ₹1,344.99 | 679.29 ₹1,344.99 | 679.13 ₹1,344.68 Lowest | 679.13 ₹1,344.68 Lowest | 679.29 ₹1,344.99 | 679.29 ₹1,344.99 | 679.29 ₹1,344.99 | 679.29 ₹1,344.99 | 679.13 ₹1,344.68 Lowest | 679.29 ₹1,344.99 |
| 10.00 | C.C. (1:3:6) with 40 mm. size crusher broken granite chips in platform including cost, carriage, royalty of all materials and all labour charges etc complete | 2.09 | Cum | 5,000 ₹10,450 Lowest | 5,000 ₹10,450 Lowest | 5,263.09 ₹10,999.86 | 5,264.34 ₹11,002.47 | 5,264.33 ₹11,002.45 | 5,264.95 ₹11,003.75 | 5,264.33 ₹11,002.45 | 5,326.3 ₹11,131.97 | 5,264.33 ₹11,002.45 | 5,264.34 ₹11,002.47 | 5,264.33 ₹11,002.45 | 5,264.33 ₹11,002.45 | 5,263.09 ₹10,999.86 | 5,263.09 ₹10,999.86 | 5,264.33 ₹11,002.45 | 5,264.33 ₹11,002.45 | 5,264.33 ₹11,002.45 | 5,264.33 ₹11,002.45 | 5,263.09 ₹10,999.86 | 5,264.33 ₹11,002.45 |
Tender Value
Refer Docs
EMD Value
₹16,000
Closing Date
14 Aug 2026, 5:00 pmClosed
DEPUTY DIRECTOR GEOLOGY
DEPUTY DIRECTOR GEOLOGY,GWD DIVISION,BARIPADA,TAKATPUR,PIN-757003,DIST-MAYURBHANJ
Construction of 11(Eleven) nos of Recharge Shafts in Bahanaga Block of Baleshwar District under ARUA Scheme for the FY 2026-27
2026_GWSI_138009_1
09/GWDBPD/ARUA/2026-27
Open Tender
Civil Works - Others
Item Rate
BAHANAGA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,000
Yes
17 Aug 2026
5 Aug 2026
17 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance for cutting bushes cleaning the sites etc complete. | 2,475 | Sqm. | 2.8 | ₹6,930 |
| 2 | Drilling of Tubewell 240mm dia to accommodate 125 mm. dia PVC Casing Pipe & gravel of 6 mm to 10 mm size | 330 | Mtr. | 830 | ₹2,73,900 |
| 3 | Supplying & lowering of 125 mm dia PVC casing pipe without slots in perfectly vertical position including cost of pipe etc complete | 286 | Mtr. | 1,063.2 | ₹3,04,075.2 |
| 4 | Supplying & lowering of 125 mm dia PVC casing pipe with slots in perfectly vertical position including cost of pipe etc complete | 55 | Mtr. | 1,074.7 | ₹59,108.5 |
| 5 | Supplying & fitting of 150 mm. dia ( IS 1239) GI Pipe | 3.3 | Mtr. | 1,673.7 | ₹5,523.21 |
| 6 | Earth work in excavation of foundation trenches in hard soil within initial lift of 1.50 mtr. and depositing the excavated materials away from worksite within 50 mtr.initial lead including dressing and levelling the bed etc. as per the direction of Engineer-in-Charge. | 48.62 | Cum | 276.89 | ₹13,462.39 |
| 7 | Earth work in excavation of foundation trenches in hard soil within initial lift of 1.50 mtr. and depositing the excavated materials away from worksite within 50 mtr.initial lead including dressing and levelling the bed etc. as per the direction of Engineer-in-Charge. | 38.28 | Cum | 448.34 | ₹17,162.46 |
| 8 | b) 3rd depth - | 1.32 | Cum | 608.78 | ₹803.59 |
| 9 | Filling the F & P with sand well watered and rammed etc complete | 1.98 | Cum | 799.17 | ₹1,582.36 |
| 10 | C.C. (1:3:6) with 40 mm. size crusher broken granite chips in platform including cost, carriage, royalty of all materials and all labour charges etc complete | 2.09 | Cum | 6,193.33 | ₹12,944.06 |
stage.html
html • 0.05 MB
finance_604796.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
PKG09ARUA.pdf
Tender Documents • 2.65 MB
BOQ_604796.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .