Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.7 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹56.9 L+₹19,907.19 (0.35%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
₹57.1 L
EMD Value
₹38,600
Closing Date
27 Nov 2024, 3:00 pmClosed
Inspector
Arulmigu Vaithiyanathaswamy Temple, Vangudi, Udaiyarpalayam Taluk, Ariyalur District - 612903.
Repairs and Renovation of All Sannathies, Re-Construction of mathil suvar and Providing Outer praharam cutstone flooring in Arulmigu Vaithiyanathaswamy Temple, Vangudi, Udaiyarpalayam Taluk, Ariyalur District.
2024_HRCE_492571_1
660081/2024/Q4
Open Tender
Civil Works
Item Rate
450 days
Vangudi
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹38,600
25 Jan 2025
11 Nov 2024
27 Nov 2024
11 Nov 2024
27 Nov 2024
11 Nov 2024
Amount
Providing scaffolding charges for Vimanam/Gopuram with steel posts non- flammable shade wherever necessary for main formwork and providing ladder arrangements, centering steel sheet for working inspection etc., complete as per standard specification. Hire charges for errection and maintenance and removing the same on completion of work upto various height
Ornamental Brick work in LM 1:2 mix using II Class ground Moulded Chamber Burnt Bricks of size 9" x 43/8" x 23/4"all vari vargams, moulds, sthambas,mukapatram,koodu,nasi,and all ornamental brick workcomplete panchavarnam agaraies, karnakoodus etc forming core walls rajagopuram/vimanams complete in cluding cement al labour chagers
Providing vargapoochu over the core walls of vimanams/Gopurams,with lime mortar 1:1.5 complete including Shaping the mukhapathram, mahanasi, koodu all ornamental works to proper shape by embedding broken bricks of shaped/chiseled bricks , rough plastering with lime mortar 1:1.5 and finshing with final ornamental plastering nayam theervani including cost and conveyance of all materials, labour there fore lifting of materials, all working in heights curing with water etc complete including all extra for folding and including clearing from the vimanams/gopurams 100 sft superficial area for kalkaram.
Kalkaram
Vimanam height 15'
Providing water washing to existing cutstone masonry work for the removal of lime wash on stone and other deposits like soot and enamel paints.
Pointing the stone joints with lime mortar 1:1.5 (one lime, and one & half of sand) ) including cost and conveyance of all materials and all labour charges etc complete
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
For narrow excavation
For open excavation
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate,etc. complete complying with standard specification
Foundation and Basement
For super structure G.F
Supplying and fabricating and placing in position mild steel/ Ribbed tor steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (contractor has to make his own arrangements for the supply of steel and binding wire)
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Brick work in lime mortar 1:2 (one of lime, two of sand ) using country bricks of size 83/4" x 41/4" x 23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc complete complying with standard specifiction.
Foundation and Basement
For super structure G.F
Plastering with lime mortar 1:1.5 (one of lime, one and half of sand ), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Paving with cut stone flooring using cut stone of size 600x600mm and 100mm thick and all the sides are machine cutting, top surface is neatly dressed and pointing with lime mortar 1:1.5 including all materials and labour charges
Supplying and fixing ornamental teak wood temple pattern door of following size with four leaves as per the drawing approved by the departmental officer. The outer frames are four horizontal and two vertical santling. Shutter frame are two scantling.The panel shall have 20mm thick best and approved quality teak wood plank. the shutter shall be equal planks. the rate including cost of the best quality teak wood, Brarees Hinges, Tower bolts, Air drops ornamental Handles. The door frame and Shutter gives two coat best quality synthetic enamel paint.
Painting with multicolour (panchavarnam) good emulsion paints complete for the vimanams/gopurams, including cost and conveyance of all materials , labours charges including artist painter, working in heights, lifting of materials,cost of brushes etc, complete which including all extra for foldings 100 sft
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Weathering Course in brick jelly lime concrete using broken brick jelly of size 20 mm uniform gauge in pure slaked lime (no sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the cutstone slab in a single layer of required slope and finishing by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water etc, complete as per standard specifications.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Lime mortar 1:1.5 (One Lime, One and Half of Five Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Providing new sudhai vigrahams in the vimanams and rajagopurams with galvanized iron rod Reinforecement of suitable dia with binding wires wherever necessary, shapping the core with broken bricks set in cement mortar 1:3 finishing the same with cement mortar 1:3 bringing to the correct shape (lakshana) in conformist with silpa sastra inclusive of specials ornaments, weapons,peedam etc., complete and providing cement mortar nayam theervai wherever necessary inclusive of cost and conveyance of all materials, such as cement broken bricks, and GI rods binding wire all labour for working in heights curing lifting of materials etc.,complete including cement painting 2 coats over a primary coat(one vigraham is accountable with one head, 4 hands with weapons, ornamental costumees etc., as per prathima lakshans, vigraham height is measurable from the crown top to the bottom of foot only if peedam of foot only if peetam is provided the rate with peedam may be adopted as detailed hereunder)
Sub total
A.KANNAN-WORKS CONTRACT (BID ID -1195088)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_585226.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .