Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC MAIRAKATA P O GARBETA DIST PASCHIM MEDINIPUR 721127 | GARBETA | PASCHIM MEDINIPUR | WEST BENGAL | 721127 | L1 | Accepted-AOC 1st lowest | |
| 2 | L2₹6.0 L+₹18,617 (3.22%)Rejected-Finance | L2 | Rejected-Finance 2nd lowest | |
| 3 | L3₹6.1 L+₹32,420 (5.60%)Rejected-Finance GR 8 ADDA BUILDING 1ST FLOOR CITY CENTRE DURGAPUR 16 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | L3 | Rejected-Finance 3rd lowest |
| Sl No | Description | Qty | Unit | GENUINE ENGINEERING WORKS L2 | DURGAPUR POWER L3 | R.K.ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling & disconnection of HT & LT cables / copper bars for repairing of defective 250 KVA transformers from its original position (For Transformer-1) | 1 | Item | 5,960 ₹5,960 | 5,860 ₹5,860 Lowest | 5,860 ₹5,860 Lowest |
| 2.00 | Washing the transformer core and copper windings carefully and cleaning the cores by soft brush and soft cotton clothes and the cores & winding should be cleaned properly to spray hot oil into the transformer under vacuum in the insulation to “flash off” and dry the transformer with the help of mechanical vacuum pump for de-moisturize and raise the IR value as per direction of EIC (For Transformer-1 & 2) | 2 | Item | 14,795 ₹29,590 | 14,695 ₹29,390 | 13,995 ₹27,990 Lowest |
| 3.00 | Rewinding of 250 KVA Dry type Transformer with the LT/HT coils 10 nos of with copper wire and required appx 65.30 kg of copper wire with maintain the number of turns of winding on the core, uses the nomex insulating materials and re assembling the HT/LT coils and dry method uses in the form of vacuum impregnation with a solvent type varnish on a completed assembly consisting of the core and the coils or individual primary and secondary coils and dipping the core and the coils in varnish and placing the coils in position with proper gauge nomex plate, papers, flims, seperators incl. other insulating materials etc etc to complete the same and to make in original formation and both the HT and LT coils in heat chamber for several hours to get satisfactory result of IR value as requirement and to provide the proper support to the windings and both the windings are mounted on the core and maintain flux linkage between primary & secondary windings to complete the job as per direction of EIC (For Transformer-1) | 1 | Item | 3,07,322 ₹3,07,322 | 3,25,212 ₹3,25,212 | 3,03,112 ₹3,03,112 Lowest |
| 4.00 | Charges of various test of 250 KVA Dry type Transformer winding resistance, voltage ratio etc as per requirement at the works as per direction of EIC (For Transformer-1) | 1 | Item | 9,054 ₹9,054 | 8,967 ₹8,967 Lowest | 8,967 ₹8,967 Lowest |
| 5.00 | Installation of the 250 KVA Dry type Transformer after repairing as per direction of EIC (For Transformer-1) | 1 | Item | 5,612 ₹5,612 | 5,512 ₹5,512 Lowest | 5,512 ₹5,512 Lowest |
| 6.00 | Reconnection of the HT & LT cables / copper bars etc to its original position with the expert technician with the co’s own tools & tackles at site to complete the job as per direction of EIC (For Transformer-1) | 1 | Item | 4,155 ₹4,155 | 4,135 ₹4,135 Lowest | 4,135 ₹4,135 Lowest |
| 7.00 | Transportation charge for carrying Shawl-ballah, chain-pulley, wooden-block, testing machine, HT meter, tools & tackles etc. from Company workshop to site and return back from site to Company workshop incl. loading unloading on both side as per requirement (For Transformer-1) | 1 | Item | 25,755 ₹25,755 | 24,748 ₹24,748 Lowest | 24,748 ₹24,748 Lowest |
| 8.00 | Cleaning. Servicing and testing of folowing 11KV 800 Amp rated 3 Panel HT switch gear with the expert technician with the co's own tools & tackles and testing with High Voltage Testing Machine at site to complete the total Cleaning. Servicing, testing work as per direction of EIC
a) Servicing, cleaning, checking, testing of 11 KV HT switch gear, CT/PT.Relays Measurement & protection system.
b) AC & DC Control circuit to be checked thoroughly.
c) Cleaning. Servicing, & testing of 11KV HT switch gear
d) Servicing & testing of Current Transformer.
e) Servicing & testing of Potential Transformer
1) Servicing. Testing of Over current. Earth fault. & IDMT Relays & all auxiliary relays
g) Insulation Resistance (IR) of cables/Breaker
h) Tighten of all bus bar/support.
i) All live terminal are properly tighten & covered.
j) Checking of Induction Circuit
k) Cleanness & dryness of the panel
l) Breaker tripping system checked.
m) Breaker's contact resistance test n) Over current/tripping test.
o) Earth fault/tripping test
p) Testing of breaker tripping by mechanically ON/OFF of breaker switch etc
q) Thoroughly checking before feeding power to Panel
(1 Incoming & 2 Outgoing) | 1 | Job | 79,100 ₹79,100 | 78,925 ₹78,925 | 76,725 ₹76,725 Lowest |
| 9.00 | Supply and installation of transformer protection relay (model – TR7570) MAKE PECON ELECTRONICS/APPROVE MAKE, including ness connection with HT breaker and other work as per direction of EIC | 2 | Nos | 34,045 ₹68,090 | 33,946 ₹67,892 Lowest | 33,946 ₹67,892 Lowest |
| 10.00 | Supply & fixing of Air Circular 600MM 1420 RPM, 4 blade (Make- Crompton/EPC) in wall (Transformer room) with 2.5sqmm wire and PVC rigid conduit approx 3 mtr as per direction of EIC | 2 | Nos | 15,325 ₹30,650 | 14,325 ₹28,650 | 12,825 ₹25,650 Lowest |
Tender Value
Refer Docs
EMD Value
₹14,465
Closing Date
25 Dec 2025, 5:50 pmClosed
Executive Engineer, PWDte
Bankura
Restoration of emergency HT breakdown work at Bishnupur Sub-divisional Hospital under Bishnupur Electrical Sub-Division, PWD
2025_WBPWD_960929_1
WBPWDTE/EE/BED/NIQ_39/Q of 2025-26
Open Tender
ELECTRICAL WORKS ORG
Item Wise
30 days
Bishnupur Sub-divisional Hospital
Please refer Tender documents.
3 documents required · 3 mandatory
₹14,465
8 Oct 2026
27 Nov 2025
27 Dec 2025
27 Nov 2025
25 Dec 2025
27 Nov 2025
Amount
Dismantling & disconnection of HT & LT cables / copper bars for repairing of defective 250 KVA transformers from its original position (For Transformer-1)
Washing the transformer core and copper windings carefully and cleaning the cores by soft brush and soft cotton clothes and the cores & winding should be cleaned properly to spray hot oil into the transformer under vacuum in the insulation to “flash off” and dry the transformer with the help of mechanical vacuum pump for de-moisturize and raise the IR value as per direction of EIC (For Transformer-1 & 2)
Rewinding of 250 KVA Dry type Transformer with the LT/HT coils 10 nos of with copper wire and required appx 65.30 kg of copper wire with maintain the number of turns of winding on the core, uses the nomex insulating materials and re assembling the HT/LT coils and dry method uses in the form of vacuum impregnation with a solvent type varnish on a completed assembly consisting of the core and the coils or individual primary and secondary coils and dipping the core and the coils in varnish and placing the coils in position with proper gauge nomex plate, papers, flims, seperators incl. other insulating materials etc etc to complete the same and to make in original formation and both the HT and LT coils in heat chamber for several hours to get satisfactory result of IR value as requirement and to provide the proper support to the windings and both the windings are mounted on the core and maintain flux linkage between primary & secondary windings to complete the job as per direction of EIC (For Transformer-1)
Charges of various test of 250 KVA Dry type Transformer winding resistance, voltage ratio etc as per requirement at the works as per direction of EIC (For Transformer-1)
Installation of the 250 KVA Dry type Transformer after repairing as per direction of EIC (For Transformer-1)
Reconnection of the HT & LT cables / copper bars etc to its original position with the expert technician with the co’s own tools & tackles at site to complete the job as per direction of EIC (For Transformer-1)
Transportation charge for carrying Shawl-ballah, chain-pulley, wooden-block, testing machine, HT meter, tools & tackles etc. from Company workshop to site and return back from site to Company workshop incl. loading unloading on both side as per requirement (For Transformer-1)
Cleaning. Servicing and testing of folowing 11KV 800 Amp rated 3 Panel HT switch gear with the expert technician with the co's own tools & tackles and testing with High Voltage Testing Machine at site to complete the total Cleaning. Servicing, testing work as per direction of EIC a) Servicing, cleaning, checking, testing of 11 KV HT switch gear, CT/PT.Relays Measurement & protection system. b) AC & DC Control circuit to be checked thoroughly. c) Cleaning. Servicing, & testing of 11KV HT switch gear d) Servicing & testing of Current Transformer. e) Servicing & testing of Potential Transformer 1) Servicing. Testing of Over current. Earth fault. & IDMT Relays & all auxiliary relays g) Insulation Resistance (IR) of cables/Breaker h) Tighten of all bus bar/support. i) All live terminal are properly tighten & covered. j) Checking of Induction Circuit k) Cleanness & dryness of the panel l) Breaker tripping system checked. m) Breaker's contact resistance test n) Over current/tripping test. o) Earth fault/tripping test p) Testing of breaker tripping by mechanically ON/OFF of breaker switch etc q) Thoroughly checking before feeding power to Panel (1 Incoming & 2 Outgoing)
Supply and installation of transformer protection relay (model – TR7570) MAKE PECON ELECTRONICS/APPROVE MAKE, including ness connection with HT breaker and other work as per direction of EIC
Supply & fixing of Air Circular 600MM 1420 RPM, 4 blade (Make- Crompton/EPC) in wall (Transformer room) with 2.5sqmm wire and PVC rigid conduit approx 3 mtr as per direction of EIC
Supplying and fixing Timer box 10way SPNDB fixed in wall on flate iron frame as per direction EIC. The Box shuld comprising following accessorise. A) 230 V, 50 Hz, 16 Amp Single dial 1 x 24 Hrs. Timer similar to (Microrex QT31) of quartz driven running reserve Day dial back up by nickle cadmium battery (Make GEC/Legrand)- 1 по B) One no. MNX25 2P (Make Legrand/L&T)-1 no C) Double pole 32 Amps MCB (L&T/Legrand) - 1 no D) Auto/Manual By pass Toggle Switch arrangement 1 no. E) 250 V, Diode type neon Indicator lamp (Make Legrand /L&T)- 1 no F) Bakelite base with FP bolt type stud/Terminal block incl S & F Neutral Bar, with spring washer, nuts etc with this box for termination of power to complete arrangement must be wiring by 4 Sq mm PVC insulated Cu wire with suitable length incl socketing/lugs etc as per requirement & direction of EIC (for controlling outdoor street light fittings) (Make Legrand /L & T/Crabtree)
GENUINE ENGINEERING WORKS (BID ID -7571817)
DURGAPUR POWER (BID ID -7550391)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .