| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-Finance | ₹1.9 Cr | L1 | Accepted-Finance Lowest Bid Amount |
| 2 | L2₹2.1 Cr+₹24.3 L (12.8%)Rejected-Finance 44 1 3 VILL RITHANI DELHI ROAD WEST RITHANI MEERUT UTTAR PRADESH 250103 | MEERUT | UTTAR PRADESH | 250103 | ₹2.1 Cr+₹24.3 L (12.8%) | L2 | Rejected-Finance Not L1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technical Bid is not found ok |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
30 Jun 2025, 1:00 pmClosed
SE, EDC-II, Mathura
Near Kali Mata Mandir, Cant, Mathura
Shifting of 11 KV overhead/LT Overhead, DT Pole installation and other works etc. due to road expansion from Brahamand Ghat to Raskhan Samadhi in the area of EDD-Laxminagar, Mathura under Deposit Scheme on semi turnkey basis
2025_DVVNL_1043442_3
12/EDC-II(M)/2025-26
Open Tender
Electrical Works
Turn-key
120 days
Mathura
Please see tender documents
2 documents required · 2 mandatory
₹5,900
DVVNL, Agra
₹2 L
15 Jul 2025
24 Jun 2025
30 Jun 2025
24 Jun 2025
30 Jun 2025
24 Jun 2025
Amount
Supply of following material as per RESPO Drawings/standard technical specifications.
HT Tee Connection with X-Mains/Sub station with (Tee Channel)
Cross Arms Holding Clamps with Nut& Bolt
Joint Kit 3*185 sq mm XLPE 11 kv
F-bracket for fixing top insulator Nut&Bolts
Guarding Angle
Stay Set Complete
Pole Earthing Complete
G.I. Wire No. 6 SWG for Guarding
Stone Pad
M.S. Top Channel (100x50x2240 mm)
CROSS BRACING ANGLE SET
CLAMP FOR X- BRACING
barbed wire
Danger Board
P G CLAMP
Number plate with clamp N/B
GI Wire chain Link Net for Fencing mesh D Fence Wire with Foldable
Double through double pole 11 kv TPMO
11 kv TPMO
Copper L Piece 50x50x6 MM
Pipe Earthing Pannel Neutral & TF Neutrul & Body
Chemical Earthing Pannel body & Fencing
11 Kv D.O. Fuse Set
3 phase 11 Kv D.O. Fuse Set heavy duty
LT Protection pannel with 3 Nos of ckt. By stud type tell less fuse unit . Compatable for installation of MCCB 1000
LT PVC Cable 1x400 sq mm Single core
All Lugs 400 sq mm
Dropper Channel
Tail less unit Complete with Structure
LT PVC Cable 1x240 sq mm
Alluminium Lug 240 Sq mm
LT XLPE CABLE 3.5X400 SQ MM
ABC (3x120+1x16) sq mm
ABC (3x95+1x70+1x16) sq mm
ABC (3x50+1x35+1x16) sq mm
XLPE 120*1 SQ MM SINGAL Core
LT Distrution Box For ABC Cable (3-Phase)
D B Clamp
Dead End Clamp with Eye Bolt For PCC
I Hook for ABC
Piercing connector of size 120/95/50 sq mm
LTD Cable 1.35 Sq mm for conneting Distribution Box
LT Shahckle Insulator
Suspention Clamp
Nut & Bolt and washer
Interlocking of base in transformer area
Clamp angle for panel mounting support
ACSR Weasal Conductor Insulated
Erection,installation and commissioning of 11 KV 3ø overhead lines by completeing following works/jobs as per RESPO Drawings/Estimate with centralized and decentralized materials.Work Includes all cartage, carriage, T&P, raw materials and any other material/work which is required for completion of said work but not mentioned in this boq/Estimate.
Erection of ST Pole 11 Mtr long with all accessories.
Laying of 11 KV XLPE CABLE 3X185 SQ MM on overhead line with making loop, connections etc.
Fixing of Joint Kit 3*185 sq mm XLPE 11 kv
Laying of Dog Conductor on ST Poles
Stay Set Complete
Pole earthing by earthing rod
Guarding of 11 KV line (having span 30 to 50 Mtr.)
CONCRETING OF ST POLES
Centralized/decentralized materials mentioned below :-
HT Tee Connection with X-Mains/Sub station with (Tee Channel)
STP Pole 11 Mtr. Stud type
11 KV "V" tyoe cross arm 65x65x6 mm, M S Angle
Cross Arms Holding Clamps with Nut& Bolt
11 KV XLPE CABLE 3X185 SQ MM XLPE 11 kv 8400*2+5% Loop
Joint Kit 3*185 sq mm XLPE 11 kv
11 kv pin insulator WITH GI PIN
11 kv Disc Insulator with fitting
F-bracket for fixing top insulator Nut&Bolts
Guarding Angle
Dog conductor 3000*3+3 % sag
Stay Set Complete
Pole Earthing Complete
G.I. Wire No. 6 SWG for Guarding
Erection,installation and commissioning of Double pole structure for overhead line by completeing following works/jobs as per RESPO Drawings/Estimate with centralized and decentralized materials.Work Includes all cartage, carriage, T&P, raw materials and any other material/work which is required for completion of said work but not mentioned in this boq/Estimate.
Erection of Double pole structure of STP with all accessories.
CONCREATING OF SUPPORT WITH ALL RAW MATERIAL, LABOUR ETC.
EARTHING COMPLETE by MS Earth rod
COMPLETE STAY
CONCREATING OF STAY WITH ALL RAW MATERIAL, LABOUR ETC.
Centralized/decentralized materials mentioned below :-
STP Pole 11 Mtr. Stud type
11 kv pin insulator WITH GI PIN
11 kv Disc Insulator with fitting
F-bracket for fixing top insulator Nut&Bolts
Stay Set Complete
Pole Earthing Complete
Stone Pad
M.S. Top Channel (100x50x2240 mm)
CROSS BRACING ANGLE SET
CLAMP FOR X- BRACING
barbed wire
Danger Board
P G CLAMP
Number plate with clamp N/B
Shifting work of DT (25/63/100 KVA) by completing following works or jobs as per RESPO Drawings/Estimate with centralized and decentralized materials.Work Includes all cartage, carriage, T&P, raw materials and any other material/work which is required for completion of said work but not mentioned in this boq/Estimate.
Erection of Double pole structure of STP with all accessories & painting etc.
CONCREATING OF SUPPORT WITH ALL RAW MATERIAL, LABOUR ETC.
EARTHING COMPLETE by MS Earth rod
COMPLETE STAY
CONCREATING OF STAY WITH ALL RAW MATERIAL, LABOUR ETC.
Laying/Erection of ACSR Weasal Conductor Insulated
Installation of Tail less unit Complete
Laying/Erection of LT PVC Cable 1x240 sq mm
Neutral/Body Earthing of distribution transformers. It includes digging of pit upto water level depth and then inserting 32 mm dia GI pipe of “B” grade, confirming to the requirement of IS specification and then connecting the top of the inserted pipe by MS flat of size 50x3.3 mm or appropiate size with the help of nut and bolt or through welding, as per direction of Supervising Engineer. It includes the cost of all material, labour, T & P cartage etc. required for proper completion of work.The aforesaid work shall be carried out as per RESSPO norms..
Making of POLE PLINTH with all materials
Mounting of 25/63/100 KVA Transformer on the double pole structures and connections thereof.
Centralized/decentralized materials mentioned below :-
STP Pole 11 Mtr. SP 55
11 kv pin insulator WITH GI PIN
Stay Set Complete
Pole Earthing Complete
Stone Pad
M.S. Top Channel (100x50x2240 mm)
Danger Board
11 kv TPMO
11 Kv D.O. Fuse Set
ACSR Weasal Conductor Insulated
Dropper Channel
Tail less unit Complete with Structure
LT PVC Cable 1x240 sq mm
Alluminium Lug 240 Sq mm
25/63/100 KVA T/F
Shifting work of DT (250/400 KVA) by completing following works or jobs as per RESPO Drawings/Estimate with centralized and decentralized materials.Work Includes all cartage, carriage, T&P, raw materials and any other material/work which is required for completion of said work but not mentioned in this boq/Estimate.
Erection of Double pole structure of STP with all accessories
CONCREATING OF SUPPORT WITH ALL RAW MATERIAL, LABOUR ETC.
COMPLETE STAY
CONCREATING OF STAY WITH ALL RAW MATERIAL, LABOUR ETC.
Making of POLE PLINTH with all materials
Constructions of transformer plinth of size 5.5x5.5x6 feet, with the help of first class brick and masonary in the ratio 1:4 cement & sand coarse. Filling the structure completely as per norms with RCC top 1:2:4 cement, sand coarse and stone grit with MS Bar and MS channel for resting transformer wheel (100x50x1650mm) and plaster. All material shall be provided by the contractor. Old good conditioned bricks, stronegrit and MS bar/MS channel etc will be used after approval of Supervisory Engineer to lower the cost of work. Work includes Removal of T/F from old plinth and re-energize the T/F on earth safely till new plinth construction. Then after remounting the T/F on newly constructed plinth and making all connections to energize the T/F.
Installation & commissioning of LT INCOMING PANEL WITH METERING EQ
Laying of LT XLPE CABLE 3.5X400 SQ MM
Mounting of 250/400 KVA Transformer on the Plinth structures and connections thereof.
Centralized/decentralized materials mentioned below :-
STP Pole 11 Mtr. SP 55
11 kv pin insulator WITH GI PIN
Stay Set Complete
Stone Pad
M.S. Top Channel (100x50x2240 mm)
11 kv TPMO
11 Kv D.O. Fuse Set
Dropper Channel
LT INCOMING PANEL WITH METERING EQ
LT XLPE CABLE 3.5X400 SQ MM
250/400 KVA T/F
LT PROTECTION OF DT by completeing following works/jobs as per RESPO Drawings/Estimate with centralized and decentralized materials.Work Includes all cartage, carriage, T&P, raw materials and any other material/work which is required for completion of said work but not mentioned in this boq/Estimate.
Pole Earthing Complete
Danger Board
Number plate with clamp N/B
GI Wire chain Link Net for Fencing mesh D Fence Wire with Foldable
Double through double pole 11 kv TPMO
Copper L Piece 50x50x6 MM
Pipe Earthing Pannel Neutral & TF Neutrul & Body
Chemical Earthing Pannel body & Fencing
3 phase 11 Kv D.O. Fuse Set heavy duty
ACSR Weasal Conductor Insulated
LT Protection pannel with 3 Nos of ckt. By stud type tell less fuse unit . Compatable for installation of MCCB 1000
LT PVC Cable 1x400 sq mm Single core
All Lugs 400 sq mm
Nut & Bolt and washer
Foundation of LT Protection pannel 30 cm Hieght.
PAINTING OF POLE
Interlocking of base in transformer area
Toe Wall for Fencing
Granular sub base for laying of interlocking bricks
Clamp angle for panel mounting support
Erection,installation and commissioning of LT 3ø overhead lines by completeing following works/jobs as per RESPO Drawings/Estimate with centralized and decentralized materials.Work Includes all cartage, carriage, T&P, raw materials and any other material/work which is required for completion of said work but not mentioned in this boq/Estimate.
Erection of PCC Pole 8.5 Mtr. Long with all accessories.
Erection of ST Pole 9 Mtr long with all accessories.
Laying of XLPE 120*1 SQ MM SINGAL Core on overhead line with making loop, connections etc.
Laying of ABC (3x120+1x16) sq mm Cable
Laying of ABC (3x95+1x70+1x16) sq mm Cable
Laying of ABC (3x50+1x35+1x16) sq mm Cable
Installation of LT Distrution Box For ABC Cable (3-Phase) with all connections & commissioning.
Stay Set Complete
EARTHING COMPLETE by MS Earth rod
CONCREATING OF SUPPORT WITH ALL RAW MATERIAL, LABOUR ETC.
Centralized/decentralized materials mentioned below :-
Stay Set Complete
Pole Earthing Complete
ABC (3x120+1x16) sq mm
ABC (3x95+1x70+1x16) sq mm
ABC (3x50+1x35+1x16) sq mm
XLPE 120*1 SQ MM SINGAL 1500 M
LT Distrution Box For ABC Cable (3-Phase)
D B Clamp
Dead End Clamp with Eye Bolt For PCC
I Hook for ABC
Piercing connector of size 120/95/50 sq mm
LTD Cable 1.35 Sq mm for conneting Distribution Box
PCC Poles 8.5 Mtr. Long
STP Poles 9 Mtr. Long
LT Shahckle Insulator
Suspention Clamp
Nut & Bolt and washer
Dismentling of previous 11 KV/LT Line material, TF double poles, DT etc. against above shifting works etc. and safely shifting of balance material to JE store/ store centre.
Fabrico India Pvt. Ltd, (BID ID -5274118)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .