Loading…
Loading…
Tender Value
₹9.9 L
EMD Value
₹99,400
Closing Date
29 Sept 2026, 2:00 pm4d left
EXCEUTIVE OFFICER
EXCEUTIVE OFFICER NAGAR PALIKA PRISHAD NAWABGANJ
Construction of a silage store within the gaushala (cattle shelter) complex located at Manjhalepur, within the municipal limits.
2026_DOLBU_1181821_1
969/970/MUKA/2026-27 DATE 01-09-2026
Open Tender
Civil Works
Percentage
60 days
NAGAR PALIKA PRISHAD NAWABGANJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,475
Yes
0315104000102247 IDBI BANK
₹99,400
Yes
5 Sept 2026
5 Sept 2026
30 Sept 2026
5 Sept 2026
29 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance and malva Cleaning of side and etc & Complete | 4 | mandays | 320 | ₹1,280 |
| 2 | Excavation in Foundation in Ordinary Saoil ( Loam clay or sand ) including filling lift upto 1.50 meter and lead upto 30 mt including filling , wareting and ramimng of excated wotk into treanches etc as directed by E-in-Charge upto a distance of 30 m From the foundation trenches in S.I.NO. 251 | 15.1 | cum | 140 | ₹2,114 |
| 3 | Providing and laying Cement Concrete 1:6:12 (1 cement :4 fine sand 8 graded Brick Ballast 40 mm nominal size ) including supply of all materials and labours and T&P etc Required for proper comlete ,also including cost of foemwork in foundation in [S.I.NO.273] | 14.04 | cum | 3,950 | ₹55,458 |
| 4 | R.C.C. work with cement approved course sand and 2cm (3/4') gauge approved stone ballast in the proportion of 1:2:4 but for slab excluding supply of reinforcement and its bending but includiing necessary centering and uttering etc and also including supply of all meterials laboursnd T&P etc required for proper completion of the work above but in RCC Columns in [DAR NO.5.2.2] | 4.36 | cum | 8,575 | ₹37,387 |
| 5 | First Class brick work in 1:4 in cement and coase sand of 1.25 F.M. mortar in foundation and plinth inclding supply of all materials and labours and T.&P. etc requiredfor proper completion of the work in S.I. no. 305(b) | 4.51 | cum | 5,390 | ₹24,308.9 |
| 6 | R.C.C. work with cement approved course sand and 2cm (3/4') gauge approved stone ballast in the proportion of 1:2:4 but for slab excluding supply of reinforcement and its bending but includiing necessary centering and uttering etc and also including supply of all meterials laboursnd T&P etc required for proper completion of the work S.I. nO-285A | 2.31 | cum | 8,854 | ₹20,452.74 |
| 7 | First Class brick work in 1:4 in cement and coase sand of 1.25 F.M. mortar in foundation and plinth inclding supply of all materials and labours and T.&P. etc requiredfor proper completion of the work in Super stracture [SOR.NO. ] | 8.28 | CUM | 5,390 | ₹44,629.2 |
| 8 | 12 mm cement plaster of mix 1:3 with cement & fine sand in single Coat on flair site in bed and wall including all materials asnd labours | 43.08 | sqm | 190 | ₹8,185.2 |
| 9 | Milt steel or iron in plain work such as reinforced concrete or reinforced brick work wrouhgt to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastages and over lapping and hookes S.I.NO.504 (U-Bar@15cm c/c) | 5.23 | Qtl. | 7,500 | ₹39,225 |
| 10 | M.S. Steel work in build up tuber 110mm dia m.s. pipe thickness 3 mm @20.10kg/rmt | 2,506.61 | kg | 142 | ₹3,55,938.62 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.87 MB
BOQ_2221844.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .