Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.9 LAccepted-AOC 11 | VIRUDHUNAGAR | TAMIL NADU | 626202 | 1 | Accepted-AOC Lowest rate | |
| 2 | 2₹5.1 L+₹15,218.45 (3.10%)Rejected-AOC | 2 | Rejected-AOC Highest rate |
| Sl No | Description | Qty | Unit | Balakrishnan L2 | Madasamy L1 |
|---|---|---|---|---|---|
| 1.00Name of Work: Providing Borewell motor and Pumproom and EPL 600m at Karuvelambadu in Karuvelambadu Panchayat in Alwarthirunagari Panchayat Union Surplus Fund 2025 - 2026 | |||||
| 2.00 | Drilling charges for 150mm dia borewell in Hard rockdatausing contractor's rig,fuel,labour and drilling bentonite mud and water requir for drilling at site including construction of mud pit etc. complete. | 95 | Cubic metre | 340 ₹32,300 | 330 ₹31,350 Lowest |
| 3.00 | Cost and supply of 150mm casing pipe | 36 | Cubic metre | 460 ₹16,560 | 457 ₹16,452 Lowest |
| 4.00 | Supply and delivery of 3HP (50 X 100 lpm) 3 phase Submerssible pumpset without panel board including all costs etc complete | 1 | Cubic metre | 50,410 ₹50,410 | 50,400 ₹50,400 Lowest |
| 5.00 | Supply and delivery of 3 phase 3HP panel board including all cots etc complete | 1 | Cubic metre | 16,400 ₹16,400 | 16,390 ₹16,390 Lowest |
| 6.00 | cost and supply of 50mm HDPE pipes | 95 | Cubic metre | 80 ₹7,600 | 78 ₹7,410 Lowest |
| 7.00 | Supply & Delivery of 4 sq.mm PVC insulated and sheathed 3 core flat type copper cable | 100 | Cubic metre | 210 ₹21,000 | 206 ₹20,600 Lowest |
| 8.00 | Earth work excavation and depositing on bank with in initial lead lift in Hg soil for foundation etc. complete. | 5.93 | Cubic metre | 270 ₹1,601.1 | 260 ₹1,541.8 Lowest |
| 9.00 | Supplying and filling with excavated earth in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete For Foundation | 1.51 | Cubic metre | 50 ₹75.5 | 40 ₹60.4 Lowest |
| 10.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation | 0.83 | Cubic metre | 5,615 ₹4,660.45 | 5,600 ₹4,648 Lowest |
Tender Value
₹5.6 L
EMD Value
₹6,000
Closing Date
18 Feb 2026, 3:00 pmClosed
Block development officer,Alwarthirunagari
Block development officer,Alwarthirunagari
Providing Borewell motor and pumproom and EPL at Karuvelambadu in Karuvelambadu Panchayat
2026_RDTN_656744_1
T7/1085/2022 -4 06.02.2026
Open Tender
Civil Works - Water Works
Works
90 days
Work
V
4 documents required · 4 mandatory
₹0
₹6,000
Yes
3 Mar 2026
13 Feb 2026
18 Feb 2026
13 Feb 2026
18 Feb 2026
13 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work: Providing Borewell motor and Pumproom and EPL 600m at Karuvelambadu in Karuvelambadu Panchayat in Alwarthirunagari Panchayat Union Surplus Fund 2025 - 2026 | - | - | - | - |
| 2 | Drilling charges for 150mm dia borewell in Hard rockdatausing contractor's rig,fuel,labour and drilling bentonite mud and water requir for drilling at site including construction of mud pit etc. complete. | 95 | Cubic metre | - | - |
| 3 | Cost and supply of 150mm casing pipe | 36 | Cubic metre | - | - |
| 4 | Supply and delivery of 3HP (50 X 100 lpm) 3 phase Submerssible pumpset without panel board including all costs etc complete | 1 | Cubic metre | - | - |
| 5 | Supply and delivery of 3 phase 3HP panel board including all cots etc complete | 1 | Cubic metre | - | - |
| 6 | cost and supply of 50mm HDPE pipes | 95 | Cubic metre | - | - |
| 7 | Supply & Delivery of 4 sq.mm PVC insulated and sheathed 3 core flat type copper cable | 100 | Cubic metre | - | - |
| 8 | Earth work excavation and depositing on bank with in initial lead lift in Hg soil for foundation etc. complete. | 5.93 | Cubic metre | - | - |
| 9 | Supplying and filling with excavated earth in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete For Foundation | 1.51 | Cubic metre | - | - |
| 10 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation | 0.83 | Cubic metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_787576.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_787576.xls
BOQ • 0.26 MB
TechnicalBid.pdf
Tender Documents • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .