Loading…
Loading…
| Sl No | Description | Qty | Unit | J DASS L2 | P Sampath L1 |
|---|---|---|---|---|---|
| 1.00Providing of Distribution New Pipe Line (550m) in Mullikolathur Village at Mullikolathur Panchayat Est amt - 2.54 Lakhs | |||||
| 2.00 | Earth work excavation in all types of soil lead And lift ss 20 B etc complete Including All Labour Charges Including Cost and Conveyance etc Complete | 351.18 | cum | 320 ₹1,12,377.6 Lowest | 320 ₹1,12,377.6 Lowest |
| 3.00 | Supply and Following of 63 mm dia PVC Pipe Including Cost and Conveyance etc Complete. 6 KSC | 560 | cum | 95 ₹53,200 | 73 ₹40,880 Lowest |
| 4.00 | Supply and Fixing of PVC Pipe Including Cost and Conveyance etc Complete. 6KSC | 560 | sqm | 19 ₹10,640 Lowest | 19 ₹10,640 Lowest |
| 5.00 | Refilling excavated earth Including All Labour Charges Including Cost and Conveyance etc Complete | 351.18 | sqm | 42 ₹14,749.56 Lowest | 42 ₹14,749.56 Lowest |
| 6.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 34,374.09 ₹34,374.09 | 32,156.49 ₹32,156.49 Lowest |
Tender Value
₹2.2 L
EMD Value
₹2,500
Closing Date
14 Mar 2026, 3:00 pmClosed
The Village Panchayat President Mullikolathur
The Village Panchayat President Mullikolathur
Providing of Distribution New Pipe Line (550m) in Mullikolathur Village at Mullikolathur Panchayat
2026_RDTN_674501_1
3059/2025/A6
Open Tender
Civil Works
Item Rate
180 days
Mullikolathur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,500
Yes
29 Jul 2026
13 Mar 2026
14 Mar 2026
13 Mar 2026
14 Mar 2026
13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing of Distribution New Pipe Line (550m) in Mullikolathur Village at Mullikolathur Panchayat Est amt - 2.54 Lakhs | - | - | - | - |
| 2 | Earth work excavation in all types of soil lead And lift ss 20 B etc complete Including All Labour Charges Including Cost and Conveyance etc Complete | - | cum | 329.73 | - |
| 3 | Supply and Following of 63 mm dia PVC Pipe Including Cost and Conveyance etc Complete. 6 KSC | - | cum | 73.6 | - |
| 4 | Supply and Fixing of PVC Pipe Including Cost and Conveyance etc Complete. 6KSC | - | sqm | 23.75 | - |
| 5 | Refilling excavated earth Including All Labour Charges Including Cost and Conveyance etc Complete | - | sqm | 42.85 | - |
| 6 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | - | GST Amount | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_810702.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_810702.xls
BOQ • 0.32 MB
Techbid.pdf
Tender Documents • 1.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].