Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.6 LAccepted-AOC WARD 18 RAJPUR GHAZIABAD | ETAWAH | UTTAR PRADESH | 206001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹67.6 LSame as L1Rejected-Finance C 226 SHALIMAR GARDEN EXTENTION 2 SAHIBABAD GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | L2 | Rejected-Finance L2 | |
| 3 | L2₹67.6 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 | |
| 4 | L2₹67.6 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 | |
| 5 | L2₹67.6 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹79.6 L
EMD Value
₹2.4 L
Closing Date
30 Apr 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
Construction of drain and CC road on the remaining part of the approach road to the dumping ground in Nidori village.
2026_DOLBU_1136236_16
116/Nirman/2026-27 Date 04.04.2026
Open Tender
Civil Works
Percentage
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,632
₹2.4 L
3 Jun 2026
13 Apr 2026
30 Apr 2026
13 Apr 2026
30 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth Work in Embankment (lead upto 8 km) in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth earth work in embenkment to in 20 cm layers including remming and dressing the surface to required levels and slops also including 1.50 m lift and 30 m lead. The earth form cutting to be used in making in embekment or to be disposited and spoil banks with in 30 M. distance as directed by the engineer in charge etc all complete as per the direction of engineer in charge. | - | CUM | - | - |
| - | Supply of 45 to 63 mm gauge stone ballast with stacking for measurment etc all complete as per the direction of engineer in charge.RMR | - | CUM | - | - |
| - | Supply of 22.4 to 53 mm gauge stone ballast with stacking for measurment etc all complete as per the direction of engineer in charge.RMR | - | CUM | - | - |
| - | Supply of Screeing material with stacking for measurment etc all complete as per the direction of engineer in charge.RMR | - | CUM | - | - |
| - | Consolidation of stone aggregates of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2/3 as per Technical Specification Clause 405.(SOR 2022 SI. N. 20.02 ITEM N. 752) | - | CUM | - | - |
| - | Construction of un-reinforced, dowl jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine. Technical Specification Clause
1501 ( SOR 2022/20.12) | - | CUM | - | - |
| - | S/L P:C:C (1:6:12) with 40 mm gauge brick ballast ,fine sand of 1.25 f.m and cement in foundation and under floor including all materials, labour, tools, & plant etc all completed as per the direction of engineer - in - charge.{ AS PER PWD SOR 2022 PAGE NO 18 SI NO 5.01 ITEM NO 273 } | - | CUM | - | - |
| - | R.C.C work with cement ,approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of doors &windows excluding supply of reinforcement and its bending ,but including its fixing and binding wire including necessary cantering and shuttering etc .and supply of all materials,labour,tools& plants etc. required for proper completion of the work including cost of binding wire. the rate excludes making of drip course which shall be paid extra etc all complete as per direction of engineer in charge.(AS PER PWD SOR 2020/283 a .) | - | CUM | - | - |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and Medium Tensile steel bars DSR 2023 ITEM N. 5.22.1 | - | QTL | - | - |
| - | DPR CHARGE etc all completed as per the direction of engineer - in - charge. | - | JOB | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
T1-T2-T3.pdf
Additional Documents • 2.77 MB
BOQ_2121828.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .