Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.3 LAccepted-AOC | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹39.9 L+₹3.6 L (9.90%)Rejected-Finance | L2 | Rejected-Finance HIGHER BIDDER | |
| 3 | L3₹46.2 L+₹9.9 L (27.3%)Rejected-Finance | L3 | Rejected-Finance HIGHER BIDDER | |
| 4 | L4₹47.4 L+₹11.1 L (30.7%)Rejected-Finance | L4 | Rejected-Finance HIGHER BIDDER | |
| 5 | L5₹48.2 L+₹11.9 L (32.9%)Rejected-Finance H NO 767 NEAR OLD POST OFFICE NEW VADDEM VASCO DA GAMA GOA 403 802 | SOUTH GOA | GOA | 403802 | L5 | Rejected-Finance HIGHER BIDDER |
Tender Value
₹49.1 L
EMD Value
₹98,200
Closing Date
27 Mar 2023, 6:00 pmClosed
SHRI BIJENDRA SHARMA IDSE EE
GARRISON ENGINEER (NW) VASCO Opposite KV No.2, School, Shantinagar, Vasco-Da-Gama, Goa-403802
8503/23/E8
2023_MES_584459_1
8503/23/E8
Open Tender
Civil Works
Item Rate
365 days
VASCO
Class D Category a i
9 documents required · 9 mandatory
₹500
GE NW VASCO
₹98,200
Yes
24 Apr 2023
4 Mar 2023
29 Mar 2023
4 Mar 2023
27 Mar 2023
21 Mar 2023
6 Mar 2023 - 20 Mar 2023
Amount
M&L for cutting of vegetation / grass shrubs using bush cutting machine including cutting of small trees etc by manually near runway, taxi track, dispersal and W/T pad sides upto GL & cutting of bushes including grubbing up small trees and removing the waste to a distance exc 5 km outside the periphery of the airfield area complete all as specified and as directed.
All as per item No 1.00 above for the same location after a minimum gap of one month or more than one month after first cutting all as directed.
All as per item No 1.00 above for the same location after a minimum gap of one month or more than one month after second cutting all as directed.
All as per item No 1.00 above for the same location after a minimum gap of one month or more than one month after third cutting all as directed.
Removing leaves, grass, bushes, soil, plastic bags or any other waste material/debris from drains of depth not exceeding 1 mtr and removing the debris to a distance not exceeding 5 Km outside the periphery of the airfield area including removing and refixing of cover slabs all as directed.
M&L for dry sand filling over SGA including spreading, levelling and ploughed to form furrows at an angle of 30 degrees proportionally to the existing ground. (Sand shall be coarse sand as approved of size 1.16 to 2.34 micron all as specified and as directed). Note :- (i) Mode of measurement shall be truck measurement / trucks body (internal consolidated) measurements.
Ploughing and furrowing SGA point by mannually all as directed (Furrows should be to form of 30 degree angle).
All as per item No. 7.00 above on the same area after three months of first time or as and when required.
All as per item No. 7.00 above on the same area after three months of second time or as and when required.
All as per item No. 7.00 above on the same area after three months of third time or as and when required.
All as per item No. 7.00 above on the same area after three months of fourth time or as and when required.
M/s Abhay Enterprises
sapna enterprises
Susheel Enterprises
M/S DUBAL CONSTRUCTION
K M SUBHANAIAH
SHIVANI ENTERPRISES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .