| Sl No | Description | Qty | Unit | M.Manimaan L1 | H.Venkateswaran L2 |
|---|---|---|---|---|---|
| 1.00 | Fabrication and supply of Tower Parts as per specification including cost of all materials, labour, leads, and lifts etc., complete. GI – Tower Parts for Special cross arm MS Tower | 32.3 | MT | 1,10,000 ₹35.5 L | 1,30,000 ₹42.0 L |
| 2.00 | Supply of Hot dip galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification (Various size) | 0.42 | MT | 1,30,000 ₹54,600 | 1,50,000 ₹63,000 |
| 3.00 | Supply of ACSR Panther Conductor as per IS conforming to latest. | 45.2 | Kms | 2,95,000 ₹1.3 Cr | 3,15,000 ₹1.4 Cr |
| 4.00 | Supply of hardware fittings as per IS conforming to latest issue Single suspension fittings for Panther | 153 | Set | 1,300 ₹2.0 L | 1,500 ₹2.3 L |
| 5.00 | Supply of hardware fittings as per IS conforming to latest issue Double tension fittings for Panther | 18 | set | 4,000 ₹72,000 | 4,500 ₹81,000 |
| 6.00 | Supply of hardware fittings as per IS conforming to latest issue Single tension fittings for Panther | 468 | Set | 1,400 ₹6.6 L | 1,500 ₹7.0 L |
| 7.00 | Supply of Panther conductor accessories as per relevant IS of latest issue Vibration dampers for Panther | 408 | Set | 600 ₹2.4 L | 625 ₹2.5 L |
| 8.00 | Supply of Panther conductor accessories as per relevant IS of latest issue Midspan Joint for Panther | 10 | Set | 450 ₹4,500 | 425 ₹4,250 |
| 9.00 | Supply of Panther conductor accessories as per relevant IS of latest issue Repair Sleeve for Panther | 30 | Set | 300 ₹9,000 | 300 ₹9,000 |
| 10.00 | Supply of Earthwire accessories as per relevant IS of latest issue subitable 7/3.55mm HTGS earthwire Tension fitting | 28 | Set | 600 ₹16,800 | 650 ₹18,200 |
Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
25 Sept 2025, 2:30 pmClosed
CE/TP-I/CNI
the Chief EngineerTransmission Projects I Chennai 3rd Floor 230 KV GIS Substation building A10 Guindy Industrial Estate Guindy Chennai 32
Excavation, Concreting Supply of Double pole structure Erection and Stringing in Free arm stringing in Alamathy Periyapalayam SC line on DC tower for making LILO of Proposed Alamathy Periyapalayam 110kV feeder at Proposed Kilanur 110kV SS
2025_EB_603005_1
TP1-68/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works
180 days
Kilanur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.1 L
26 Mar 2026
11 Sept 2025
26 Sept 2025
11 Sept 2025
25 Sept 2025
11 Sept 2025
Amount
Fabrication and supply of Tower Parts as per specification including cost of all materials, labour, leads, and lifts etc., complete. GI – Tower Parts for Special cross arm MS Tower
Supply of Hot dip galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification (Various size)
Supply of ACSR Panther Conductor as per IS conforming to latest.
Supply of hardware fittings as per IS conforming to latest issue Single suspension fittings for Panther
Supply of hardware fittings as per IS conforming to latest issue Double tension fittings for Panther
Supply of hardware fittings as per IS conforming to latest issue Single tension fittings for Panther
Supply of Panther conductor accessories as per relevant IS of latest issue Vibration dampers for Panther
Supply of Panther conductor accessories as per relevant IS of latest issue Midspan Joint for Panther
Supply of Panther conductor accessories as per relevant IS of latest issue Repair Sleeve for Panther
Supply of Earthwire accessories as per relevant IS of latest issue subitable 7/3.55mm HTGS earthwire Tension fitting
Supply of Earthwire accessories as per relevant IS of latest issue subitable 7/3.55mm HTGS Aluminium earth bond
Supply of Number plate including cost of all materials, labour, lead and lift etc., complete.
Supply of Phase plate (Set of three) including cost of all materials, labour, lead and lift etc., complete.
Supply of Circuit Plate including cost of all materials, labour, lead and lift etc., complete.
Supply of Name Board including cost of all materials, labour, lead and lift etc., complete.
Supply of Danger Board including cost of all materials, labour, lead and lift etc., complete.
Labour Charges for check survey, clearing jungles, carrying theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by Department Engineer at site.
Levelling the site and removing scrub jungles and earth by engaging 'JCB' with lead and lift, hire charges etc., complete.
Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including cost of all materials, T&P, lead, lift, labour etc., complete.
Dewatering charges during excavation and concreting wherever required with 3/5 HP Diesel motor with Pump including hire charges, labour, fuel, oil, transport and operator charges etc., complete.
Providing temporary bund around tower location by supply and filling up the empty polythene bags with sand, stitchig them, conveying the same to site and stacking, laying in position around tower location and disposing off from site after successful completion of work including polythene bags, jute, thread, and all materials and labour charges for filling sand, laying and filling and bailing out of water etc., complete and as directed by the Engineer at site.
Supplying and laying of 900 mm dia RCC hume pipe in water logging areas for formation of approach road including cost of materials labour lead lift transport etc complete.
PCC 1 : 3 : 6 Grade using 20 mm HBG metal for padding and footing concrete without form work including cost of all materials curing, labour lead and lift. etc., complete.
PCC 1 : 2 : 4 Grade using 20 mm HBG metal for padding and footing concrete without form work including cost of all materials curing, labour lead and lift. etc., complete.
PCC 1 : 2 : 4 Grade using 20 mm HBG metal for footing concrete with form work including cost of all materials curing, labour lead and lift. etc., complete.
Spreading of surplus earth around the area including cost of allmaterials, labour charge, lead, lift, etc., complete.
Providing Pipe type earthing to towers including all materials G.I pipe 3 m length required length of Earth wire and welded with washer at end connecting with Tower leg and all lead, lift etc., complete.As directed by the Engineer at site.
Labour charges for transporting and erection of towers with bolt nut including sorting out of tower parts tightening, punching of bolts and nuts and rectification of defects if any during erection.
Welding of exposed faces of bolts and nuts 1cm each at two places opposite to each other after tightening, punching to avoid theft of tower parts including cost of welding rods, hire charges for generator including welding rods and painting, with good quality of zinc paint on the welded portion etc., complete.
Labour charges for transporting and hoisting of 90kN Disc insulator strings including cost of fitting and all materials, labours, lead, and lift, etc., complete. Under LC condition
Labour charges for transporting and hoisting of 2 x 120KN tension insulator strings including cost of fitting and all materials, labours, lead, and lift, etc., complete. Under LC condition
Labour charges for transporting and hoisting of 120kN tension insulator strings including cost of fitting and all materials, labours, lead, and lift, etc., complete. Under LC condition
Labour charges for paying out of 3 Nos. Panther conductor with fittings including sorting out of conductor according to drum schedule and loading and unloading at site providing trussels cost of T&P lead and lift etc., complete.
Labour charges for rough sagging, and tensioning, clipping jumpering for 3 nos. Panther conductor including cost of all materials, labour, tools and plants, lead and lift etc., complete. Continous Span
Labour charges for rough sagging, and tensioning, clipping jumpering for 6 nos. Panther conductor including cost of all materials, labour, tools and plants, lead and lift etc., complete. Single Span
Labour charges for rough sagging, and tensioning, clipping jumpering for 6 nos. Panther conductor including cost of all materials, labour, tools and plants, lead and lift etc., complete. Jumper Span
Labour charges for paying out and stringing of 1 No. GI earth wire with fittings including sorting out of conductor according to drum schedule and loading and unloading at site providing trussels cost of T&P lead and lift etc., complete.
Arranging and availing of Shutdown works on LT & HT lines, etc., complete.
Plastering in CM 1:5 12 mm thick including cost of all materials, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site.
Painting with two coats of anti corrosive black paint over stub and leg of tower for depth of 0.45 m including cost of all materials, labours, lead and lift, etc., complete.
CGST in % (For Bidders inside TamilNadu)
SGST in % (For Bidders inside TamilNadu)
IGST in % (For Bidders outside TamilNadu)
H.Venkateswaran (BID ID -1471370)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_720821.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid