Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L Quoted ₹4.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.9 LRejected-AOC NO 10 72 10TH STREET JOTHI NAGAR MANALI EXPRESS ROAD THIRUVOTTIYUR CHENNAI 600 019 | CHENNAI | TAMIL NADU | 600019 | ₹4.9 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SPK ENTERPRISES L1 | KUMARAN ENGINEERING WORKS L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling heavily eroded damper flap leaf assemblies in Airpreheater Flue gas inlet duct @ 34 mtr elevation. Charges including for T&P's and consumables. (Elevation -> 20 - 50 Mtr) | 0.25 | Ton | 21,000 ₹5,250 | 21,600 ₹5,400 |
| 2.00 | Charges for leading, lifting and transportation of iron and steel materials from store to site.(Elevation->20 to 50Mtr) | 2 | Ton | 9,000 ₹18,000 | 9,300 ₹18,600 |
| 3.00 | Charges for fabrication and erection of MS structurals and patch up work (Elevation -> 20 to 50 Mtr) | 2 | Ton | 82,000 ₹1.6 L | 84,000 ₹1.7 L |
| 4.00 | Charges for providing temporary scaffolding for positioning, aligning and welding of scaffolding materials dismantling the temporary scaffolding after completion of works. Charges inclusive of T&P's and consumables. | 400 | Sq.mtr | 284 ₹1.1 L | 300 ₹1.2 L |
| 5.00 | Supply of MS I Beam 200 mm
Material : IS 2062
Charges including loading, transporting & unloading to stores | 0.75 | Ton | 72,500 ₹54,375 | 75,000 ₹56,250 |
| 6.00 | Supply of Corten steel plate 3.15mm thk Charges including loading, transporting & unloading to stores | 1.25 | Ton | 97,000 ₹1.2 L | 99,000 ₹1.2 L |
Tender Value
Refer Docs
EMD Value
₹4,300
Closing Date
26 Jun 2025, 2:00 pmClosed
CE NCTPS II
Office of Chief Engineer NCTPS II CHENNAI 120
NCTPS II MI Circle Boiler Maintenance Division Unit II Boiler Reconditioning of
2025_EB_571317_1
CE NCTPS II SE M I O M 62 2025 26
Open Tender
Miscellaneous Works
40 days
SE MI NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,300
Yes
9 Jan 2026
19 Jun 2025
27 Jun 2025
19 Jun 2025
26 Jun 2025
19 Jun 2025
Amount
Charges for dismantling heavily eroded damper flap leaf assemblies in Airpreheater Flue gas inlet duct @ 34 mtr elevation. Charges including for T&P's and consumables. (Elevation -> 20 - 50 Mtr)
Charges for leading, lifting and transportation of iron and steel materials from store to site.(Elevation->20 to 50Mtr)
Charges for fabrication and erection of MS structurals and patch up work (Elevation -> 20 to 50 Mtr)
Charges for providing temporary scaffolding for positioning, aligning and welding of scaffolding materials dismantling the temporary scaffolding after completion of works. Charges inclusive of T&P's and consumables.
Supply of MS I Beam 200 mm Material : IS 2062 Charges including loading, transporting & unloading to stores
Supply of Corten steel plate 3.15mm thk Charges including loading, transporting & unloading to stores
KUMARAN ENGINEERING WORKS (BID ID -1378964)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid