Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.7 LAccepted-AOC | L-1 | Accepted-AOC L1 | |
| 2 | L-2₹3.3 L+₹63,191.36 (23.6%)Rejected-AOC MATHARDEV WARD PATHAKHEDHA SARNI BETUL MP 460001 | BETUL | MADHYA PRADESH | 460001 | L-2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical M N 75 IN FRONT OF NSB COLLEGE SARNI DISTT BETUL M P 460447 | SARNI | BETUL | MADHYA PRADESH | 460447 | - | Rejected-Technical Firm opt EMD Exemption is not as per NIT Clause No. 4 |
| Sl No | Description | Qty | Unit | CONTRACTO CONSTRUCTION CO L1 | NIGAM CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00SERVICING OF VALVES IN FOLLOWING SIZE:- | |||||
| 1.01 | 100 MM NB | 30 | Nos | 3,300 ₹3,894 Lowest | 3,420 ₹4,035.6 |
| 1.02 | 150 MM NB | 30 | Nos | 3,600 ₹4,248 Lowest | 6,570 ₹7,752.6 |
| 1.03 | 200 MM NB | 40 | Nos | 14,000 ₹16,520 Lowest | 18,000 ₹21,240 |
| 1.04 | 300 MM NB | 20 | Nos | 22,000 ₹25,960 Lowest | 25,120 ₹29,641.6 |
| 2.00SERVICING OF NON-RETURN VALVES IN FOLLOWING SIZE:- | |||||
| 2.01 | 100 NB. | 6 | Nos | 540 ₹637.2 Lowest | 684 ₹807.12 |
| 2.02 | 150 NB. | 6 | Nos | 660 ₹778.8 Lowest | 684 ₹807.12 |
| 2.03 | 200 NB. | 6 | Nos | 690 ₹814.2 Lowest | 1,020 ₹1,203.6 |
| 2.04 | 300/400 NB. | 6 | Nos | 1,350 ₹1,593 Lowest | 1,704 ₹2,010.72 |
Tender Value
₹3.1 L
EMD Value
₹6,300
Closing Date
13 Jun 2022, 3:00 pmClosed
SE (WORKS)
O/o CE(GEN) STPS MPPGCL SARNI
Running Maintenance Work of W.T. Plant, C.W. Pumps Systems and Turbine Auxiliaries for TMD-III at PH-III STPS Sarni.
2022_MPPGC_182906_1
WT-3737
Open Tender
Miscellaneous Works
Item Rate
365 days
STPS MPPGCL SARNI
As per NIT
4 documents required · 4 mandatory
₹500
Yes
₹6,300
Yes
16 Sept 2025
12 May 2022
15 Jun 2022
12 May 2022
13 Jun 2022
12 May 2022
SERVICING OF VALVES IN FOLLOWING SIZE:-
SERVICING OF NON-RETURN VALVES IN FOLLOWING SIZE:-
COMPLETE SERVICING OF FOLLOWING AUXILIARIES
FIRE FIGHTING PUMPS.
CLEAR WATER PUMPS.
CLARIFLOUCULATOR, AGITATOR & GEAR BOX.
DEWATERING PUMPS
PLANT AIR COMPRESSOR
ANNUAL WORK CONTRACT REQUIRED TO BE CARRY OUT ANY TIME ROUND THE YEAR-2022-23(RUNNING MAINT. WORK) Assistance in SERVICING OF FOLLOWING AUXILIARIES
CW-Domestic Water Pump / RAW WATER PUMP.
Chiller water Pump
A.C. Cooling Water Pump
Wire Rope/Pully of Gas Holders in Hydrogent Plant
LT Gear Box of CW Pump House Crane
Maint Hoist Gear Box of CW Pump House Crane
Hydrogen Compressor
DECOUPLING AND DEBELTING AND ALIGNMENT COUPLING / REBELTING OF FOLLOWING AUXS.
A.C.COMPRESSORS.
LAYING OF M.S.PIPE LINE
300/200 MM NB PIPE LINE.
300 MM NB PIPE LINE.
150 MM NB PIPE LINE.
100 MM NB PIPE LINE.
WELDING JOINT OF WATER LINE PIPE OF FOLLOWING SIZE
REPLACEMENT OF GLANDS OF FOLLOWING PUMPS.
FireFighting Pump/ Raw Water Pump/Chiller Water Pump/BCW Pump/HWM Pump
COMPLETE OVERHAULING OF T.W. SCREEN AS PER SCOPE OF WORK (ROUND THE YEAR)
ATTENDING TUBE LEAKAGES OF COOLERS OF AIR COMPRESSORS
WELDING OF STRUCTURE/PLATFORM/SUPPORT
Clarifier Bridge/CW Crane CanopyShed/Verticle Ladders/Pump Foundation Strengthing
NIGAM CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .