| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.2 LAccepted-AOC | ₹43.2 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹44.2 L+₹1.1 L (2.52%)Rejected-Finance LOWER KAFFER KALIMPONG | KALIMPONG | ₹44.2 L+₹1.1 L (2.52%) | L2 | Rejected-Finance Quoted Higher |
| 3 | L3₹44.4 L+₹1.2 L (2.82%)Rejected-Finance VILL BHADIISWAR PO MURARAI BIRBHUM PIN 731219 | MURARAI | BIRBHUM | WEST BENGAL | 731219 | ₹44.4 L+₹1.2 L (2.82%) | L3 | Rejected-Finance Quoted Highest |
Tender Value
₹43.2 L
EMD Value
₹86,333
Closing Date
13 Feb 2026, 5:00 pmClosed
DWO, BCW Department, Darjeeling, GTA
Maldon Building, Near Bhanu Bhawan, Darjeeling
GTA/DWO/ BCW/ NIeT-08(Sl No 01)/2025-26
2026_GTA_995489_1
GTA/DWO/ BCW/ NIeT-08(Sl No 01-02)/2025-26
Open Tender
CIVIL WORKS
Percentage
90 days
Darjeeling
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,500
₹86,333
14 Aug 2026
30 Jan 2026
16 Feb 2026
30 Jan 2026
13 Feb 2026
30 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. | |||||
| 1.1 | (a) Depth of excavation not exceeding 1.500 mm. | - | CuMtr | 1 | - |
| 2Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc.layer by layer complete .(payment to be made on the basis of measurement of finished quantity of work). | |||||
| 2.1 | (a) With earth obtained from excavation of foundation. | 1 | CuMtr | - | - |
| 3 | Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. | 1 | SqMtr | - | - |
| 4 | Cost of stone boulder 150 mm size delivered ans stacked at site. | 1 | CuMtr | - | - |
| 5(II) Cement concrete with 30 mm. down graded shingles excluding shuttering.N.B. VarietyIn ground floor .(a) 1:3:6 proportion. | |||||
| 6Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes. | |||||
| 6.1 | (ii) River bazree. | - | CuMtr | 1 | - |
| 7Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.98 MB
Tendernotice_2.pdf
PDF • 0.29 MB
BOQ_2436029.xls
BOQ • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .