Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 LAccepted-Finance WAGHJAI KRUPA MAJUR SAHAKARI SANSTHA MARYADIT KOLKEWADI TA CHIPLUN DIST RATNAGIRI MAHARASHTRA 415603 | CHIPLUN | RATNAGIRI | MAHARASHTRA | 415603 | ₹16.5 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹16.9 LAccepted-Finance | ₹16.9 L | L2 | Accepted-Finance Accepted |
| 3 | L3₹17.0 LAccepted-Finance | ₹17.0 L | L3 | Accepted-Finance Accepted |
Tender Value
₹16.5 L
Closing Date
12 Jan 2026, 5:00 pmClosed
Executive Engineer work division Chiplun ZP Ratnag
Dr.Babasaheb Ambedkar Bhawan,Malanaka, Z.P.Ratnagiri
Constructing Causeway Kolkewadi Vasadi Dhangarwadi road Km 1/200 Tal Chiplun Dist Ratnagiri (For Majoor Sahakari Sanstha only)
2026_RATNA_1266095_4
RZP/WD-Chiplun/E-Ten LabourCoOp Society-52/25-26
Open Tender
Civil Works - Bridges
180 days
Chiplun
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Exempted
9 Mar 2026
5 Jan 2026
13 Jan 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
Excavationforfoundation in hard murum including shoring and strutting,dewateringas necessary and disposing off excavated stuff as directed etc. complete.
Excavation for foundation in hard rock by Controled Blasting and including shoring and strutting,dewatering as necessary and disposing off excavated stuff as directed etc. complete.
Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 3.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary)
Providing and fixing in position TMT FE 500, 25mm dia steel anchor dowel bars precoated with anticorrosive epoxy paint of required Dia. 60 cms. Long and at 30.00 cm. C/C and wherever directed including handling, straightening, necessary cutting supported by TMT FE 500, chairs with proper alignment by using properly designed assembly of Bulkheads lubricating half length with bituminous paint as directed etc. complete.
Providing and laying in situ / ready mix / ready mix M10 cement concrete of trap/ granite/ quartzite/ gneiss metal in foundation including necessary centering, formwork, bailing out water, compacting and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with natural /artifical sand)
Providing cast in situ / ready mix M20 grade cement concrete for head walls of CD work / retaining walls etc. including necessary form work, compaction, finishing and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA
Providing and laying in situ cement concrete of 1:4:8 proportion with trap/ granite/ quartzite/ gneissmetal in foundation including necessary formwork, compacting and curing etc complete. (with reversible drum type mixer with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc )
Providing and laying cement concrete pipe of IS 458:2003 NP-3 class of 1000 mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete.
Providing and laying in situ/ ready mix M 20 CC of trap /granite/ quartzite/ gneiss metal for wearing course 8 cm thick including compacting,finishing,curingandfillinginjoints with bitumen etc. complete. (with fully automatic micro processor based PLC with SCADA enabled concrete batch mix plant /pan mixer with fine agreegates of required specifications ( VSI sand finely washed etc )
Providing,cutting,bending,hooking, tying and laying in position TMT FE 500 steel bars for reinforcement for all RCC works as per detailed drawings etc. complete.
Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources)
Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete.
Providing and fixing stream lined M-20 grade RCC guard stone including mild steel bar reinforcement etc. complete.
Providing and laying weep holes of 100 mm diameter PVC pipes as per drawing for abutment returns, return walls etc. Complete.
Excavation for road way in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 m. and spreading for embankment or stacking as directed.
Excavation for roadway in hard rock by controlled blasting including dressing section to the required grade,camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 m .and spreading for embankment or stocking as directed.(Inculding 50% Utilisation of useable Excavated material)
Excavation for catch / sidewater gutter inall sorts of soils to the specified section including stacking the excavated stuff In a regular bund and disposing o unsuitable or excess stuff as directed all sorts of soils.
Supplying trap/ granite/ quartzite/ gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken).
Supplying trap/ granite/ quartzite/ gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken).
Supplying soft murum at the road site, including conveying and stacking complete. ( Labour only)
Spreading 80/40 mm metal for road work including section on get ccomplete as directed by Engineer in charge .
Spreading hard murum/ soft murrum/ gravel or kankar for side width complete
Compacting the sub grade / grave / over size metal (200 mm loose) layers for all width with Power roller having weight 8 to10 MT. including necessary, labour, materials and artificial watering complete.
Test Reports
Royalty
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_2181166.xls
BOQ • 0.26 MB
B1KolkewadiVasadiSakav.pdf
Tender Documents • 0.39 MB
Download all tender documents and submit your bid