| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC 3788 SHAH GANJ GB ROAD NEW DELHI 110006 | NORTH | DELHI | 110006 | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹13.9 L+₹1.4 L (10.9%)Rejected-Finance | L2 | Rejected-Finance NOT LOWEST | |
| 3 | L3₹19.7 L+₹7.2 L (57.7%)Rejected-Finance G 58 KIRAN GARDEN UTTAM NAGAR NEW DELHI 110059 | NEW DELHI | WEST DELHI | DELHI | 110059 | L3 | Rejected-Finance NOT LOWEST | |
| 4 | L4₹23.5 L+₹11.0 L (87.8%)Rejected-Finance | L4 | Rejected-Finance NOT LOWEST | |
| 5 | Rejected-Technical | - | Rejected-Technical NOT HAVING DESIRED CATEGORY |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
13 Sept 2024, 6:00 pmClosed
GE (AF) PALAM
GE (AF) PALAM DELHI CANTT-10
REPAIR/ MAINTENANCE OF STP INSTALLATION AT PINTO PARK AT AF STN PALAM UNDER GE (AF) PALAM, DELHI CANTT-10
2024_MES_666944_1
8024/A/T-33/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE (AF) PALAM DELHI CANTT
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (AF) PALAM
₹40,000
Yes
23 Nov 2024
20 Jul 2024
20 Sept 2024
20 Jul 2024
13 Sept 2024
3 Aug 2024
Amount
Cleaning of equalizing tank /grit chamber/ oil grease chamber/stilling chamber of sewage water in the tank and removing of settle down sewage sludge cum mud/De-Silting etc and making good the patches of plaster of walls (internally or externally) in cement mortor 1:3 where required at site and directed by the Engineer-in-Charge.
Cleaning of sludge holding tank of sewage treatment plant and removing of settle down sewage sludge cum mud/De-Silting etc and making good the patches of plaster of walls (internally or externally) in cement mortor 1:3 where required at site and directed by the Engineer-in-Charge. Note for Item No. 1&2 : The rate quoted by the tenderer is deemed to be included in the unit rate for the following provisions :- (a) Pump Set of appropriate capacity with operators including necessary connections required at site including PVC heavy duty flexible hose pipe for suction and delivery purpose. (b) Lorry/Tractor mounted septic storage tank of appropriate capacity not less than 3 KL should be used for disposing off the sludge to the location where approved by the Delhi Canttonment Board/MCD (c ) Necessary mask, gloves, gum boot and all other safety aspects to be observed including necessary phawda, steel bucket, manila rope etc required at site and all as directed by the Engineer-in-Charge.
Cleaning of Fab-1 and Fab-2 of sewage treatment plant and removing of settle down sewage sludge cum mud/De-Silting etc and making good the patches on walls internally or externally in cement mortor 1:3 where required all as required at site and directed by the Engineer-in-Charge .
Cleaning of Tube settler of sewage treatment plant and removing of settle down Sewage sludge cum mud/De-Silting etc and making good the patches of plaster of walls (internally or externally) in cement mortor 1:3 where required at site and directed by the Engineer-in-Charge.
Cleaning of Treated water tank with chemical contact tank of STP by removing of all deposited sludge, scale or other unwanted materials from the tank by any means and removing the same from site to out side MoD land and after cleaning, washing and scraping the wall with complete all as specified and directed by Engr-in-Charge. Note for item No. 3 to 5: The rate quoted by the tenderer is deemed to be included in the unit rate of the following provisions :- (a) Pump Set of appropriate capacity with operators including necessary connections required at site for including PVC heavy duty flexible hose pipe for suction and delivery purposes. (b) Lorry/Tractor mounted septic storage tank of appropriate capacity not less than 3 KL should be used for disposing off the sludge to the location where approved by the Delhi Canttonment Board/MCD. (c ) Necessary oxygen mask, gloves, gum boot and all other safety aspects to be observed including necessary phawda, steel bucket, manila rope etc. required at site and all as directed by the Engineer-in-Charge. (d) Injection grouting with waterproofing chemicals in leakages surfaces above. (e ) Exposed external surfaces to be finished with two coats of cement paints where as decided by Engr-in-charge. (f) Internal surfaces to be coated with two coat of epoxy paint.
Supply and loading MBBR Bio media made of UPVC and corrugated shape having surface area in MBBR as directed by Engr-in-charge.
S&F for 25mm bore cast iron butterfly valve with stainless steel disc, gear mountable as per IS 13095 Class PN-1.6 complete with nuts, bolts, washer and rubber gasket including taking out old unserviceable butterfly valve complete all as specified and as directed.
Description all as per ser item No 7.00 above but 40 mm bore butterfly valve complete all as specified an as directed.
Description all as per ser item No 7.00 above but 50 mm bore butterfly valve complete all as specified an as directed.
Description all as per ser item No 7.00 above but 65 mm bore butterfly valve complete all as specified an as directed.
Description all as per ser item No 7.00 above but 80 mm bore butterfly valve complete all as specified an as directed.
Description all as per ser item No 7.00 above but 100 mm bore butterfly valve complete all as specified an as directed.
Description all as per ser item No 7.00 above but 150 mm bore butterfly valve complete all as specified an as directed.
Disconnectiong existing defective blower which run motor of capacity 10 to 15 HP from electric mains by isolating the naked connections, removing from foundation by unscrewing the nuts, bolts etc, dis-couple from motor, opening of blower for inspection in presence of Engr-in-Charge & carry out minor repairs at site re-assembling the motor after repair, refixing in position re-connecting same as prior to removing from foundation including replacement of nuts, bolts washers if necessiates of suitable size, testing and commissioning complete all as specified and as directed. Note:- Replcement of minor parts shall be deemed to be included in the unit rate. (b) In case of minor repairs not possible at site, the blower shall be shifted to contractor's workshop and cost of shifting to workshop and back to site shall be deemed to be included in unit rate.
Supply, laying, jointing, welding & testing of 150mm bore Mild Steel pipe ( Heavy duty Class 'C') including fittings as required laid in trenches or floor for connecting to various STP accessories and to connect outgoing water main including taking down the unserviceable pipe with fittings all as directed by Engr-in-charge. (Note:- MS flange and flange joint with jointing material shall deemed to be included in the quoted rate of this item).
Description all as per ser item No 15.00 above but 100 mm bore mild steel pipe complete all as specified and as directed.
Description all as per ser item No 15.00 above but 80 mm bore mild steel pipe complete all as specified and as directed.
Description all as per ser item No 15.00 above but 65 mm bore mild steel pipe complete all as specified and as directed.
Description all as per ser item No 15.00 above but 50 mm bore mild steel pipe complete all as specified and as directed.
Description all as per ser item No 15.00 above but 40 mm bore mild steel pipe complete all as specified and as directed.
Description all as per ser item No 15.00 above but 25 mm bore mild steel pipe complete all as specified and as directed.
Supply only DWPE chemical for sewage treatment plant complete all as specified and as directed.
Material & Labour in replacement of Quartz silica sand 32-64 grade complete all as specified and as directed.
Material & Labour in replacement of Quartz silica sand 16-32 grade complete all as specified and as directed.
Material & Labour in replacement of Quartz silica sand 8-16 grade complete all as specified and as directed.
Material & Labour in replacement of Quartz silica sand 4-8 grade complete all as specified and as directed.
Material & Labour in replacement of activated carbon IV 1000 complete all as specified and as directed.
Taking out complete pebbles from the filter and and refilling the same pebbles after washing /cleaning thoroughly complete all as specified and directed by Engr-in-charge.
S&F in replacement of 100mm bore cast iron sluice valve, Class PN-1.6, ISI mark, flanged ends drilled having stainless steel spindle with cast iron wheel at top complete with nuts, bolts, washers and gaskets complete all as specified and as directed.
Description all as per ser item No 29.00 here-in-before but of size 150mm bore complete all as specified and as directed.
Carrying sample for testing of treated water of STP and submission of detailed test report to the office of the Engineer-in-charge. Details are as under :- (a) Carry out minimum essential testing of water as per IS 3025 & IS 1622 mandatory for chemical , colour, odour, PH value, TSS, BOD,COD, Total residual chlorine, total Nitrogen, sulphate, oil and grease, Ammonical nitrogen(NH3-N) and Bacteriological total coliform organism per 100ml (MPN) and Ecoli in 100ml (b) Treated sewage water shall confirm to the following characterstics:- (i) TSS : < 10 mg/litre (ii) BOD : < 10 mg/ litre (iii) COD: < 150 mg/litre (iv) Ph: 6.5 -8.5 (v) Total coliform: < 100 MPN/100 ml (desired nil) (vi) Resudual CI> 1 mg/litre Rest of the characterstic of the treated water shall be as per IS 3025 & IS 1622. Note:- Quoted rate of the item shall deemed to be included for cost of testing and sterilized bottle as required, to and fro transportation charges for collection of sample etc complete.
Supply and mixing of Sodium hypochlorite having 10% chlorine content complete all as specified and as directed.
Supply and mixing of Poly Electrolite 100% Purity complete all as specified and as directed.
M&L for overhauling of air compressor coupled with blower motor 15 HP capacity Installed at Sewage treatment plant including necessary arrangement to transporting to workshop fro re-grinding of shaft, oiling ,greasing etc and necessary replacement of wornout bolts ,nuts ,washers, silencer, belt drivers, pressure guage, air-filter, bearings, shaft , rings etc including re-assembling the compressure with blower motor , commissioning and testing to the entire satisfaction of Engineer - in - charge .
Supply only compressor oil complete all as specified and as directed.
Disconnectiong existing defective electric motor of any make 3 to 5 HP from electric mains by isolating the naked connections, removing from foundation by unscrewing the nuts, bolts etc, dis-couple from pump, opening of motor for inspection in presence of Engr-in-Charge & carry out minor repairs at site re-assembling the motor after repair, refixing in position re-connecting same as prior to removing from foundation including replacement of nuts, bolts washers if necessiates of suitable size, testing and commissioning complete all as specified and directed.
Taking out old unserviceable/burnt copper winding of motors capacity 3 to 5HP (defective motor taken out from item No. 36 above) and material and labour for rewinding of electric motor with super enameled copper winding wire of suitable gauge as per existing including cleaning of rotor slots, all winding/insulation material, varnishing etc. complete and testing at site on full load after reinstallation to the full satisfaction of Engr-in-Charge, all as specified and as directed by Engr-In-Charge. Note :- (a) Cost of replacement of minor parts included in this item (b) In case of major repairs not possible at site, the motor shall be shifted to contractor’s wksp and cost of shifting to wksp and back to site included in the quoted rate of item.
M&L for replacement of Ball bearing of the electric motor upto 5 HP 3 phase / single phase complete all as specified and as directed. Make: SKF/TATA/NBC.
M&L for replacement of MS Shaft of the electric motor upto 5 HP 440 Volts complete all as specified and as directed.
Disconnectiong existing defective electric motor of any make 10 to 15 HP from electric mains by isolating the naked connections, removing from foundation by unscrewing the nuts, bolts etc, dis-couple from pump, blower etc opening of motor for inspection in presence of Engr-in-Charge & carry out minor repairs at site re-assembling the motor after repair, refixing in position re-connecting same as prior to removing from foundation including replacement of nuts, bolts washers if necessiates of suitable size, testing and commissioning complete all as specified and directed.
Taking out old unserviceable/burnt copper winding of motors capacity 10 to 15HP (defective motor taken out in item No. 40 above) and material and labour for rewinding of electric motor of capacity 10 to 15HP , 3 Phase with super enameled copper winding wire of suitable gauge as per existing including cleaning of rotor slots, all winding/insulation material, varnishing etc. complete and testing at site on full load after reinstallation to the full satisfaction of Engr-in-Charge, all as specified and as directed by Engr-In-Charge. Note :- (a) Replacement of minor parts partsincluded in this item (b) In case of major repairs not possible at site, the motor shall be shifted to contractor’s wksp and cost of shifting to wksp and back to site included in the item rates.
M&L in replacement of ball bearing of the electric motor 10 to 15 HP, 3 phase / single phase complete all as specified and as directed. Make:- SKF/TATA/NBC.
M&L in replacement of MS Shaft of the electric motor 10 to 15 HP, 440 Volts complete all as specified and as directed.
Taking out defective pump set of any type (raw sewage pumpet) of capacity upto 10 HP by unscrewing the foundation bolts, disconnecting from water connection, and disconnecting from electric motor, opening for inspection in presence of eng-in-charge and carry out minor repair at site, in case major repair /replacement of parts not possible at site, the pump shall be shifted to contractor's workshop on his own cost, and re-fixing , reconnecting in position, testing and commissioning complete including replacement of nuts and bolts washers as specified and directed. (Note: Cost of replcement of defective parts shall be included in the quoted rate of this item except for rewinding).
Taking out old unserviceable/burnt copper winding of motors capacity upto 10HP (defective motor taken out in item No. 44 above) and material and labour for rewinding of electric motor of capacity upto 10HP, 3 Phase with super enameled copper winding wire of suitable gauge as per existing including cleaning of rotor slots, all winding/insulation material, varnishing etc. complete and testing at site on full load after reinstallation to the full satisfaction of Engr-in-Charge.
Material & Labour for painting to exposed filter media tanks (ACF and DMF) at old STP installation with two coats of synthetic enamel paint as per specified colour code after cleaning and scraping out old paint including writing/marking complete all as specified and as directed.
Supply, layying, jointing and testing of AGRI Pipe 160mm bore of 10 kg pressure rating including fittings as required laid in trenches or laying on floor for connecting to various STP accessorries and to connect outgoing water main including taking down the unserviceable pipe with fittings with and including necessary excavation, earthwork etc complete all as specified and as directed.
Disconnecting, electrically, isolating the existing unserviceable MCCB of any make and capacity and Supply, fixing, connecting, testing and commissioning MCCB, FP, 125 Amp, breaking capacity upto 16 kA, 440 volts fixed in existinig panel including necessary modification for new MCCB, TP, 125 Amp conforminig to relevant IS or as per the existing specification complete all as specified and as directed.
Description all as per item No. 48.00 here in before but 63 Amp breaking capacity 16 kA complete all as specified and as directed.
S&F in replacement of MCB, DP, 6 to 32 Amp, 240V AC, breaking capacity 10 kA complete all as specified and as directed.
S&F in replacement of MCB, SP, 6 to 32 Amp, 240V AC, breaking capacity 10 kA complete all as specified and as directed.
S&F in replacement of Power contactor 32 Amps, 415 volts AC operated 3 phase ML-2 as per existing complete all as specified and as directed.
S&F in replacement of power contactor 40 Amps, 415 volts AC operated 3 phase ML-3 as per existing complete all as specified and as directed.
Supply & fixing in replacement of power contactor 40 Amps, 415 volts AC operated 3 phase ML-2 or as per existing complete all as specified and as directed.
S&F in replacement of BI metallic over load relay, range 28-42 Amp rating for automatic starters complete all as specified andd as directed.
Description all as per ser item No 55.00 above but 13-21 Amp complete all as specified and as directed.
Description all as per ser item No 55.00 above but 9-14 Amp complete all as specified and as directed.
S&F in replacement of 50mm bore foot valve under sewage tanks including pumpset with flexible hose pipe arrangement for suction and delivery purpose all as specified.
Description all as per ser item No 58.00 above but 100 mm bore foot valve complete all as specified and as directed.
S&F in replacement of LED tube light fitting 1x16Watt , 230 Volt with all accessories internally pre wired and including connecting up with twin core twisted flexible copper conductor cable of suitable size complete all as specified and as directed.
S&F in repair service cable PVC insulated copper conductor of size 6 Sqmm 3 core 1100 Volt grade served with inner sheathing of PVC tape and overall PVC sheathed in service connection suspended by insulating hangers not more than 1 metre apart including 4 mm suspension wire one twin core cable flat or circular complete all as specified and as directed.
S&F in repair submersible cable with copper conductor, stranded of size 6 Sqmm 3 Core complete all as specified and as directed.
Material and labour for lifting, cleaning and re-fixing of square or rectangular air grids for aeration in sludge holding tank, Equilization tank, MBBR Tank I and II to ensure fine bubbles dispersion with PVC/SS pipes of size 50mm dia inter connected with necessary flange all as required at site and directed by the Engineer-in-Charge.
Supply, fixing and arranging UPVC tube deck media all as required at site and directed by the Engineer-in-Charge.
Material & Labour for painting to existing LT panels installed at STP installations with one coat of synthetic enameled paint of approved colour on exposed surface including preparation of surfaces complete all as specified and as directed.
Material & Labour for painting to existing centrifugal motor & pumping set complete including base frame with one with two coats of synthetic enameled paint of existing colour/ approved colour for 3 to 5 HP capacity all as specified.
Material & Labour for painting to existing blower and coupled induction motor of upto 15 HP capacity complete including base frame with two coats of synthetic enameled paint of existing / approved colour all as specified.
M& L for painting to exposed CI/GI/MS pipr lines with two coats of synthetic enameled paint including sluice valves, fittings and NRVs at STP/ Water STP installations as per existing/ approved coulour after cleaning and scrapping out old paint all as required at site and directed by the Engineer-in-Charge.
M/S Delhi Engineering Co. (BID ID -3089098)
Sumit Enterprises (BID ID -3079007)
GARG TRADERS (BID ID -3090663)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .