| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.7 LAccepted-AOC | ₹28.7 L Quoted ₹30.0 L | L1 | Accepted-AOC Being Lowest |
| 2 | L2₹31.7 L+₹1.8 L (5.88%)Rejected-Finance N A | NA | NA | 121004 | ₹31.7 L+₹1.8 L (5.88%) | L2 | Rejected-Finance Being other than lowest |
| 3 | L3₹32.0 L+₹2.0 L (6.75%)Rejected-Finance | ₹32.0 L+₹2.0 L (6.75%) | L3 | Rejected-Finance Being other than lowest |
| 4 | L4₹33.6 L+₹3.7 L (12.2%)Rejected-Finance 66 C O J R NAICKER ASWATHNAGAR SANJAYNAGAR P O BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | ₹33.6 L+₹3.7 L (12.2%) | L4 | Rejected-Finance Being other than lowest |
| 5 | L5₹34.6 L+₹4.6 L (15.3%)Rejected-Finance A 47D RAM DUTT ENCLAVE UTTAM NAGAR NEW DELHI 110059 | WEST | DELHI | 110059 | ₹34.6 L+₹4.6 L (15.3%) | L5 | Rejected-Finance Being other than lowest |
| Sl No | Description | Qty | Unit | Vipul Construction L2 | OM ENTERPRISES L4 | garnet engineers contractors L1 | Akhil Enterprises L5 | aggarwal engineers contractors L3 | M/S GR construction compony L6 | yameen enterprises L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of Concrete in ground floors and pavings in any desciption and in any position complete all as specified and directed | 7 | Cum | 100 ₹700 | 1,026 ₹7,182 | 100 ₹700 | 277 ₹1,939 | 260 ₹1,820 | 200 ₹1,400 | 90 ₹630 Lowest |
| 2.00 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and directed by Engineer-in-Charge. | 5 | Cum | 100 ₹500 | 684 ₹3,420 | 100 ₹500 | 277 ₹1,385 | 260 ₹1,300 | 450 ₹2,250 | 90 ₹450 Lowest |
| 3.00 | Taking down Chowkhats or frames of door/windows exc 1.5 sqm but not exc 4 sqm each (without taking off shutters from the frame) complete all as specified and directed by Engineer-in-Charge. | 64 | Each | 55 ₹3,520 | 136.8 ₹8,755.2 | 50 ₹3,200 | 77 ₹4,928 | 96 ₹6,144 | 100 ₹6,400 | 30 ₹1,920 Lowest |
| 4.00 | Taking down Chowkhats or frames of door/windows not exc 1.5 sqm each (without taking off shutters from the frame) complete all as specified and directed by Engineer-in-Charge. | 64 | Each | 45 ₹2,880 | 102.6 ₹6,566.4 | 50 ₹3,200 | 77 ₹4,928 | 96 ₹6,144 | 100 ₹6,400 | 30 ₹1,920 Lowest |
| 5.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed by Engineer-in-Charge. | 1,100 | Sqm | 5 ₹5,500 Lowest | 41.04 ₹45,144 | 10 ₹11,000 | 7 ₹7,700 | 6 ₹6,600 | 20 ₹22,000 | 5 ₹5,500 Lowest |
| 6.00 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc. | 250 | Sqm | 5 ₹1,250 Lowest | 27.36 ₹6,840 | 5 ₹1,250 Lowest | 7 ₹1,750 | 16 ₹4,000 | 25 ₹6,250 | 5 ₹1,250 Lowest |
| 7.00 | Removal of demolished material /Debris beyond upto 5 kms including loading, unloading and stacking at the destination | 12 | Cum | 100 ₹1,200 | 239.4 ₹2,872.8 | 75 ₹900 Lowest | 277 ₹3,324 | 160 ₹1,920 | 200 ₹2,400 | 90 ₹1,080 |
| 8.00 | M&L for PCC 1:5:10 type C-2 (using 40 mm graded Aggregate) as in sunkern floor upto floor level, fdn, mass concrete, sub base of floors etc all as specified and directed | 25 | Cum | 2,875 ₹71,875 | 4,104 ₹1,02,600 | 500 ₹12,500 | 177 ₹4,425 Lowest | 3,260 ₹81,500 | 2,000 ₹50,000 | 2,950 ₹73,750 |
| 9.00 | M&L for water proofing treatment to sunken slab/sanitary fitting area including demolition upto existing RCC slab complete all as specified and directed.comprises the following operations/stage:-
(a) The surface shall be rendered clean prior to application of coating. Mechanical grinding of the surface shall be done so that it is free of dust, debris and oil deposits.
(b) Removing all loose material, like cement slurry, mortar, plaster and other unwanted particles, which may prove hurdle between chemical and concrete bond.
(c) Cleaning the surface with soft brush to make it clean and dust free.
(d) Providing and laying of a 75 x 75 mm coving with polymer modified mortar at floor wall joints wherever necessary.
(e) Providing and applying 1 coat of Asian Paints Smartcare Repair Polymer mixed with cement in ratio of 1: 2 over the entire clean and prepared surface as a sealer coat.
(f) Supplying and applying two component Asian Paints Smartcare Ultra Block 2k acrylic polymer modified high performance coating system, brush applied, membrane with an elongation of >220% and tensile strength of 1.72 MPa as per ASTM D 2370:2016, crack bridging ability of 3 mm as per EN 1062-7:2004, no leakage up to 5 bars of water pressure. The system includes final base preparation, applying the coating in two coats with a total consumption of 2.25kg/sqm.
(g) Providing and laying 25 mm thick cement sand plaster admixed with integral water proofing compound @ 200 ml per bag of cement (1 Cement: 4 Sand) followed by neat cement punning.
(h) Water testing (pond test) shall be carried out for 48 hrs.
(j) After pond test filling minimum 25 cms of sunken portion using khangar/broken aac blocks but not rubble or upto desired height for 75 cm PCC and tiling work shall be filled in layers upto desired satisfaction of Engr-in charge
(k) The rate of water proofing compound is deemed to be included in quoted rates | 300 | Sqm | 485 ₹1,45,500 | 820.8 ₹2,46,240 | 370 ₹1,11,000 Lowest | 777 ₹2,33,100 | 460 ₹1,38,000 | 900 ₹2,70,000 | 550 ₹1,65,000 |
| 10.00 | M&L for brick work straight or curved on plan exc 6m mean radius in cement mortar (1:4) with Sub class ‘B’ brick including manhole raising, drains, septic tanks footpath, boundary wall etc complete all as specified and as directed by Engineer-in-Charge. | 5 | Cum | 3,850 ₹19,250 | 4,446 ₹22,230 | 400 ₹2,000 Lowest | 3,277 ₹16,385 | 3,600 ₹18,000 | 3,300 ₹16,500 | 3,000 ₹15,000 |
Tender Value
₹39.6 L
EMD Value
₹79,150
Closing Date
13 Jun 2026, 6:00 pmClosed
GE (EAST) DELHI CANTT-10
GE (EAST) DELHI CANTT-10
SPL REPAIR OF EIGHT BATHROOMS IN BLDG NO P-168 AND P-169 OTM OF 512 LIGHT AD MSL REGT (SP) UNDER GE (EAST) DELHI CANTT-10
2026_MES_767488_1
GE/DE-54/2026-27
Open Tender
Civil Works
Item Rate
120 days
GE (EAST) DELHI CANTT-10
As per NIT Documents
9 documents required · 9 mandatory
₹500
GE (EAST) DELHI CANTT-10
₹79,150
Yes
12 Aug 2026
23 May 2026
15 Jun 2026
23 May 2026
13 Jun 2026
6 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Concrete in ground floors and pavings in any desciption and in any position complete all as specified and directed | 7 | Cum | 1.25 | ₹8.75 |
| 2 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and directed by Engineer-in-Charge. | 5 | Cum | - | - |
| 3 | Taking down Chowkhats or frames of door/windows exc 1.5 sqm but not exc 4 sqm each (without taking off shutters from the frame) complete all as specified and directed by Engineer-in-Charge. | 64 | Each | 1 | ₹64 |
| 4 | Taking down Chowkhats or frames of door/windows not exc 1.5 sqm each (without taking off shutters from the frame) complete all as specified and directed by Engineer-in-Charge. | 64 | Each | 2 | ₹128 |
| 5 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed by Engineer-in-Charge. | 1,100 | Sqm | 3 | ₹3,300 |
| 6 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc. | 250 | Sqm | 10 | ₹2,500 |
| 7 | Removal of demolished material /Debris beyond upto 5 kms including loading, unloading and stacking at the destination | 12 | Cum | 22 | ₹264 |
| 8 | M&L for PCC 1:5:10 type C-2 (using 40 mm graded Aggregate) as in sunkern floor upto floor level, fdn, mass concrete, sub base of floors etc all as specified and directed | 25 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
NIT54.pdf
Tender Documents • 0.23 MB
BOQ_859523.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .