Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical admitted |
| 2 | Accepted-Technical | Accepted-Technical admitted |
| 3 | Accepted-Technical IGOO | Accepted-Technical admitted |
Tender Value
₹43.3 L
EMD Value
₹1.0 L
Closing Date
14 Feb 2026, 3:20 pmClosed
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Channelization of main Tokpo Kanji (Under Capex)
2026_PWD_18438_1
101 of I and FC Division Leh 2025-26
Open Tender
Civil Works - Canal
Percentage
90 days
LEH
Please refer to tender document
3 documents required · 3 mandatory
₹1,000
Payable To Executive Engineer InFC division Leh
₹1.0 L
18 Feb 2026
14 Feb 2026
18 Feb 2026
14 Feb 2026
14 Feb 2026
14 Feb 2026
Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. a)All kinds of soil:-90%
b)Ordinary rock:-10%
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 gradedstone aggregate 40 mm nominal size derived from natural sources)
Dumping stone excluding cost of stones.in Horizontal on level
Centering and shuttering including strutting, propping etc. and removal of form work for :Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Carriage of material including loading unloading stacking complete job by mechanical transport a)Cement an avg lead 50Km
b)Sand an avg lead 50Km
c)Stone agg an avg lead 50Km
Carriage of material including loading unloading stacking complete job by Head load. a)Cement an avg lead 50Mtrs
b)Sand an avg lead 50Mtrs
c)Stone agg an avg lead 50Km
d)Stone an avg lead 50Mtrs
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_44333.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .