Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC M S PRITPAL ENTERPRISES S C O NO 43 IST FLOOR SECTOR 41D CHANDIGARH | ₹3.4 L | L1 | Accepted-AOC Due to lower rates |
| 2 | L2₹3.5 L+₹7,283.60 (2.13%)Rejected-Finance | ₹3.5 L+₹7,283.60 (2.13%) | L2 | Rejected-Finance Due to higher rates |
| 3 | L3₹3.6 L+₹19,650 (5.74%)Rejected-Finance 697 SECTOR 43A CHANDIGARH CHANDIGARH 160043 | CHANDIGARH | CHANDIGARH | 160043 | ₹3.6 L+₹19,650 (5.74%) | L3 | Rejected-Finance Due to higher rates |
| 4 | L4₹3.9 L+₹46,269.20 (13.5%)Rejected-Finance 1090 GROUND FLOOR SECTOR 18 C CHANDIGARH | ₹3.9 L+₹46,269.20 (13.5%) | L4 | Rejected-Finance Due to higher rates |
| 5 | L5₹4.1 L+₹66,286 (19.4%)Rejected-Finance SHOP NO 1951 4 NEAR SAINI GURUDWARA OPP SECTOR 45 B BURAIL CHANDIGARH | NA | NA | 160001 | ₹4.1 L+₹66,286 (19.4%) | L5 | Rejected-Finance Due to higher rates |
Tender Value
₹5.2 L
EMD Value
₹10,480
Closing Date
25 Jun 2026, 11:00 amClosed
EEPH Divn No. 3 Chd
EEPH Divn No. 3 Chd
Repair and mtc. of Air Conditioners (Split, Pillar and Cassettee Type) installed in various Non Residential Building in Sector 17 including ISBT Sector 17, Sub Registrar Office, Excise Office, CID Office (under mtc. booth Sector 16) Chandigarh. (Ch.
2026_CHD_93457_1
PH3/2026/279
Open Tender
Public Health Products
Percentage
60 days
Chandigarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,480
20 Jul 2026
19 Jun 2026
25 Jun 2026
19 Jun 2026
25 Jun 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Servicing and cleaning of split /slimpack/ cassetle Tpe AC with the help of a jet Pump Complate in all respect | |||||
| 1.1 | Split Type AC | 15 | Each | 450 | ₹6,750 |
| 1.2 | Pillar/Cassettee type AC | 2 | Each | 700 | ₹1,400 |
| 2Replacement of Rotary / Scroll Compressor including Gas charging , welding ,Testing and refiling at site complete in all respects. | |||||
| 2.1 | 1.5 TR Compressor | 10 | Each | 12,000 | ₹1,20,000 |
| 2.2 | 2 TR Compressor | 5 | Each | 14,500 | ₹72,500 |
| 3Supplying & filling of Refrigerant in Various AC complete in all respets including change of filter , capilary and flushing with nitrogen, including rectifying the defect for leakage complete | |||||
| 3.1 | Window/Split Type AC ( 2.0 TR) | 20 | Each | 2,500 | ₹50,000 |
| 3.2 | Pillar/Casettee Type AC ( 4.5 TR) | 15 | Each | 4,000 | ₹60,000 |
| 3.3 | Water Coolers | 5 | Each | 2,700 | ₹13,500 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.56 MB
BOQ_114430.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .