Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-AOC VPO BARDU CHAINA TEHSIL LOHARU DISTT BHIWANI 2023R12021 | BHIWANI | BHIWANI | HARYANA | L1 | Accepted-AOC L1 | |
| 2 | L2₹24.4 L+₹5.5 L (29.2%)Rejected-AOC 62 BALSAMAND ROAD HISAR 125001 | HISAR | HARYANA | 125001 | L2 | Rejected-AOC L2 | |
| 3 | L3₹27.6 L+₹8.7 L (45.8%)Rejected-AOC 10 RUPANA ROAD 127046 | L3 | Rejected-AOC L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Affidavit of 10 rs name of work notery attasted not attched workshop for electrical work experiene of oandm of one year not attched labour lisence avarage turnoverfinancial not attached all these documents not attached | |
| 5 | Rejected-Technical | - | Rejected-Technical Affadavit of 10 rs notery attested not attched workshop for electrical exeperience of oand m one year not attched avarage finacial turnover not attached |
| Sl No | Description | Qty | Unit | The Siwani Sadhbhawna Co op LC Society Ltd L3 | JAGBIR CONTRACTOR L1 | Krishan Kumar Contractor L2 |
|---|---|---|---|---|---|---|
| 1.00 | Water Works, Boosting station :- Maintenance of Horizontal pumping set for Raw water/ Clear water consisting maintenance of motor, pump, starter, cable, panel boards etc inside/outside campus complete in all respects (upto 20 BHP) (Rate to be Quoted by agency as per BHP per Month for the period of 12 months w.e.f. date of commencement) | 8,832 | Per BHP | 175 ₹15,45,600 | 120 ₹10,59,840 Lowest | 155 ₹13,68,960 |
| 2.00 | Water Works, Boosting Station and Pump House:- Maintance of Submersible pumping set for raw water/clear water consisting maintenance of motor, pump, starter, cable, panel boards etc inside/outside campus complete in all respects (upto 20 BHP) (Rate to be Quoted by agency as per BHP per Month for the period of 12 months w.e.f. date of commencement). | 6,930 | Per BHP | 175 ₹12,12,750 | 120 ₹8,31,600 Lowest | 155 ₹10,74,150 |
Tender Value
₹19.2 L
EMD Value
₹38,460
Closing Date
29 Jul 2025, 5:00 pmClosed
KAPIL DEV
Siwani PHED
Maintenance of Pumping Machinery Raw water clear water tube wells of Sub Division No1 Loharu
2025_HRY_460553_1
2025B60CF295 8A62 4037 9196 D3BABE083E3A552PUH
Open Tender
Civil Works
Works
365 days
KURDAL DHIGAWA SHAMYAN
Maintenance of Pumping Machinery Raw water clear water tube wells of Sub Division No1 Loharu
3 documents required · 3 mandatory
₹1,000
₹38,460
Yes
9 Sept 2025
23 Jul 2025
30 Jul 2025
23 Jul 2025
29 Jul 2025
23 Jul 2025
23 Jul 2025 - 29 Jul 2025
Amount
Water Works, Boosting station :- Maintenance of Horizontal pumping set for Raw water/ Clear water consisting maintenance of motor, pump, starter, cable, panel boards etc inside/outside campus complete in all respects (upto 20 BHP) (Rate to be Quoted by agency as per BHP per Month for the period of 12 months w.e.f. date of commencement)
Water Works, Boosting Station and Pump House:- Maintance of Submersible pumping set for raw water/clear water consisting maintenance of motor, pump, starter, cable, panel boards etc inside/outside campus complete in all respects (upto 20 BHP) (Rate to be Quoted by agency as per BHP per Month for the period of 12 months w.e.f. date of commencement).
Krishan Kumar Contractor (BID ID -1304180)
The Siwani Sadhbhawna Co op LC Society Ltd (BID ID -1305451)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .