Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | L1 | Accepted-AOC TCR | |
| 2 | L2₹1.1 L+₹5,369 (5.10%)Rejected-Finance | L2 | Rejected-Finance TCR |
| Sl No | Description | Qty | Unit | UNITED ENGINEERING ENTERPRISE L1 | GT ENTERPRISE L2 |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||
| 2.00 | seamless steam pipe (Rs. 1600 P/mt) Cost of 2" | 6 | mtr | 1,650 ₹9,900 Lowest | 1,700 ₹10,200 |
| 3.00 | seamless flange (Rs. 700/each) Cost of | 8 | Nos | 800 ₹6,400 Lowest | 900 ₹7,200 |
| 4.00 | Cost of 2" seamless bend (Rs. 800/each) Cost of 2" | 2 | Nos | 900 ₹1,800 Lowest | 920 ₹1,840 |
| 5.00 | Cost of 2" steam stop valve (Rs. 9800/each) Labour | 1 | Nos | 10,500 ₹10,500 Lowest | 10,600 ₹10,600 |
| 6.00 | charges for changing of damaged portion of feed pipe with fitting of flange, bend and valve (Rs. 800 P/mt) | 6 | mtr | 800 ₹4,800 Lowest | 820 ₹4,920 |
| 7.00 | Cocking of leaky rivets of boiler front plate at bottom side of L/Boiler at V.K. Unit (Rs. 650/E) | 12 | Nos | 700 ₹8,400 Lowest | 720 ₹8,640 |
| 8.00 | To buildup the damage portion of boiler shell plate below the site inspection door at NKJ unit of vertical boiler. (Rs. 2000/each) | 9 | Nos | 2,500 ₹22,500 Lowest | 2,600 ₹23,400 |
| 9.00 | Labor Charges for changing of 1 1/2" blow down pipe line of both the vertical boiler of NKJ unit (Rs. 600 P/mt) | 12 | mtr | 700 ₹8,400 Lowest | 710 ₹8,520 |
| 10.00 | Cost of 1 1/2" flange (Rs. 550/each) | 4 | Nos | 600 ₹2,400 Lowest | 700 ₹2,800 |
Tender Value
₹1.1 L
EMD Value
₹1,400
Closing Date
9 Sept 2025, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Repairing of Boiler and pipe line at VK unit of Khandra Colliery.
2025_ECL_342386_1
ECL/GM/BA/E TENDER/25-26/ENM/93 Dt 25.08.2025
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Khandra Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹1,400
5 Jan 2026
25 Aug 2025
10 Sept 2025
25 Aug 2025
9 Sept 2025
25 Aug 2025
25 Aug 2025 - 1 Sept 2025
Amount
Item Description/ Heading
seamless steam pipe (Rs. 1600 P/mt) Cost of 2"
seamless flange (Rs. 700/each) Cost of
Cost of 2" seamless bend (Rs. 800/each) Cost of 2"
Cost of 2" steam stop valve (Rs. 9800/each) Labour
charges for changing of damaged portion of feed pipe with fitting of flange, bend and valve (Rs. 800 P/mt)
Cocking of leaky rivets of boiler front plate at bottom side of L/Boiler at V.K. Unit (Rs. 650/E)
To buildup the damage portion of boiler shell plate below the site inspection door at NKJ unit of vertical boiler. (Rs. 2000/each)
Labor Charges for changing of 1 1/2" blow down pipe line of both the vertical boiler of NKJ unit (Rs. 600 P/mt)
Cost of 1 1/2" flange (Rs. 550/each)
Cost of 1 1/2" seamless bend (Rs. 450/each)
Changing of 4" leaky flange joint of stem line with gasket, nuts and bolts etc (Rs. 1200 each)
Cost of DA & Oxygen
Total impact of GST for the purpose of CTC
GT ENTERPRISE (BID ID -1180659)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .