Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.8 L+₹21,697.18 (13.8%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.8 L+₹24,658.55 (15.7%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹1.9 L+₹31,930.04 (20.3%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,860
Closing Date
27 May 2026, 4:00 pmClosed
XEN REW Kathua
xenrew
Constt. of lane drain moh. bhushan kumar tilak raj ganesh dutt and others at new colony kootah near kootah morh
2026_RDPR_310533_2
e-NIT No.33/REW/K of 2026-27 Dated 21/05/2026 2nd call
Open Tender
Civil Works
Percentage
30 days
Hiranagar
sbd
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹5,860
6 Jun 2026
21 May 2026
28 May 2026
21 May 2026
27 May 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth: All kinds of soil | 19.43 | cum | 479.3 | ₹9,312.8 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 17.49 | cum | 218.4 | ₹3,819.82 |
| 3 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 39.65 | sqm | 24.12 | ₹956.36 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 13.88 | cum | 4,826.5 | ₹66,991.82 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level in 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) | 11.89 | cum | 5,733.6 | ₹68,172.5 |
| 6 | Centering and shuttering incl. strutting, propping etc. and removal of form for : | - | - | - | - |
| 7 | Foundations, footings bases of columns etc. | 52.04 | sqm | 286.35 | ₹14,901.65 |
| 8 | 40 mm thick bed (1:2:4) flooring using 20 mm n-size stone agg. & curing complete. | 9.76 | sqm | 510.25 | ₹4,980.04 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.02 | cum | 7,788.4 | ₹7,944.17 |
| 10 | Reinforcement of R.C.C work, incl. straightening, cutting, bending, placing in position and binding all complete | 76.47 | kg | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.96 MB
BOQ_1004456.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .