| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.0 LAccepted-AOC | ₹4.0 L | 1 | Accepted-AOC work order |
| 2 | 2₹4.0 LRejected-Finance | ₹4.0 L | 2 | Rejected-Finance higest |
| Sl No | Description | Qty | Unit | M.Govindaraju L2 | OM SAKTHI CONSTRUCIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 2.21 | cum | 265 ₹585.65 | 263 ₹581.23 |
| 2.00 | Filling the foundation and basement with good river sand including cost and conveyance of sand from approved source and including all labour charges etc complete | 0.45 | cum | 2,380 ₹1,071 | 2,370 ₹1,066.50 |
| 3.00 | Cement concrete 1:4:8 mix Using 40 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed. | 0.45 | cum | 6,250 ₹2,812.50 | 6,209 ₹2,794.05 |
| 4.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Rate for 10m3 | 4.35 | cum | 6,300 ₹27,405 | 6,275 ₹27,296.25 |
| 5.00 | Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29 m height for plane surfaces etc. complete complying with standard specification and as directed by the department officer. | 10.38 | sqm | 550 ₹5,709 | 547 ₹5,677.86 |
| 6.00 | Supplying & Fabrication of steel including all labour charges etc complete.. | 0.21 | QTL | 91,917 ₹19,302.57 | 91,917 ₹19,302.57 |
| 7.00 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3 | 2.09 | cum | 10,000 ₹20,900 | 9,947 ₹20,789.23 |
| 8.00 | Providing Granolethic Floor finish in cement concrete 1:2:4 mix using 1:2:4 mix using 10-12mm ISS met5al to 25mm thick including cost and conveyance of all materials to site | 0.12 | sqm | 7,500 ₹900 | 7,177 ₹861.24 |
| 9.00 | Plastering with cement mortor 1:3 using 10mm thickness including all labour charges etc., complete with standard specification | 15.01 | sqm | 310 ₹4,653.10 | 310 ₹4,653.10 |
| 10.00 | Plastering with cement mortor 1:5 using 12mm thickness including all labour charges etc., complete with standard specification | 26.95 | sqm | 291 ₹7,842.45 | 291 ₹7,842.45 |
Tender Value
Refer Docs
EMD Value
₹4,100
Closing Date
3 Mar 2026, 4:00 pmClosed
block development officer
panchayat union parangipettai
Drilling of Bore well and Construction of pump room at Manikollai panchayat
2026_RDTN_666792_1
A3/813/2023
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
panchayat union parangipettai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,100
Yes
5 Mar 2026
26 Feb 2026
3 Mar 2026
26 Feb 2026
3 Mar 2026
26 Feb 2026
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Filling the foundation and basement with good river sand including cost and conveyance of sand from approved source and including all labour charges etc complete
Cement concrete 1:4:8 mix Using 40 mm ISS HBG metal inculding cost and conveyance of all materails to site including all labour charges completed.
Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Rate for 10m3
Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29 m height for plane surfaces etc. complete complying with standard specification and as directed by the department officer.
Supplying & Fabrication of steel including all labour charges etc complete..
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering, shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Rate for 10m3
Providing Granolethic Floor finish in cement concrete 1:2:4 mix using 1:2:4 mix using 10-12mm ISS met5al to 25mm thick including cost and conveyance of all materials to site
Plastering with cement mortor 1:3 using 10mm thickness including all labour charges etc., complete with standard specification
Plastering with cement mortor 1:5 using 12mm thickness including all labour charges etc., complete with standard specification
Painting two coats Emulsion paint over cement plastered wall including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Towards Cost of Door Including of All labour charges etc completed
Earth Excavation and depositing on bank for with an initial lead and lift in all type soil for pipe line for 75mm dia pipe
Supply of unlasticised 75mm OD PVC/4ksc rigid Pipes as per BIS 4985/2000 with ISI Marking to site of works
a) 75mm End cup 1 x 9
b) 75mm Tee
c) 75mm elbow
Lowering and Laying of the 75mm dia PVC pipes and secials to trench ,laying to proper grade and alignment,jointing with PVC coupler and specials fixing with solvent cement paste etc., complete
Re-filling with excavated soil complying with standard specification in layers of 15cm thick well rammed and consolidated after ipes and specials are laid and tested
PVC Adhesive for pipe fixing Work
Drilling of borewells of size 150mm to 200mm dia. in sedimentary formation using hand boreset including insertion of casing pipe etc., and supplying and packing of pebbles (Conveyance of hand bore set including loading and unloading to be done by the contractor
Supply Delivery of Following Materials For Drilling of hand bore set including cost of Drilling Work and all Labour Charge etc Complete 110mm OD P V C Pipe for borewell special blue SOR 2023-24 Page 104
110mm OD P V C special blue pipe slotted SOR 2023-24 Page 111
63mm OD P V C Pipe for horizontal connection SOR 2023-24 Page 104
50mm OD P V C Pipe for suction SOR 2023-24 Page 104
200mm OD P V C Pipe of 6ksc For Dummy
63mm OD PVC Tee
63mm OD PVC Elbow
63mm X 50mm OD PVC Reducer
63mm OD PVC Tee
63mm OD PVC MTA
63mm X 50mm GI X nipple
50mm GI bend
50mm GI Coupling
50mm GI nipple
50mm GI flange set
32mm GI bend
32mm GI Coupling
100mm X 50mm GI Reducer
50mm GI Pipe
Non return Valve of size 63mm dia
Nylon Mesh
Solvent cement
2.0 HP Monoblock Pump
Provision for Name Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_800999.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Documents.pdf
Tender Documents • 0.29 MB
BOQ_800999.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid