| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 CrAccepted-AOC 244 22 ONKAR NAGAR B TRI NAGAR TRI NAGAR NEW DELHI 110035 NORTH WEST DELHI DELHI 110035 INDIA | NORTH WEST DELHI | DELHI | 110035 | ₹8.8 Cr | L1 | Accepted-AOC Being Lowest Bidder |
| 2 | L2₹9.1 Cr+₹33.6 L (3.81%)Rejected-Finance | ₹9.1 Cr+₹33.6 L (3.81%) | L2 | Rejected-Finance Not being lowest |
| 3 | L3₹9.3 Cr+₹47.9 L (5.44%)Rejected-Finance | ₹9.3 Cr+₹47.9 L (5.44%) | L3 | Rejected-Finance Not being lowest |
| 4 | L4₹9.8 Cr+₹99.9 L (11.3%)Rejected-Finance 183 MG ROAD JUNGLIGHAT PORT BLAIR 744103 | PORT BLAIR | SOUTH ANDAMANS | ANDAMAN NICOBAR ISLANDS | 744103 | ₹9.8 Cr+₹99.9 L (11.3%) | L4 | Rejected-Finance Not being lowest |
| 5 | L5₹10.0 Cr+₹1.2 Cr (13.5%)Rejected-Finance | ₹10.0 Cr+₹1.2 Cr (13.5%) | L5 | Rejected-Finance Not being lowest |
| Sl No | Description | Qty | Unit | NIRMAL SALES CORPORATION L1 | surendra infrastructure pvt ltd L7 | DNS CONSTRUCTION COMPANY L3 | D R STEEL CONSTRUCTION COMPANY PRIVATE LIMITED L6 | Hindustan Traders L4 | SWADESHI CONSTRUCTION CO L2 | M/S GHOSH CONSTRUCTION L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00NOTE (Applicable for all items) :- (i) The bidders/contractors are advised to read tender document & all corrigendum / amendments and General conditions of contracts before entrying/quoting the rates. 2. It is highlighted that the certain condition of General Condition of Contracts (IAFW-2249) has been modified as per direction of MoD i.e. inclusssion of Performance Security, deletion of Risk & Cost Provisions and increase in defect liability period all as per tender documents. The tenderers should keep in mind while quoting their offer. | ||||||||||
| 1.01 | Demolition of brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and directed | 3,995.69 | Cum | 1,291 ₹51,58,435.79 | 720 ₹28,76,896.8 | 940 ₹37,55,948.6 | 595 ₹23,77,435.55 | 500 ₹19,97,845 Lowest | 900 ₹35,96,121 | 1,450.2 ₹57,94,549.64 |
| 2.00 | Dismantling of Structural Steel Work including Doors, Gates but excluding Framed Truss etc. complete all as specified and as directed. | 2 | Qtl | 850 ₹1,700 | 650 ₹1,300 | 600 ₹1,200 | 1,678.18 ₹3,356.36 | 550 ₹1,100 | 500 ₹1,000 Lowest | 4,500.1 ₹9,000.2 |
| 3.00 | Dismentling of posts or struts (wood,steel,or RCC) any section ,including taking out embedded portion and making good disturbed concrete, brick work, masonary etc embedded in concrete, complete all as spd and as directed. | 3,080.4 | Rm | 55 ₹1,69,422 | 230 ₹7,08,492 | 35 ₹1,07,814 | 175 ₹5,39,070 | 5 ₹15,402 Lowest | 25 ₹77,010 | 60.1 ₹1,85,132.04 |
| 4.00 | Demolition of stone slabs and tiles of any description or thick ness in floors /verticle surfaces etc laid , bedded and pointed in any mortar ,etc complete all as specified and directed by engr-in-charge. | 10 | 10 Sqm | 350 ₹3,500 | 435 ₹4,350 | 300 ₹3,000 | 665 ₹6,650 | 1,000 ₹10,000 | 250 ₹2,500 Lowest | 1,475 ₹14,750 |
| 5.00 | Dismantling wrought iron or mild steel work of any description not other wise provided ( barbed wire/Concertina coil) complete all as directed. | 66.63 | Quintal | 510 ₹33,981.3 | 650 ₹43,309.5 | 600 ₹39,978 | 595 ₹39,644.85 | 550 ₹36,646.5 | 500 ₹33,315 Lowest | 574.9 ₹38,305.59 |
| 6.00 | Demolition of cement concrete (reinforced) of any description and in any position not otherwise specifically provided for, all as specified and as directed by the Engineer-in-Charge. | 10 | Cum | 2,400 ₹24,000 | 650 ₹6,500 Lowest | 2,000 ₹20,000 | 17,725 ₹1,77,250 | 1,000 ₹10,000 | 1,500 ₹15,000 | 2,883.7 ₹28,837 |
| 7.00 | Excavation in trenches n.exc 1.5 m wide and n.exc 1.5 m in depth, n exc 10 sqm on plan and n exc 1.5m in depth for foundation and getting out in soft/loose soil all as specified and directed. | 3,804.84 | Cum | 210 ₹7,99,016.4 | 245 ₹9,32,185.8 | 195 ₹7,41,943.8 | 112 ₹4,26,142.08 Lowest | 200 ₹7,60,968 | 182 ₹6,92,480.88 | 283.7 ₹10,79,433.11 |
| 8.00 | Excavation in trenches n.exc 1.5 m wide and exc 1.5 m in depth and n.exc 3.0 m in depth , n exc 10 sqm on plan and n exc 1.5m in depth for foundation and getting out in soft/loose soil all as specified and directed. | 1.32 | Cum | 460 ₹607.2 | 272 ₹359.04 | 300 ₹396 | 175 ₹231 Lowest | 500 ₹660 | 210 ₹277.2 | 850 ₹1,122 |
| 9.00 | Material and labour for PCC 1:4:8 type D2 using 40mm graded stone aggregate as in foundation (using 40 mm graded granite stone aggregate) as in foundation etc complete all as specified and directed. | 398.7 | Cum | 5,679 ₹22,64,217.3 | 5,950 ₹23,72,265 | 5,300 ₹21,13,110 Lowest | 8,088 ₹32,24,685.6 | 6,000 ₹23,92,200 | 5,750 ₹22,92,525 | 5,483.1 ₹21,86,111.97 |
Tender Value
₹11.5 Cr
EMD Value
₹9 L
Closing Date
10 Oct 2025, 6:00 pmClosed
Shri Somesh Kumar IDSE CE
HQ CHIEF ENGINEER KOLKATA ZONE MILITARY ENGINEER SERVICES BALLYGUNGE MAIDAN CAMP GURUSADAY ROAD KOLKATA 700019
ADDN ALTN TO PERIMETER SECURITY WALL WITH CONCERTINA COIL ON TOP AT FORT WILLIAM UNDER GE FW KOLKATA
2025_MES_730445_1
89109/E8
Open Tender
Civil Works
Item Rate
540 days
GE (FW) KOLKATA
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹3,000
GE (FW) KOLKATA
₹9 L
Yes
HQ CHIEF ENGINEER KOLKATA ZONE
24 Dec 2025
11 Sept 2025
17 Oct 2025
11 Sept 2025
10 Oct 2025
3 Oct 2025
18 Sept 2025
Amount
NOTE (Applicable for all items) :- (i) The bidders/contractors are advised to read tender document & all corrigendum / amendments and General conditions of contracts before entrying/quoting the rates. 2. It is highlighted that the certain condition of General Condition of Contracts (IAFW-2249) has been modified as per direction of MoD i.e. inclusssion of Performance Security, deletion of Risk & Cost Provisions and increase in defect liability period all as per tender documents. The tenderers should keep in mind while quoting their offer.
Demolition of brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and directed
Dismantling of Structural Steel Work including Doors, Gates but excluding Framed Truss etc. complete all as specified and as directed.
Dismentling of posts or struts (wood,steel,or RCC) any section ,including taking out embedded portion and making good disturbed concrete, brick work, masonary etc embedded in concrete, complete all as spd and as directed.
Demolition of stone slabs and tiles of any description or thick ness in floors /verticle surfaces etc laid , bedded and pointed in any mortar ,etc complete all as specified and directed by engr-in-charge.
Dismantling wrought iron or mild steel work of any description not other wise provided ( barbed wire/Concertina coil) complete all as directed.
Demolition of cement concrete (reinforced) of any description and in any position not otherwise specifically provided for, all as specified and as directed by the Engineer-in-Charge.
Excavation in trenches n.exc 1.5 m wide and n.exc 1.5 m in depth, n exc 10 sqm on plan and n exc 1.5m in depth for foundation and getting out in soft/loose soil all as specified and directed.
Excavation in trenches n.exc 1.5 m wide and exc 1.5 m in depth and n.exc 3.0 m in depth , n exc 10 sqm on plan and n exc 1.5m in depth for foundation and getting out in soft/loose soil all as specified and directed.
Material and labour for PCC 1:4:8 type D2 using 40mm graded stone aggregate as in foundation (using 40 mm graded granite stone aggregate) as in foundation etc complete all as specified and directed.
Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in any type of soil all as specified and directed.
Removing of excavated material exc. 1.50 km but n exc. 5 km and deposited where dircted at a level n.exc 1.5 m above the starting point complete all as specified and directed.
Removing of excavated material exc. 250 m but n exc. 500 m and deposited where dircted at a level n.exc 1.5 m above the starting point complete all as specified and directed.
Material and labour for RCC M-25 (20mm graded aggregate) as in Foundations, including rafts, footings, foundation beams; plinth beams etc basement slabs, under rammed piles and mass concrete complete all as specified and directed.
Material and labour for RCC M-25 (20mm graded aggregate) as in wall ,retaining wall, and like any thickness above top of footing , including att pilsters and buttresses complete all as specified and as directed.
Material and labour for RCC M-25 (20mm graded aggregate) as in column, pillars, piers, posts and struts complete all as specifed and directed.
Matreial and labour for RCC M-25 (20mm graded aggregate) as in lintal beam / top beam complete all as specifed and as directed.
Formwork to sides of pillars, posts, struts, piers, columns and stanchions for rough finish surfaces all as specifeid and directed.
Formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams;roof beam and similar work; vertical or to batter for rough finish surfaces complete all as specified .
Formwork to face of wall, retaning wall and similar work including att pillaster etc vertical or to batter for rough finished surfacs all as specifeid and directed.
Formwork to edged of concrete flats, opening of concrete wall n exc 20 cm wide and side if RCC band in wall horizontal and sloping and similat work exc 10 cm but n exc 20 cm wide all as specifeid and directed.
Material and labour for TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specifeid and directed.
Material and labour for TMT bars but 5mm dia and over up to and including 10mm dia in stirrups, spacers and binders, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specifeid and directed.
M&L for rendering 5mm thick on fair faces of brick work or concrete wall surfaces in CM 1:4 finished rendering is to be finished even and smooth without using extra cement complete all as specified and directed
S&F Mild steel work as in post and struts in fencing including cutting tops to shape as diredcted,drilling holes, notching for wire,etc ,flat iron fillets for securing wire mesh etc,including all necessary drilling,bolting or riveting,etc and similar work conforming to Fe 290 Gde E-165 complete all as specified & directed. Note :- Y shaped angle shall be embeded above wall during casting of column RCC M-25 without any price adjustment as indicated drawing
S&F in Galvanised 2 strand, steel barbed wire 2.24 mm dia barbed with 2mm dia bars at 75mm spacing and straining and fixing to any type of standard rails straining bolts, including securing or tying at crossing with and provision of galvanised mild steel wire staples or steel pins etc complete all as directed by Engr-in- Chage.
S&F 750mm dia Concertina coil, super razor punched barb tape (SRBT) aluminium base helix coil with and including necessary GI fixing clips for securing complete all as specified and as directed with following specification:- (i) Dia of Coil (when unstretched) - 750mm (ii) No of circles 50 turns per coil. (iii) Weight of each coil with hessian pack 10.00 kg (+ 0.5) (iv) 8 spirals per Running Meter (v) Central core wire :- Made from 2.50 mm dia GI-H.T.S.S wire as per IS-4454 galvanised as per IS-2629. (vi) Razor Punched Strip :- Razor punched tape is Steel comprising of Aluminium base with Zinc alloy @ 150 gm/m2 conforming to ASTM A-792/A-792M with additional primer treatment of Epoxy/ Polyurethane & Final Paint top coat of approved shade by Hot dipping process. Note :- Running length of the wall shall be measured for payment purpose.
Supply and fixing rolled mild steel in framed work as in doors or gates of angle or other section with gusset plates, rails, braces, etc, complete, drilled for fixing of steel sheeting or other covering, door, etc to be prepared for hanging or sliding with and including either hooks and hinges or steel hanging door fittings (exclusive of steel sheetings or other covering, running rails and guides) and hanging also fastening and fixing complete all as specified and as directed.
Supply and fixing bands, straps, supports or strays for rainwater, ventilating pipes, including bolts, if required: hooks (stay), heavy, for large gates ; hook and pintle hinges; large hasps and staples ; chains; hand made sliding bolts; clamps; hold fasts; wall ties; hooks for hanging fans; plain angle cleats for securing purlin to wood trusses or rafters; knee pieces inserts ; two way and three way straps, plate washers and similar small articles confirming to Fe- 290 Gde-E-1465 complete all as specified and as directed.
M&L for new steel and iron surfaces apply two coats of synthetic enamel paint over one coat of red oxide of any description, over 10cm in width or girth,not otherwise described complete all as specified and directed.
S&F for Framed work such as grills, gratings, etc.. with ends of bars shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks and similar work conforming to Fe.290.Gde-E-165 all as specified and directed.
Material and labour for rendering 15mm thick in cement mortar (1:4) on concrete surfaces and finishing even and smooth without using extra cement complete all as specified and as directed.
Material & Labour for applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new surfaces complete all as specified and directed.
Material and labour for 20mm thick coloured granite tiles,machine cut as in skirting , dado , steps, jambs, pillars, window cills and over and includinmg 15mm thick backing layer in cement mortar (1:6) including pointing in white cement (1:2) using marble dust with admixture of pigment to match with shade of granite complete all as specified and as directed.
SWADESHI CONSTRUCTION CO (BID ID -3447754)
DNS CONSTRUCTION COMPANY (BID ID -3447264)
Hindustan Traders (BID ID -3447297)
M/S GHOSH CONSTRUCTION (BID ID -3446994)
D R STEEL CONSTRUCTION COMPANY PRIVATE LIMITED (BID ID -3447267)
surendra infrastructure pvt ltd (BID ID -3446973)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_817754.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .