Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹51,730Admitted-Fee/PreQual/Technical/Finance | -26.10% | ₹51,730 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹54,215+₹2,485 (4.80%)Admitted-Fee/PreQual/Technical/Finance | -22.55% | ₹54,215+₹2,485 (4.80%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹56,000+₹4,270 (8.25%)Admitted-Fee/PreQual/Technical/Finance ANANTNAG ANANTNAG JAMMU AND KASHMIR | ANANTNAG | JAMMU AND KASHMIR | 192101 | -20.00% | ₹56,000+₹4,270 (8.25%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹59,815+₹8,085 (15.6%)Admitted-Fee/PreQual/Technical/Finance | -14.55% | ₹59,815+₹8,085 (15.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹70,000
EMD Value
₹2,100
Closing Date
20 Jul 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
C/O UPGRADATION OF L/ROAD FROM MAIN ROAD TO H/O AB RASHID BHAT AT SHOUL BLOCK ANANTNAG
2026_RDPR_315725_17
ENIT62of2026-27
Open Tender
Civil Works
Percentage
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹2,100
22 Jul 2026
13 Jul 2026
21 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and stacking of graded stone aggregate at site of size range 63 mm to 45 mm (excluding carriages | 28.1 | CUM | 1,204.15 | ₹33,836.62 |
| - | Supplying and stacking of stone screening at site, 13.2 mm nominal size (Type A) (excluding carriages) | 4.17 | CUM | 1,204.15 | ₹5,021.31 |
| 3 | Supplying and stacking of stone dust/moorum at site (excluding carriages) | 1.94 | CUM | 668.95 | ₹1,297.76 |
| 4 | Laying water bound macadam with specified stone aggregate stone screening and binding material including screening, sorting, spreading to template and consolidation with power road roller of 8 to 10 tonne capacity etc. base course with stone aggregate at site of size range 63 mm to 45 mm including tone screening 13.2 mm size complete | 24 | CUM | 768.95 | ₹18,454.8 |
| 5 | Stone Aggregate from Brakpora for avg. lead 10 kms | 28.1 | CUM | 299.63 | ₹8,419.6 |
| 6 | Stone screening/dust from Mirbazar for avg. lead 15 kms | 6.12 | CUM | 370.18 | ₹2,265.5 |
| 7 | ADD FOR COST OF SIGNBOARD AND PHOTOGRAPHS | - | Each | 0.4 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_1025669.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .