Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.7 LAccepted-AOC 520C MAIN ROAD WARD NO 12 METTU STREET ELAMBALUR PERAMBALUR | PERAMBALUR | PERAMBALUR | TAMIL NADU | 621220 | L1 | Accepted-AOC Lowest Value | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Performance certicate from End User for O&M Related Electrical works up to 22KV [HT/LT works] Award copy not furnished |
Tender Value
Refer Docs
EMD Value
₹24,900
Closing Date
23 Dec 2024, 2:30 pmClosed
SE/SEDC/SALEM
Office of the SE/SEDC/SLM
Works contract in Attur Division
2024_EB_509568_1
SE/SEDC/WC.026/24-25dt.6.12.24
Open Tender
Electrical and Maintenance Works
Works
365 days
Attur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹24,900
28 Mar 2025
10 Dec 2024
24 Dec 2024
11 Dec 2024
23 Dec 2024
11 Dec 2024
Amount
Excavation of Pole/Stay pits
Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual
Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual
Stay pit 4.5' to 5' depth by using JCB or manual
Erection of Poles
PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
PSC/ RCC poles/Metal poles above 8.00m by using JCB or manual
Erection of stay set complete
Fixing of cross ARMS /Insulators/Disc
HT "V" cross arms (all types) / Channel cross arms/ Guarding Cross arms
LT 3 Phase cross arm
LT single Phase cross arm
HT /LT TI Fittings
Fixing of HT Pin Insulators (11/22/33KV)
Fixing of HT 22 KV strain disc.
Fixing of LT Pin Insulators
Fixing of LT Shackle
Fixing of Aluminium Knob
Paving of Conductor, stringing etc., complete with ACSR/ AAAC for both HT/LT lines.
ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
ACSR 7/2.59 mm / AAAC 2.50 mm weasel and ACSR 7/2.11 mm Conductor
Concreting of poles
Mass concreting including materials (Cement + River sand/ sand and Blue metals and watering)
Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)
Loading of materials
Unloading of materials
Below 8 Kms (Plains)
Erection of transformer
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Erection of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
Erection of New Transformer all capacities (with jumpering)
Loading of Transformer upto 100 KVA
Unloading of Transformer upto 100 KVA
Loading and unloading of poles/ Materials etc.
Loading of poles upto 8.0 M/ 27'
Unloading of poles upto 8.0 M/ 27'
Loading of poles above 8.0 M
Unloading of poles above 8.0 M
Transport of Poles road side to pole pit including loading and unloading
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Lathe Works
Labour charges for alteration of Back Clamps/ Stay Clamps to suit for the works
Drilling of hole in channel only 3/4" & 1"
Service Erected
Releasing of single phase service and re-fixing.
Releasing of 3 phase service and (upto 50 HP) re-fixing.
Re-sagging of HT/LT lines
Releasing of ACSR/AAAC conductors from conductor drum and coiling 7/2.59, AAAC 7/2.50, ACSR 7/3.35, 7/3.15 MM
Dismantling of Poles & Materials
Dismantling of pole pit upto 27' (8.0 m) Pole by using JCB or manual
Dismantling HT "V" cross arms (all types) / Channel cross arms/ Guarding Cross arms
Dismantling of LT 3 Phase cross arm
Dismantling of LT 1 Phase cross arm
Dismantling of HT /LT TI Fittings
Dismantling of HT Pin Insulators (11/22/33KV)
Dismantling of LT Pin Insulators
Dismantling of LT Shackle
Dismantling of Aluminium Knob
Dismantling of stay set complete
Dismantling of ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
Dismantling of ACSR 7/2.59 mm / AAAC 2.50 mm weasel and ACSR 7/2.11 mm Conductor
Dismantling of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
Dismantling of branches of trees
Dismantling of coconut leaves (per tree)
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .