Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 LAdmitted-Finance | ₹14.0 L | L1 | Admitted-Finance |
| 2 | L2₹14.6 L+₹57,513.03 (4.11%)Admitted-Finance | ₹14.6 L+₹57,513.03 (4.11%) | L2 | Admitted-Finance |
| 3 | L3₹16.5 L+₹2.5 L (17.8%)Admitted-Finance | ₹16.5 L+₹2.5 L (17.8%) | L3 | Admitted-Finance |
| 4 | L4₹17.2 L+₹3.2 L (22.9%)Admitted-Finance | ₹17.2 L+₹3.2 L (22.9%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Swaraj Infrastructure L4 | ASSAM POWER AND CONSTRUCTION L2 | KONGKON JYOTI BORA L1 | PARAMANANDA BORAH L3 |
|---|---|---|---|---|---|---|---|
| 1.00Deep Well Boring | |||||||
| 1.01 | Preparation of site for placement of the drilling rig
including excavation of mud pit, circulation drain,
collection chamber etc. all complete as directed. | 1 | each DTW | 5,000 ₹5,000 Lowest | 8,126 ₹8,126 | 7,150.88 ₹7,150.88 | 8,126 ₹8,126 |
| 2.01 | Movement of Rig from the Divisional Head
Quarter to the drilling site including cost of P.O.L.
all complete as directed | 50 | per km | 55 ₹2,750 | 29 ₹1,450 | 25.51 ₹1,275.5 Lowest | 29 ₹1,450 |
| 3.01 | Transportation of all ancillary equipments, camp
materials, welding set, rig accessories etc. from
Divisional Head Quarter to worksite to and fro
including cost of P.O.L. all complete as directed.
(a) Upto 100.00 Km distance from Divisional H.Q. | 50 | per km | 50 ₹2,500 | 43.4 ₹2,170 | 38.19 ₹1,909.5 Lowest | 43.4 ₹2,170 |
| 4.01 | Transportation of all store materials like pipes,
strainer, cone, socket, clamp, bentonite etc. from
Divisional Head Quarter to worksite to and fro
including cost of P.O.L. all complete as directed.
(a) Upto 100.00 Km distance from Divisional H.Q | 50 | per km | 50 ₹2,500 | 43.4 ₹2,170 | 38.19 ₹1,909.5 Lowest | 43.4 ₹2,170 |
| 5.01 | Transportation of air compressor from the
Divisional Head Quarter to the drilling site with
all accessories including cost of P.O.L. all
complete as directed.
(a) Upto 100.00 Km distance from Divisional H.Q. | 50 | per km | 45 ₹2,250 | 43.4 ₹2,170 | 38.19 ₹1,909.5 Lowest | 43.4 ₹2,170 |
| 6.01 | Transportation of P.O.L. all complete as directed. | 1,000 | ltr | 15 ₹15,000 | 8.4 ₹8,400 | 7.39 ₹7,390 Lowest | 8.4 ₹8,400 |
| 7.01 | Construction of temporary accommodation and
low cost sanitary facility for drilling staff including
cost of camp materials viz. cots, tables, chairs,
utensils, dresses, safety helmets etc. and
dismantling the accommodation after completion
of the work all complete as directed. | 1 | each DTW | 5,000 ₹5,000 Lowest | 11,000 ₹11,000 | 8,092.47 ₹8,092.47 | 9,196 ₹9,196 |
| 8.01 | Providing water supply facilities at drilling site all
complete as directed.
DEEP TUBE WELL BY ROTARY/DTH/ODEX SYSTEM RIG
(TO BE DONE BY CONTRACTOR / OUTSIDE AGENCY RIG)
(a) By installing 1 Nos. of Singur hand pump | 1 | each DTW | 5,000 ₹5,000 | 10,000 ₹10,000 | 4,730.88 ₹4,730.88 Lowest | 5,376 ₹5,376 |
| 8.02 | (b) By installing 1 No. 5 HP dewatering pump | 1 | each DTW | 5,000 ₹5,000 | 10,000 ₹10,000 | 4,762.55 ₹4,762.55 Lowest | 5,412 ₹5,412 |
Tender Value
₹21.5 L
EMD Value
₹43,020
Closing Date
20 Jul 2026, 12:00 pmClosed
Deputy General Manager
O/o- The DGM, T T Circle, AEGCL, Garmur, Jorhat
Construction and installation of Water Supply and Filtration System for GSS and colony residents at 132kV GSS, AEGCL, Teok
2026_AEGCL_52908_1
AEGCL/DGM/UATTC/OM/2405
Open Tender
Civil Works - Water Works
Item Rate
150 days
132kV GSS, AEGCL, Teok
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,500
₹43,020
10 Aug 2026
30 Jun 2026
21 Jul 2026
30 Jun 2026
20 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Deep Well Boring | |||||
| 1.01 | Preparation of site for placement of the drilling rig
including excavation of mud pit, circulation drain,
collection chamber etc. all complete as directed. | - | each DTW | - | - |
| 2.01 | Movement of Rig from the Divisional Head
Quarter to the drilling site including cost of P.O.L.
all complete as directed | - | per km | - | - |
| 3.01 | Transportation of all ancillary equipments, camp
materials, welding set, rig accessories etc. from
Divisional Head Quarter to worksite to and fro
including cost of P.O.L. all complete as directed.
(a) Upto 100.00 Km distance from Divisional H.Q. | - | per km | - | - |
| 4.01 | Transportation of all store materials like pipes,
strainer, cone, socket, clamp, bentonite etc. from
Divisional Head Quarter to worksite to and fro
including cost of P.O.L. all complete as directed.
(a) Upto 100.00 Km distance from Divisional H.Q | - | per km | - | - |
| 5.01 | Transportation of air compressor from the
Divisional Head Quarter to the drilling site with
all accessories including cost of P.O.L. all
complete as directed.
(a) Upto 100.00 Km distance from Divisional H.Q. | - | per km | - | - |
| 6.01 | Transportation of P.O.L. all complete as directed. | - | ltr | - | - |
| 7.01 | Construction of temporary accommodation and
low cost sanitary facility for drilling staff including
cost of camp materials viz. cots, tables, chairs,
utensils, dresses, safety helmets etc. and
dismantling the accommodation after completion
of the work all complete as directed. | - | each DTW | - | - |
| 8.01 | Providing water supply facilities at drilling site all
complete as directed.
DEEP TUBE WELL BY ROTARY/DTH/ODEX SYSTEM RIG
(TO BE DONE BY CONTRACTOR / OUTSIDE AGENCY RIG)
(a) By installing 1 Nos. of Singur hand pump | - | each DTW | - | - |
| 8.02 | (b) By installing 1 No. 5 HP dewatering pump | - | each DTW | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BID.pdf
Tender Documents • 1.09 MB
Drawings.pdf
Additional Documents • 0.87 MB
BOQ_83438.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .