| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.3 CrRejected-Finance 13B ELLORA ENCLAVE DAYAL BAGH AGRA U P | AGRA | AGRA | UTTAR PRADESH | ₹2.3 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹2.3 CrRejected-Finance | ₹2.3 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹2.5 CrRejected-Finance M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹2.5 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹2.6 CrRejected-Finance | ₹2.6 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/s Mithilesh Kumar L3 | M/S BADRI SINGH L4 | m/s satish chandra jaiswal L5 | NIKHIL CONSTRUCTION L2 | shivansh venture pvt ltd L7 | VINAY KUMAR SINGH L1 | M/S PRATAP NIRMAN SANSTHAN L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 14,912.3 | M3 | 50 ₹7.5 L | 67 ₹10.0 L | 60 ₹8.9 L | 48 ₹7.2 L | 76 ₹11.3 L | 44 ₹6.6 L | 60 ₹8.9 L |
| 2.00 | E/W in restoration & strengthening of bank's in all type of soil mixed with chharry, karail, black cotton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 47,968.2 | M3 | 177.5 ₹85.1 L | 170 ₹81.5 L | 175 ₹83.9 L | 149 ₹71.5 L | 189.2 ₹90.8 L | 135 ₹64.8 L | 185 ₹88.7 L |
| 3.00 | Excavation of foundation and its back filling with all type of soil including labour, T&P etc. for proper completion of work as per direction of Engineer –in-Charge. | 2,524.9 | M3 | 84 ₹2.1 L | 70 ₹1.8 L | 92 ₹2.3 L | 75 ₹1.9 L | 98.56 ₹2.5 L | 81 ₹2.0 L | 105 ₹2.7 L |
| 4.00 | Laying C.C. M-10 (1:3:6) one part of cement three part of coarse sand F.M.>2.00 & six part of stone ballast (size 20 mm to 40 mm) including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 1,068.97 | M3 | 3,702 ₹39.6 L | 4,400 ₹47.0 L | 4,400 ₹47.0 L | 4,500 ₹48.1 L | 4,678.01 ₹50.0 L | 3,900 ₹41.7 L | 4,725 ₹50.5 L |
| 5.00 | C.R.S masonary in 1:3CM (one part of cement, three Part of coarse sand F.M. >2.00) including cost of labour, materials, T&P etc. For Proper completion of work as per direction of Engineer of in - charge. | 1,839.97 | M3 | 3,990 ₹73.4 L | 4,600 ₹84.6 L | 4,700 ₹86.5 L | 4,500 ₹82.8 L | 4,970.24 ₹91.5 L | 4,450 ₹81.9 L | 4,700 ₹86.5 L |
| 6.00 | Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 145.52 | M2 | 630 ₹91,677.60 | 500 ₹72,760 | 740 ₹1.1 L | 670 ₹97,498.40 | 651.2 ₹94,762.62 | 540 ₹78,580.80 | 840 ₹1.2 L |
| 7.00 | Supplying & fixing 20mm thick joint filler board including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 23.04 | M2 | 817 ₹18,823.68 | 800 ₹18,432 | 1,090 ₹25,113.60 | 550 ₹12,672 | 959.2 ₹22,099.97 | 820 ₹18,892.80 | 1,090 ₹25,113.60 |
| 8.00 | S/L 3mm thick multi-plast poly Plus Tar paper including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 38.81 | M2 | 52.5 ₹2,037.53 | 50 ₹1,940.50 | 70 ₹2,716.70 | 45 ₹1,746.45 | 61.6 ₹2,390.70 | 65 ₹2,522.65 | 70 ₹2,716.70 |
| 9.00 | Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 5.54 | M.T. | 49,268 ₹2.7 L | 62,000 ₹3.4 L | 65,691.05 ₹3.6 L | 58,000 ₹3.2 L | 70,400 ₹3.9 L | 69,000 ₹3.8 L | 65,691 ₹3.6 L |
| 10.00 | Laying R.C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 62.27 | M3 | 6,449 ₹4.0 L | 8,000 ₹5.0 L | 8,000 ₹5.0 L | 6,700 ₹4.2 L | 6,889.48 ₹4.3 L | 7,650 ₹4.8 L | 8,599 ₹5.4 L |
Tender Value
₹3.1 Cr
EMD Value
₹6.1 L
Closing Date
20 Feb 2026, 3:00 pmClosed
SE
SE, IRRIGATION WORK CIRCLE, 9 SAPRU ROAD, CIVIL LINE, PRAYAGRAJ
Restoration of Pucca work of Belan main canal from Km. 44.450 to 52.600.
2026_UPIDC_1113784_5
05/SE/2025-26
Open Tender
Civil Works
540 days
PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹6.1 L
25 May 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
E/W in restoration & strengthening of bank's in all type of soil mixed with chharry, karail, black cotton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
Excavation of foundation and its back filling with all type of soil including labour, T&P etc. for proper completion of work as per direction of Engineer –in-Charge.
Laying C.C. M-10 (1:3:6) one part of cement three part of coarse sand F.M.>2.00 & six part of stone ballast (size 20 mm to 40 mm) including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
C.R.S masonary in 1:3CM (one part of cement, three Part of coarse sand F.M. >2.00) including cost of labour, materials, T&P etc. For Proper completion of work as per direction of Engineer of in - charge.
Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Supplying & fixing 20mm thick joint filler board including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
S/L 3mm thick multi-plast poly Plus Tar paper including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Laying R.C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Laying C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Cement pointing 1:2 C.M. including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Dry stone boulder Pitching 200mm thick filling joint with sand including cost of labour, material, T&P etc. for proper completion of work as per direction of in- charge.
Colour washing of two coat of parapet including cost of all materials,labour and T&P etc.
Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc.
E/W In Embankment for restoration of canal section on Pucca structures Nearby in all type of soil mixed including all lead ,lift dressing , etc.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
DOC_Belan.pdf
Tender Documents • 2.59 MB
BOQ_2063974.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid