| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.3 Cr+₹4.8 L (2.15%)Rejected-Finance 13B ELLORA ENCLAVE DAYAL BAGH AGRA U P | AGRA | AGRA | UTTAR PRADESH | ₹2.3 Cr+₹4.8 L (2.15%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.3 Cr+₹7.1 L (3.20%)Rejected-Finance | ₹2.3 Cr+₹7.1 L (3.20%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.5 Cr+₹27.1 L (12.1%)Rejected-Finance M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹2.5 Cr+₹27.1 L (12.1%) | L4 | Rejected-Finance L4 |
| 5 | L5₹2.6 Cr+₹32.9 L (14.8%)Rejected-Finance | ₹2.6 Cr+₹32.9 L (14.8%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/s Mithilesh Kumar L3 | M/S BADRI SINGH L4 | m/s satish chandra jaiswal L5 | NIKHIL CONSTRUCTION L2 | shivansh venture pvt ltd L7 | VINAY KUMAR SINGH L1 | M/S PRATAP NIRMAN SANSTHAN L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 14,912.3 | M3 | 50 ₹7,45,615 | 67 ₹9,99,124.1 | 60 ₹8,94,738 | 48 ₹7,15,790.4 | 76 ₹11,33,334.8 | 44 ₹6,56,141.2 Lowest | 60 ₹8,94,738 |
| 2.00 | E/W in restoration & strengthening of bank's in all type of soil mixed with chharry, karail, black cotton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge. | 47,968.2 | M3 | 177.5 ₹85,14,355.5 | 170 ₹81,54,594 | 175 ₹83,94,435 | 149 ₹71,47,261.8 | 189.2 ₹90,75,583.44 | 135 ₹64,75,707 Lowest | 185 ₹88,74,117 |
| 3.00 | Excavation of foundation and its back filling with all type of soil including labour, T&P etc. for proper completion of work as per direction of Engineer –in-Charge. | 2,524.9 | M3 | 84 ₹2,12,091.6 | 70 ₹1,76,743 Lowest | 92 ₹2,32,290.8 | 75 ₹1,89,367.5 | 98.56 ₹2,48,854.14 | 81 ₹2,04,516.9 | 105 ₹2,65,114.5 |
| 4.00 | Laying C.C. M-10 (1:3:6) one part of cement three part of coarse sand F.M.>2.00 & six part of stone ballast (size 20 mm to 40 mm) including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 1,068.97 | M3 | 3,702 ₹39,57,326.94 Lowest | 4,400 ₹47,03,468 | 4,400 ₹47,03,468 | 4,500 ₹48,10,365 | 4,678.01 ₹50,00,652.35 | 3,900 ₹41,68,983 | 4,725 ₹50,50,883.25 |
| 5.00 | C.R.S masonary in 1:3CM (one part of cement, three Part of coarse sand F.M. >2.00) including cost of labour, materials, T&P etc. For Proper completion of work as per direction of Engineer of in - charge. | 1,839.97 | M3 | 3,990 ₹73,41,480.3 Lowest | 4,600 ₹84,63,862 | 4,700 ₹86,47,859 | 4,500 ₹82,79,865 | 4,970.24 ₹91,45,092.49 | 4,450 ₹81,87,866.5 | 4,700 ₹86,47,859 |
| 6.00 | Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 145.52 | M2 | 630 ₹91,677.6 | 500 ₹72,760 Lowest | 740 ₹1,07,684.8 | 670 ₹97,498.4 | 651.2 ₹94,762.62 | 540 ₹78,580.8 | 840 ₹1,22,236.8 |
| 7.00 | Supplying & fixing 20mm thick joint filler board including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 23.04 | M2 | 817 ₹18,823.68 | 800 ₹18,432 | 1,090 ₹25,113.6 | 550 ₹12,672 Lowest | 959.2 ₹22,099.97 | 820 ₹18,892.8 | 1,090 ₹25,113.6 |
| 8.00 | S/L 3mm thick multi-plast poly Plus Tar paper including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 38.81 | M2 | 52.5 ₹2,037.53 | 50 ₹1,940.5 | 70 ₹2,716.7 | 45 ₹1,746.45 Lowest | 61.6 ₹2,390.7 | 65 ₹2,522.65 | 70 ₹2,716.7 |
| 9.00 | Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 5.54 | M.T. | 49,268 ₹2,72,944.72 Lowest | 62,000 ₹3,43,480 | 65,691.05 ₹3,63,928.42 | 58,000 ₹3,21,320 | 70,400 ₹3,90,016 | 69,000 ₹3,82,260 | 65,691 ₹3,63,928.14 |
| 10.00 | Laying R.C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 62.27 | M3 | 6,449 ₹4,01,579.23 Lowest | 8,000 ₹4,98,160 | 8,000 ₹4,98,160 | 6,700 ₹4,17,209 | 6,889.48 ₹4,29,007.92 | 7,650 ₹4,76,365.5 | 8,599 ₹5,35,459.73 |
Tender Value
₹3.1 Cr
EMD Value
₹6.1 L
Closing Date
20 Feb 2026, 3:00 pmClosed
SE
SE, IRRIGATION WORK CIRCLE, 9 SAPRU ROAD, CIVIL LINE, PRAYAGRAJ
Restoration of Pucca work of Belan main canal from Km. 44.450 to 52.600.
2026_UPIDC_1113784_5
05/SE/2025-26
Open Tender
Civil Works
Item Wise
540 days
PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹6.1 L
25 May 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
E/W in cutting bed of canal including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
E/W in restoration & strengthening of bank's in all type of soil mixed with chharry, karail, black cotton soil or moorum mixed soil including all lead , lift , manual compaction dressing and T&P etc. as per direction of Engineer in charge.
Excavation of foundation and its back filling with all type of soil including labour, T&P etc. for proper completion of work as per direction of Engineer –in-Charge.
Laying C.C. M-10 (1:3:6) one part of cement three part of coarse sand F.M.>2.00 & six part of stone ballast (size 20 mm to 40 mm) including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
C.R.S masonary in 1:3CM (one part of cement, three Part of coarse sand F.M. >2.00) including cost of labour, materials, T&P etc. For Proper completion of work as per direction of Engineer of in - charge.
Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Supplying & fixing 20mm thick joint filler board including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
S/L 3mm thick multi-plast poly Plus Tar paper including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Laying R.C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Laying C.C. M-20 (1:1.5:3) With cement, crushed grit size 10 mm to 20mm well graded including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Cement pointing 1:2 C.M. including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Dry stone boulder Pitching 200mm thick filling joint with sand including cost of labour, material, T&P etc. for proper completion of work as per direction of in- charge.
Colour washing of two coat of parapet including cost of all materials,labour and T&P etc.
Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc.
E/W In Embankment for restoration of canal section on Pucca structures Nearby in all type of soil mixed including all lead ,lift dressing , etc.
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
DOC_Belan.pdf
Tender Documents • 2.59 MB
BOQ_2063974.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .