Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹1.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.5 L+₹14.85 (0.01%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹1.5 L+₹14.85 (0.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹4,455
Closing Date
27 Aug 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
INSTALLATION OF GATE/BATHROOM AT MASJID SHAREEF MOGAL MOHALLA RANBIPORA B BLOCK KPORA
2026_RDPR_321602_107
ENIT97of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹4,455
5 Sept 2026
21 Aug 2026
28 Aug 2026
21 Aug 2026
27 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | SITE CLEARANCE by way of engagement of labour for removing of unhygenic material and removing of vegetation etc | - | cum | - | - |
| 0.0 | E/w in excavation in foundation by manual means in trenches for foundation (not exceeding 1.5m in width), depth upto 1.5m inc. disposal of excavated earth upto 1m from cutting edge all kinds of soil. | - | cum | - | - |
| 0.0 | Providing and laying of dry stome solling/rbm inc. all carriages I/C PLUM IN C/C | - | cum | - | - |
| 0.0 | P/Fixing of Cement Concrete Rings (.84m dia & 0.15m Ht ) incl. all Carriages | - | no. | - | - |
| 0.0 | P/L cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:3:6) all work upto plinth level | - | Cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) for foundation. | - | cum | 1 | - |
| 0.0 | Brickwork with common burnt clay fps(non modular) bricks of class designation 75 in foundation and plinth in CM (1:6) inc. all carriages complete job. | - | cum | - | - |
| 0.0 | 12 mm thick plaster 1:6 mix | - | sqm | 1 | - |
| 0.0 | RCC work in beams, suspended floors,roofs having slope upto 15 degree landings,balconies,shelves,chajjas,lintels,bands,plain window sills,stair cases and spiral stair cases upto five level inc. curing but excluding the cost of centering and shuttering finishing and reinforcement with (1:2:4) m15 mix and 20 mm nominal size aggregates | - | cum | - | - |
| 0.0 | Cenetering and shuttering inc. propping etc and removal of formwork for roof, slab inside,slab,steps offset,septic tank,soakage pit. | - | sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_1075770.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .