Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | L1 | Accepted-AOC found lowest | |
| 2 | L2₹6.1 L+₹13,139 (2.21%)Rejected-Finance | L2 | Rejected-Finance Not found lowest | |
| 3 | L3₹7.0 L+₹99,445 (16.7%)Rejected-Finance | L3 | Rejected-Finance Not found lowest | |
| 4 | L4₹7.5 L+₹1.5 L (25.2%)Rejected-Finance | L4 | Rejected-Finance Not found lowest | |
| 5 | L5₹7.8 L+₹1.8 L (31.0%)Rejected-Finance 424 A B GANDHI NAGAR JAMMU AND KASHMIR 180004 | JAMMU | JAMMU | JAMMU AND KASHMIR | 180004 | L5 | Rejected-Finance Not found lowest |
| Sl No | Description | Qty | Unit | kailu construction co L6 | Vishav Karma Refrigeration and Electric Work L2 | M/S K B CONSTRUCTION CO L8 | Durga Electricals L7 | dinesh enterprises L3 | ANIL ENTERPRISES L1 | Ashoka Engineers L4 | M/S INOVISION ENTERPRISES L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply and fix three phase input & single phase output, PWM technology, On line UPS of Capacity 10 KVA the UPS to have LCD display with built in isolation tranformer & By-Pass arrangement with auto change over protection in case of high & low voltage, single Phasing and phase reversal protection etc. The power factor of UPS to be minimum 0.8L UPS make: Sinterac/Microtec. Inclusive of SMF batteries angle iron Rack with copper connecting cable & thimbles. The SMF batteries bank to be provided to give a back up time 60 minute on full load. Battery. Make: Exide/Amron/HBL. Note : (i) The manufacturer is resposible for smooth functioning of UPS for 02 years, incase any complaint with in guarantee period, the manufactrure to attend complaint with in six hour and rectify the complaint. (ii) If the complaint not attend in the given time penalty @ Rs 3000/Day will be imposed by deptt. (iii) the quoted rate shall include the cost of earthing of UPS as per manufacturers instructions and directed by Engineer-in-charge (02 Nos) (iv) Necessary length of cable for incoming(as per load) conection for main panel to UPS is included in same item, no extra amount to be paid to contractor (up to length of up to 30 RM) | 2 | Each | 3,50,000 ₹7,00,000 | 2,56,449 ₹5,12,898 | 3,80,000 ₹7,60,000 | 3,50,000 ₹7,00,000 | 2,95,000 ₹5,90,000 | 2,47,638.75 ₹4,95,277.5 Lowest | 3,26,700 ₹6,53,400 | 3,10,000 ₹6,20,000 |
| 2.00 | Supply and fix smart inverter type, air cooled split unit air conditioner electric driven, single phase of capacity of 1.5 TR, BEE 5 star rating on an AC indicates, highly energy-efficient 230 Volt complete fix on wall including copper tube, electric wire as required drainout pipe complete all as specified and directed by Engr-in-charge. | 2 | Each | 45,000 ₹90,000 | 43,449 ₹86,898 | 70,000 ₹1,40,000 | 56,700 ₹1,13,400 | 49,000 ₹98,000 | 47,638.75 ₹95,277.5 | 41,500 ₹83,000 Lowest | 70,000 ₹1,40,000 |
| 3.00 | Supply and fix Voltage stabilizer copper wounded for automatic operation, single phase naturally air cooled indoor type & designed for input variation between 170 V to 250 V with output voltage stabilized at 230 V with accuracy of ± 2.5% and of capacity 4 KVA complete all as specified and directed by Engr-in-charge. | 2 | Each | 2,500 ₹5,000 | 4,449 ₹8,898 | 8,000 ₹16,000 | 2,295 ₹4,590 Lowest | 3,500 ₹7,000 | 2,500 ₹5,000 | 4,500 ₹9,000 | 10,000 ₹20,000 |
Tender Value
₹9.8 L
EMD Value
₹19,540
Closing Date
10 Jan 2026, 6:00 pmClosed
Sachin R Barshetty
GE Basoli PO Lakhanpur Distt Kathua (JK) 184152
GE/BAS-88/2025-26 Provn of 10 KVA UPS (single phase) and split type air conditioner at Janglote and Basoli mil station under GE Basoli
2025_MES_745457_1
GE/BAS-88/2025-26
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Janglote and Basoli Stn under GE Basoli
As per tender
8 documents required · 8 mandatory
₹500
GE Basoli
₹19,540
Yes
5 Feb 2026
20 Dec 2025
12 Jan 2026
20 Dec 2025
10 Jan 2026
3 Jan 2026
Supply and fix three phase input & single phase output, PWM technology, On line UPS of Capacity 10 KVA the UPS to have LCD display with built in isolation tranformer & By-Pass arrangement with auto change over protection in case of high & low voltage, single Phasing and phase reversal protection etc. The power factor of UPS to be minimum 0.8L UPS make: Sinterac/Microtec. Inclusive of SMF batteries angle iron Rack with copper connecting cable & thimbles. The SMF batteries bank to be provided to give a back up time 60 minute on full load. Battery. Make: Exide/Amron/HBL. Note : (i) The manufacturer is resposible for smooth functioning of UPS for 02 years, incase any complaint with in guarantee period, the manufactrure to attend complaint with in six hour and rectify the complaint. (ii) If the complaint not attend in the given time penalty @ Rs 3000/Day will be imposed by deptt. (iii) the quoted rate shall include the cost of earthing of UPS as per manufacturers instructions and directed by Engineer-in-charge (02 Nos) (iv) Necessary length of cable for incoming(as per load) conection for main panel to UPS is included in same item, no extra amount to be paid to contractor (up to length of up to 30 RM)
Supply and fix smart inverter type, air cooled split unit air conditioner electric driven, single phase of capacity of 1.5 TR, BEE 5 star rating on an AC indicates, highly energy-efficient 230 Volt complete fix on wall including copper tube, electric wire as required drainout pipe complete all as specified and directed by Engr-in-charge.
Supply and fix Voltage stabilizer copper wounded for automatic operation, single phase naturally air cooled indoor type & designed for input variation between 170 V to 250 V with output voltage stabilized at 230 V with accuracy of ± 2.5% and of capacity 4 KVA complete all as specified and directed by Engr-in-charge.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
tender88.pdf
Tender Documents • 0.83 MB
BOQ_834721.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .