| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.1 CrAccepted-AOC GILANPARA DUMKA | DUMKA | JHARKHAND | 814101 | ₹19.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹21.6 Cr+₹2.5 Cr (13.2%)Rejected-Finance PATHARGAMA GODDA | PATHARGAMA | GODDA | JHARKHAND | ₹21.6 Cr+₹2.5 Cr (13.2%) | L2 | Rejected-Finance L2 |
| 3 | L3₹22.4 Cr+₹3.3 Cr (17.2%)Rejected-Finance BEHIND HERO HONDA SHOWROOM DUDHANI BHAGALPUR ROAD DUMKA | DUMKA | JHARKHAND | 814101 | ₹22.4 Cr+₹3.3 Cr (17.2%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | M/S S K TEKRIWAL L2 | M/s CHITRA CONSTRUCTION L1 | HARI NANDAN CHOUDHARY L3 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150mm in thickness. (By mechanical means using dozer in area of light jungle) RCDSOR 2.03 (i) A | 6.56 | Hect. | 93,110.11 ₹6,10,988.54 | 1,000 ₹6,562 Lowest | 96,420.21 ₹6,32,709.42 |
| 2.00 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. ( Earthen Shoulder ) RCD SOR 3.18 | 9,843.12 | cum | 138.14 ₹13,59,728.6 | 131.3 ₹12,92,401.66 Lowest | 143.05 ₹14,08,058.32 |
| 3.00 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course RCD SOR 2.05 (ii) A | 457.6 | cum | 246.19 ₹1,12,656.54 | 10 ₹4,576 Lowest | 254.94 ₹1,16,660.54 |
| 4.00 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately Granular Course . RCD SOR 2.05 (i) B | 2,574 | cum | 457.77 ₹11,78,299.98 | 10 ₹25,740 Lowest | 474.04 ₹12,20,178.96 |
| 5.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. For grading -V material RCD SOR 4.01 B (v) | 1,144 | cum | 2,283.83 ₹26,12,701.52 | 2,000 ₹22,88,000 Lowest | 2,363.98 ₹27,04,393.12 |
| 6.00 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. RCD SOR 4.14 B | 1,430 | cum | 2,670.3 ₹38,18,529 | 2,200 ₹31,46,000 Lowest | 2,765.23 ₹39,54,278.9 |
| 7.00 | Prime coat over WMM/ WBM Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means RCD SOR 5.01 A (i) | 5,720 | sqm | 85.7 ₹4,90,204 | 81.06 ₹4,63,663.2 Lowest | 88.75 ₹5,07,650 |
| 8.00 | Tack coat on Bituminous surface treated with primer. Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. RCD SOR 5.02 (ii) | 5,720 | sqm | 16.84 ₹96,324.8 | 15.87 ₹90,776.4 Lowest | 17.44 ₹99,756.8 |
| 9.00 | Tack coat on Bituminous surface treated with primer. Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. RCD SOR 5.02 (i) | 2,91,850.24 | sqm | 13.6 ₹39,69,163.26 | 12.82 ₹37,41,520.08 Lowest | 14.09 ₹41,12,169.88 |
| 10.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects with VG-30 Bulk Bitumen. Grade II RCD SOR 5.04 AB | 7,439.26 | cum | 10,029.91 ₹7,46,15,108.27 | 9,200 ₹6,84,41,192 Lowest | 10,386.45 ₹7,72,67,502.03 |
Tender Value
₹20.6 Cr
EMD Value
₹20.6 L
Closing Date
24 Dec 2025, 12:00 pmClosed
Executive Engineer, RCD, Road Division, Sahibganj
Executive Engineer, RCD, Road Division, Sahibganj
IRQP Work for Harinchara more (SH-18) to Barhait (MDR-211) from KM 0.00 to 23.60 and Kherwa Shivgadi Link Road from KM 0.00 to 3.60 (Total Lengh-27.20 KM) under Road Division, Sahibganj for the year 2025-26
2025_CECOM_107074_1
RCD/SAHIBGANJ/994/2025-26
Open Tender
Civil Works
Item Rate
182 days
Harinchara More to Barhait
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹20.6 L
CE(Comm), RCD, Jharkhand, Ranchi
13 Aug 2026
28 Nov 2025
26 Dec 2025
28 Nov 2025
24 Dec 2025
6 Dec 2025
5 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150mm in thickness. (By mechanical means using dozer in area of light jungle) RCDSOR 2.03 (i) A | - | Hect. | 88,499.5 | - |
| 2 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. ( Earthen Shoulder ) RCD SOR 3.18 | - | cum | 131.3 | - |
| 3 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course RCD SOR 2.05 (ii) A | - | cum | 234 | - |
| 4 | Dismantling of flexible pavements and disposal of dismantled materials upto a leadof 1000 metres, stacking serviceable and unserviceable materials separately Granular Course . RCD SOR 2.05 (i) B | - | cum | 435.1 | - |
| 5 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. For grading -V material RCD SOR 4.01 B (v) | - | cum | 2,169.78 | - |
| 6 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. RCD SOR 4.14 B | - | cum | 2,538.07 | - |
| 7 | Prime coat over WMM/ WBM Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means RCD SOR 5.01 A (i) | - | sqm | 81.46 | - |
| 8 | Tack coat on Bituminous surface treated with primer. Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. RCD SOR 5.02 (ii) | - | sqm | 16.01 | - |
| 9 | Tack coat on Bituminous surface treated with primer. Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. RCD SOR 5.02 (i) | 0.29 | sqm | 12.93 | ₹3.75 |
| 10 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects with VG-30 Bulk Bitumen. Grade II RCD SOR 5.04 AB | - | cum | 9,533.23 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
SBD994.pdf
Tender Documents • 4.07 MB
BOQ_144520.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .