Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹29.6 LAdmitted-Finance 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | +4.00% | ₹29.6 L | L1 | Admitted-Finance |
| 2 | L2₹30.8 LAdmitted-Finance | +8.20% | ₹30.8 L | L2 | Admitted-Finance |
Tender Value
₹28.4 L
EMD Value
₹56,886
Closing Date
13 Apr 2026, 3:00 pmClosed
EXECUTIVE ENGINEER (E)
Executive Engineer Electrical Division-3, Siri Fort Road Behind Gargi College New Delhil-49
Comprehensive Running Maintenance and Operation of HVAC system, Split and window AC and water cooler at Saket sports complex.
2026_DDA_904524_1
01/EE/ELD-3/DDA/2026-27
Open Tender
Electrical Works
365 days
As Per Tender Document
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹56,886
Executive Engineer Electrical Division-3
19 May 2026
4 Apr 2026
14 Apr 2026
4 Apr 2026
13 Apr 2026
6 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sub Head-I HVAC System
Running Maintenance and Operation including routine, preventive and breakdown maintenance of High side & Low side of the Air Conditioning plant and other system / equipment of HVAC installation comprising of all machinery, equipments etc. as per additional condition attached. Details of installations are given in Annexure ‘A’ & schedule of routine & preventive maintenance is given is Annexure ‘B’. Operation shall be done by deploying 1 no. operator (Grade-I) in each shift of 8 hours round the clock & 1 no. Khallasi in general shift (i.e. 10:00 am to 6:00 pm). | 12 | Per Month | - | - |
| 2 | Comprehensive Maintenance of HVAC Plant Equipment / Cassette ACs complete as required. Details of installations of HVAC plant Equipment / Cassette ACs are given in Annexure-A. Schedule of routine and preventive maintenance is given in Annexure- B. | 12 | Per Month | - | - |
| 3 | Sub Head-II Split AC, Window type AC & Water Cooler
Supplying and charging of R-22/R-410 Gas in the AC units including Pdg & fixing necessary copper piping, capillary tube including pressure testing, leak detecting and commissioning etc, complete required at site.
a) 1.5TR Window /2.0 TR Water Cooler storage capacity 150 Ltr | 50 | Kg | - | - |
| 4 | Rewinding of fan motor of 2.0 TR Split type AC units and Water Cooler (capacity 150 Ltr) i/c replacement of gun metal bushes, testing, commissioning etc as required. | 7 | Each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.18 MB
BOQ_950733.xls
BOQ • 0.24 MB
nit.pdf
Tender Documents • 4.73 MB
Download all tender documents and submit your bid