| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.2 LAccepted-AOC | 1 | Accepted-AOC DUE TO LOWEST BIDDER | |
| 2 | 2₹22.3 L+₹17,218.52 (0.78%)Rejected-Finance | 2 | Rejected-Finance DUE TO SECOND LOWEST | |
| 3 | Not Admitted-Fee/PreQual/Technical 117 2 KAKA DEV KANPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/s Shree Construction L1 | A.K. CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation/cutting in ordinary soil excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slopes and also including 1.50 meter lift and 30 meter lead as per directed by Engineer in Charge. | 515.86 | CUM | 44 ₹22,697.84 Lowest | 48 ₹24,761.28 |
| 2.00 | Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 25.9 | CUM | 5,160 ₹1,33,644 Lowest | 5,196 ₹1,34,576.4 |
| 3.00 | Providing and laying of Cement Concrete (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 71.15 | CUM | 5,635 ₹4,00,930.25 Lowest | 5,642 ₹4,01,428.3 |
| 4.00 | Providing and laying of RCC (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. (Excluding rate of Reinforcement Steel ) | 18.17 | CUM | 5,965 ₹1,08,384.05 Lowest | 5,990.1 ₹1,08,840.12 |
| 5.00 | Brick work M-105 in 1:3 cement mortar including cost of all material, labour and T&P etc. complete required for proper complition of work. | 173.11 | CUM | 5,430 ₹9,39,987.3 Lowest | 5,440 ₹9,41,718.4 |
| 6.00 | Providing and fixing 150 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete | 540 | RMT | 555 ₹2,99,700 Lowest | 560 ₹3,02,400 |
| 7.00 | Providing and fixing 100 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete | 36 | RMT | 132.5 ₹4,770 Lowest | 134.1 ₹4,827.6 |
| 8.00 | Providing and Fixing Steel Reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in position, including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction in Charge | 524.15 | KG | 60.2 ₹31,553.83 Lowest | 61.9 ₹32,444.89 |
| 9.00 | Providing and Fixing Centering and Shuttering for C.C. works including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction of Engineer in Charge. | 338.2 | SQM | 450 ₹1,52,190 Lowest | 465 ₹1,57,263 |
| 10.00 | Providing and Fixing Centering and Shuttering for RCC works including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction of Engineer in Charge. | 187.72 | SQM | 650 ₹1,22,018 Lowest | 665 ₹1,24,833.8 |
Tender Value
₹22.5 L
EMD Value
₹45,000
Closing Date
13 Jun 2026, 5:00 pmClosed
Ex.En. M G C Div 8 Bulandshahr
M G C Div 8 Bulandshahr
Lot 1 Construction of Outlet at Bahjoi Branch from Km. 32.300 to Km. 50.800
2026_UPIDC_1157876_1
02/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
45 days
SAMBHAL
2 documents required · 2 mandatory
₹944
₹45,000
Yes
1 Oct 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
13 Jun 2026
8 Jun 2026
8 Jun 2026 - 13 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation/cutting in ordinary soil excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slopes and also including 1.50 meter lift and 30 meter lead as per directed by Engineer in Charge. | - | CUM | - | - |
| 2 | Providing and laying of Cement Concrete (M-10 grade) 1:3:6 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 1 | CUM | - | - |
| 3 | Providing and laying of Cement Concrete (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. | - | CUM | - | - |
| 4 | Providing and laying of RCC (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. (Excluding rate of Reinforcement Steel ) | - | CUM | - | - |
| 5 | Brick work M-105 in 1:3 cement mortar including cost of all material, labour and T&P etc. complete required for proper complition of work. | - | CUM | - | - |
| 6 | Providing and fixing 150 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete | - | RMT | - | - |
| 7 | Providing and fixing 100 mm dia PVC pipe in outlet I/C all type of material and Labour , T&P filter etc complete | - | RMT | - | - |
| 8 | Providing and Fixing Steel Reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in position, including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction in Charge | 1 | KG | - | - |
| 9 | Providing and Fixing Centering and Shuttering for C.C. works including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction of Engineer in Charge. | 1 | SQM | - | - |
| 10 | Providing and Fixing Centering and Shuttering for RCC works including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction of Engineer in Charge. | 1 | SQM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
TD1.pdf
Tender Documents • 2.24 MB
BOQ_2169982.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .