| 1 | 1₹1.5 CrAccepted-AOC | ₹1.5 Cr | 1 | Accepted-AOC Due to lower rate |
| 2 | 2₹1.5 Cr+₹7.1 L (4.84%)Rejected-AOC RGTPP KHEDAR HISAR HARYANA | HISAR | HARYANA | 125001 | ₹1.5 Cr+₹7.1 L (4.84%) | 2 | Rejected-AOC Due to higher rate |
| 3 | 3₹1.7 Cr+₹24.1 L (16.4%)Rejected-AOC HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹1.7 Cr+₹24.1 L (16.4%) | 3 | Rejected-AOC Due to higher rate |
| 4 | 4₹1.8 Cr+₹28.4 L (19.3%)Rejected-AOC | ₹1.8 Cr+₹28.4 L (19.3%) | 4 | Rejected-AOC Due to higher rate |
| 5 | 5₹1.8 Cr+₹29.0 L (19.7%)Rejected-AOC THE SHIV SHAKTI CO OP LANDC SOCIETY LIMITED BALERKHA VILLAGE BALERKHA TEHSIL NARWANA DISTRICT JIND HARYANA 126116 | BALERKHA | JIND | HARYANA | 126116 | ₹1.8 Cr+₹29.0 L (19.7%) | 5 | Rejected-AOC Due to higher rate |
| Sl No | Description | Qty | Unit | ROHTASH KUMAR CONTRACTOR L5 | Rajinder Parshad Jain Contractor Jind L1 | NAFE SINGH CONTRACTOR L2 | HANISH CHHABRA CONTRACTOR L4 | THE SHIV SHAKTI COOP L&C SOCIETY LTD L3 |
|---|---|---|---|---|---|---|---|---|
| 1.10 | Supplying, erection, testing and commissioning of Horizontal centrifugal pumping set for Raw water of reputed make i.e Compton, Greeves, Kirloskar etc. complete in all respects. (pumping of Raw water Discharge - 500 LPM, Head - 12.50 M, HP-5.00 = 2 Nos.)... | 2 | Nos. | 70,000 ₹1,40,000 | 50,000 ₹1,00,000 Lowest | 70,000 ₹1,40,000 | 1,00,000 ₹2,00,000 | 80,000 ₹1,60,000 |
| 1.20 | Operation and Maintenance of Independent Canal based water works for complete scope of work mentioned in the DNIT in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT.
1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only) | 1 | Job | 1,50,000 ₹1,50,000 | 80,000 ₹80,000 Lowest | 1,50,000 ₹1,50,000 | 2,40,000 ₹2,40,000 | 2,00,000 ₹2,00,000 |
| 1.30 | 1st year Operation and maintenance after defect liability period | 1 | Job | 1,70,000 ₹1,70,000 | 1,64,000 ₹1,64,000 Lowest | 1,70,000 ₹1,70,000 | 2,40,000 ₹2,40,000 | 4,50,000 ₹4,50,000 |
| 1.40 | 2nd year Operation and maintenance | 1 | Job | 1,80,000 ₹1,80,000 | 1,64,000 ₹1,64,000 Lowest | 1,70,000 ₹1,70,000 | 3,00,000 ₹3,00,000 | 4,50,000 ₹4,50,000 |
| 1.50 | 3rd year Operation and maintenance | 1 | Job | 1,90,000 ₹1,90,000 | 1,64,000 ₹1,64,000 Lowest | 1,70,000 ₹1,70,000 | 3,00,000 ₹3,00,000 | 4,50,000 ₹4,50,000 |
| 1.60 | 4th year Operation and maintenance | 1 | Job | 2,00,000 ₹2,00,000 | 1,64,000 ₹1,64,000 Lowest | 1,70,000 ₹1,70,000 | 3,00,000 ₹3,00,000 | 4,50,000 ₹4,50,000 |
| 1.70 | 5th year Operation and maintenance | 1 | Job | 2,10,000 ₹2,10,000 | 1,64,000 ₹1,64,000 Lowest | 1,70,000 ₹1,70,000 | 3,00,000 ₹3,00,000 | 4,50,000 ₹4,50,000 |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
26 May 2025, 3:00 pmClosed
EXECUTIVE ENGINEER
Narwana PHED
Construction of independent canal based water works and Strengthening of Distribution system
2025_HRY_447064_1
20257E2FDB0E 9756 439E A897 2B3B3B3E356C570PUH
Open Tender
Civil Works
Works
400 days
GARHI
4 documents required · 4 mandatory
₹15,000
₹3.2 L
Yes
15 Sept 2025
15 May 2025
26 May 2025
15 May 2025
26 May 2025
15 May 2025
Amount
Supplying, erection, testing and commissioning of Horizontal centrifugal pumping set for Raw water of reputed make i.e Compton, Greeves, Kirloskar etc. complete in all respects. (pumping of Raw water Discharge - 500 LPM, Head - 12.50 M, HP-5.00 = 2 Nos.)...
Operation and Maintenance of Independent Canal based water works for complete scope of work mentioned in the DNIT in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT. 1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only)
1st year Operation and maintenance after defect liability period
2nd year Operation and maintenance
3rd year Operation and maintenance
4th year Operation and maintenance
5th year Operation and maintenance
Bidder Name
Amount
ROHTASH KUMAR CONTRACTOR (GSTN-NA) BID ID -1267577
Rajinder Parshad Jain Contractor Jind (GSTN-NA) BID ID -1268094
NAFE SINGH CONTRACTOR (GSTN-NA) BID ID -1267996
HANISH CHHABRA CONTRACTOR (GSTN-NA) BID ID -1267392
THE SHIV SHAKTI COOP L&C SOCIETY LTD (GSTN-NA) BID ID -1268359
NAFE SINGH CONTRACTOR (BID ID -1267996)
ROHTASH KUMAR CONTRACTOR (BID ID -1267577)
HANISH CHHABRA CONTRACTOR (BID ID -1267392)
THE SHIV SHAKTI COOP L&C SOCIETY LTD (BID ID -1268359)
NAFE SINGH CONTRACTOR (BID ID -1267996)
THE SHIV SHAKTI COOP L&C SOCIETY LTD (BID ID -1268359)
HANISH CHHABRA CONTRACTOR (BID ID -1267392)
ROHTASH KUMAR CONTRACTOR (BID ID -1267577)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .