| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.5 L+₹2,982.50 (0.40%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹7.6 L
EMD Value
₹7,604
Closing Date
16 Apr 2025, 4:00 pmClosed
Block Development Officer
Block Development office Pallipalayam
Construction of Cremation Shed with Compound wall and CC Pavement to the Burial Ground at Kullanaickenpalayam Colony H/O Kuppandapalayam in Pallipalayam Block of Namakkal District under AGAMT-II-2025-26 PPM-5
2025_RDTN_542500_5
A9/2920/2024 Date 02.04.2025
Open Tender
Civil Works
Item Rate
90 days
Block Development office Pallipalayam
As per schedule
3 documents required · 3 mandatory
₹0
₹7,604
Yes
21 Apr 2025
9 Apr 2025
16 Apr 2025
9 Apr 2025
16 Apr 2025
9 Apr 2025
Amount
Construction of Cremation Shed with Compound wall and CC Pavement to the Burial Ground at Kullanaickenpalayam Colony H/O Kuppandapalayam
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete.,
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick including all charges etc complete
Collection and supply of gravel for filling from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,-Below GL
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,-Above GL
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal (using M-Sand) including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Brick work in cement mortar 1:5 mix using country bricks 83/4x41/4x23/4 (USing M-Sand) and conveyance of all materials to site and all labour charges etc complete (above Basement)-Fly Ash Bricks
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and approved colour over a priming coat including through scrapping, clean removal of dirt and including necessary plaster of pairs putty, wherever required etc complete complying with standard specification
Casting and fixing of RCC precast slab of 75mm thick 1:2:4 using 20mm HBG jelly
Construction of Compound wall
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete.,
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,-Below GL
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,-Above GL
Reinforced cement concrete 1:1.5:3 mix (one cement two sand and four broken stone) using 20 mm gauge machine broken hard granite stone jolly for all R.C.C. items of works excluding cost of reinforcement and fabricating charges including centering and stru
Brick work in cement mortar 1:5 mix using country bricks 83/4x41/4x23/4 (USing M-Sand) and conveyance of all materials to site and all labour charges etc complete (above Basement)-Fly Ash Bricks
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Exterior Emulsion two coats with best approved Plastic Emulsion including cost and conveyance of all materials to site and all labour charges etc complete
Providing Steel Gate Sutable Specification of Schudle of Rate
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
THEERAN TRADERS AND BUILDERS (BID ID -1302217)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_646431.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .