| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.9 LAccepted-AOC | ₹31.9 L Quoted ₹32.4 L | L1 | Accepted-AOC Lowest |
| 2 | L2₹34.4 LRejected-Finance | ₹34.4 L | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹34.5 LRejected-Finance | ₹34.5 L | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹40.0 LRejected-Finance | ₹40.0 L | L4 | Rejected-Finance Not Lowest |
| 5 | L5₹41.2 LRejected-Finance D NO 3 9 560 P 17 E ROAD NO 4 SRI BALAJI NAGAR MANSOORABAD HYDERABAD 500068 | HYDERABAD | MEDCHAL MALKAJGIRI | TELANGANA | 500068 | ₹41.2 L | L5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | M/s ANUSHA ENTERPRISES L6 | M/s K L M INFRATECH L3 | ZOOM ENTERPRISES L8 | J.V.V.K.PRABHAKARARAO L5 | B SRINIVAS L7 | MM PROJECTS L2 | SRI SAI ENTERPRISES L1 | K LAKSHMAN SINGH AND CO L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| .01Note:-(Work shall be carried out upto G+5 storey bldg, contractor to quote rates accordingly). | |||||||||||
| 1.00 | Demolition of cement concrete as in roofs, floors (other than ground floors), beams stair cases, landing, chajjas and similar suspended work, removal of rubbish and debris from site and deposited beyond the area of defence land by contractors own arrangement if failed Rs.500/- per day penality recovery from payment all as specified and as directed. | 47.99 | CUM | 300 ₹14,398.50 | 200 ₹9,599 | 344 ₹16,510.28 | 500 ₹23,997.50 | 100 ₹4,799.50 | 300 ₹14,398.50 | 450 ₹21,597.75 | 200 ₹9,599 |
| 2.00 | Dismantling of existing roof treatment including tar felt/cement plaster/concrete tiles/stone slabs/brick tiles etc from roof surfaces including cleaning the surface and removing the debris from site and deposited beyond the area of defence land by contractors own arrangement if failed Rs.500/- per day penality recovery from payment complete all as specified and as directed by Engr-in-charge. | 1,800 | SQM | 30 ₹54,000 | 15 ₹27,000 | 76 ₹1.4 L | 23 ₹41,400 | 10 ₹18,000 | 25 ₹45,000 | 29 ₹52,200 | 20 ₹36,000 |
| 3.00 | M&L for Plain Cement Concrete Type B0 1:2:4 (using 12.5 mm graded stone aggregate) as in padding concrete, coving of vertical junctions on roof top incl dismantling old loose /cracked cement concrete complete all as directed by Engr-in-charge. | 45 | Cum | 6,000 ₹2.7 L | 5,000 ₹2.3 L | 5,500 ₹2.5 L | 6,800 ₹3.1 L | 5,000 ₹2.3 L | 3,500 ₹1.6 L | 3,500 ₹1.6 L | 4,000 ₹1.8 L |
| 4.00 | M&L for brushing neat cement slurry with 3 Kg of cement per Sqm over the RCC slab and sides complete all as directed by Engineer -in- Charge. | 1,800 | Sqm | 15 ₹27,000 | 10 ₹18,000 | 45 ₹81,000 | 14 ₹25,200 | 150 ₹2.7 L | 25 ₹45,000 | 5 ₹9,000 | 50 ₹90,000 |
| 5.00 | M&L for rendering 10mm in CM 1:3 over concrete surfaces on RCC roof slab and parapets mixed with WPC @ 2% by weight of cement shall be carried out complete all as specified and directed by Engr-in-Charge. Note : WPC will be measured under separate item of this schedule. | 1,800 | Sqm | 220 ₹4.0 L | 140 ₹2.5 L | 260 ₹4.7 L | 230 ₹4.1 L | 210 ₹3.8 L | 185 ₹3.3 L | 150 ₹2.7 L | 150 ₹2.7 L |
| 6.00 | Supply only integral water proofing compound
Make :- SCOTT /AQUA PROF/RAILIA | 236 | Kgs | 40 ₹9,440 | 20 ₹4,720 | 150 ₹35,400 | 50 ₹11,800 | 60 ₹14,160 | 170 ₹40,120 | 20 ₹4,720 | 50 ₹11,800 |
| 7.00 | Providing and applying brush applied water based PU dispersed polymer modified elastomeric liquid membrane, ShaliUrethane BTD White Color with Zero VOC to from the membrane in situ at site with 3 layers of monolithic, seam less finish having > 500% elongation. The first layer is to be apply primer Shaliprime BTD @200 Gms per sqm and shall act as the prime coat to fill in the cavities. This can be brush or roller applied. For spray application, using any airless spary system with recommended nozzle size at 30:1 at 2 bar pressure. Providing and applying the 2nd coat @ 1 kg per sqm using the soft brush, roller or Spray system with the recommended nozzle size on to the primed surface . Providing and applying 45 Gsm Fiber cloth over the 1st coat, when substrate till the coat is tacky. Providing and applying 3rd coat @ 1 kg per sqm to finish the application for a thickness of 1.2 mm membrane formed in place. The second coat should be applied perpendicular to the first coat for cross linkage and complete as per the specification and directed by Engr-in-charge. | 1,800 | Sqm | 750 ₹13.5 L | 650 ₹11.7 L | 650 ₹11.7 L | 590 ₹10.6 L | 540 ₹9.7 L | 700 ₹12.6 L | 755 ₹13.6 L | 650 ₹11.7 L |
| 8.00 | M&L for Cement concrete tiles 25cm x 25cm x 20mm thick, machine pressed with ratio ( 1 part cement : 2 part fine sand : 4 parts stone chips n exc 6mm); set jointed and pointed in neat cement slurry in roofs with white cement & pigment, and cut and polished complete, on 15 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand) as per the specification and directed by Engr-in-charge. | 640 | Sqm | 1,050 ₹6.7 L | 800 ₹5.1 L | 1,050 ₹6.7 L | 770 ₹4.9 L | 650 ₹4.2 L | 500 ₹3.2 L | 500 ₹3.2 L | 725 ₹4.6 L |
| 9.00 | M&L for cutting grooves in brick wall 75mm wide and 65mm deep and sweeping horizontal face of groove with cement mortar (1:3) and making good in CM 1:3 after inserting membrane into the groove complete all as specified and directed by Engr-in-Charge. | 550 | RM | 40 ₹22,000 | 40 ₹22,000 | 80 ₹44,000 | 50 ₹27,500 | 50 ₹27,500 | 50 ₹27,500 | 50 ₹27,500 | 100 ₹55,000 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
15 Apr 2026, 6:00 pmClosed
GE I R and D Kanchanbagh
GE I R and D Kanchanbagh Kanchanbagh Post Hyderabad-500058.
REPAIRS TO ROOF, RAIN WATER PIPE AND CONNECTED WORKS OF CERTAIN BUILDINGS OF ZONE B IN DRDO TOWNSHIP, MES QTRS, GE(I) OFFICE COMPLEX AND CHESS COMPLEX AT KANCHANBAGH, HYDERABAD
2026_MES_757864_1
8191
Open Tender
Civil Works
270 days
GE I R and D Kanchanbagh
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
GE I R and D Kanchanbagh
₹98,000
Yes
23 May 2026
26 Mar 2026
17 Apr 2026
26 Mar 2026
15 Apr 2026
9 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Demolition of cement concrete as in roofs, floors (other than ground floors), beams stair cases, landing, chajjas and similar suspended work, removal of rubbish and debris from site and deposited beyond the area of defence land by contractors own arrangement if failed Rs.500/- per day penality recovery from payment all as specified and as directed. | - | CUM | - | - | |
Dismantling of existing roof treatment including tar felt/cement plaster/concrete tiles/stone slabs/brick tiles etc from roof surfaces including cleaning the surface and removing the debris from site and deposited beyond the area of defence land by contractors own arrangement if failed Rs.500/- per day penality recovery from payment complete all as specified and as directed by Engr-in-charge. | - | SQM | - | - | |
M&L for Plain Cement Concrete Type B0 1:2:4 (using 12.5 mm graded stone aggregate) as in padding concrete, coving of vertical junctions on roof top incl dismantling old loose /cracked cement concrete complete all as directed by Engr-in-charge. | - | Cum | - | - | |
M&L for brushing neat cement slurry with 3 Kg of cement per Sqm over the RCC slab and sides complete all as directed by Engineer -in- Charge. | - | Sqm | - | - | |
M&L for rendering 10mm in CM 1:3 over concrete surfaces on RCC roof slab and parapets mixed with WPC @ 2% by weight of cement shall be carried out complete all as specified and directed by Engr-in-Charge. Note : WPC will be measured under separate item of this schedule. | - | Sqm | - | - | |
Supply only integral water proofing compound
Make :- SCOTT /AQUA PROF/RAILIA | - | Kgs | - | - | |
Providing and applying brush applied water based PU dispersed polymer modified elastomeric liquid membrane, ShaliUrethane BTD White Color with Zero VOC to from the membrane in situ at site with 3 layers of monolithic, seam less finish having > 500% elongation. The first layer is to be apply primer Shaliprime BTD @200 Gms per sqm and shall act as the prime coat to fill in the cavities. This can be brush or roller applied. For spray application, using any airless spary system with recommended nozzle size at 30:1 at 2 bar pressure. Providing and applying the 2nd coat @ 1 kg per sqm using the soft brush, roller or Spray system with the recommended nozzle size on to the primed surface . Providing and applying 45 Gsm Fiber cloth over the 1st coat, when substrate till the coat is tacky. Providing and applying 3rd coat @ 1 kg per sqm to finish the application for a thickness of 1.2 mm membrane formed in place. The second coat should be applied perpendicular to the first coat for cross linkage and complete as per the specification and directed by Engr-in-charge. | - | Sqm | - | - | |
M&L for Cement concrete tiles 25cm x 25cm x 20mm thick, machine pressed with ratio ( 1 part cement : 2 part fine sand : 4 parts stone chips n exc 6mm); set jointed and pointed in neat cement slurry in roofs with white cement & pigment, and cut and polished complete, on 15 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand) as per the specification and directed by Engr-in-charge. | - | Sqm | - | - | |
M&L for cutting grooves in brick wall 75mm wide and 65mm deep and sweeping horizontal face of groove with cement mortar (1:3) and making good in CM 1:3 after inserting membrane into the groove complete all as specified and directed by Engr-in-Charge. | - | RM | - | - | |
M&L for cutting out cracks to 'V' - section in existing roof or terracing, cleaning out, wetting grouting with cement and sand slurry (1:3) . | - | RM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_848894.xls
BOQ • 0.30 MB
Tenderdocument.pdf
Tender Documents • 1.27 MB
Download all tender documents and submit your bid