| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.8 LAccepted-AOC | L-1 | Accepted-AOC Accepted as L-1 | |
| 2 | Rejected-Technical CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | - | Rejected-Technical Rejected as L-2 |
Tender Value
₹3.8 L
EMD Value
₹4,800
Closing Date
10 Jun 2024, 5:00 pmClosed
Staf Officer Mining
Staff Officer (Mining) SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP),Mobile No.- 9425533459
Construction of 10 nos Re-tainting walls in UG main dip sump in Seam VI(B) at Rajendra UG Mine. Period 120 days..
2024_SECL_308951_1
SECL/SGP/SO(M)/ET/35/24-25/653 Dt 24.05.2024
Open Tender
Civil Works - Others
Item Rate
120 days
Rajendra UG Mine
As per NIT
8 documents required · 8 mandatory
₹4,800
8 Aug 2024
25 May 2024
12 Jun 2024
25 May 2024
10 Jun 2024
25 May 2024
25 May 2024 - 30 May 2024
Amount
Item Description/ Heading Part (A) labour Cost
As per item No.1 (a) of GM’ SOR-2019 General cleaning/housekeeping not exceedinAs per item No.1 (a) of GM’ SOR-2019 General cleaning/housekeeping not exceeding 5cm in depth including disposal of cleaned muck/debris to be stacked up-to 50m or to be leveled and neatly dressed. 10 nos x (4.60m x 2.30m) = 105.80 m2
Item No.2(a) of GM’ SOR-2019: Grove cutting in coal– (In sides) 10 nos. {2x(1.30m x 0.30m x 0.50m)} = 3.90m3
Item No.2(c) of GM’ SOR-2019: Grove cutting in soft stone (floor) - 10 nos x (5.60m x 0.30mx 0.30m) = 5.04 m3
Item No.4 of GM’ SOR-2019: Reinforced cement concrete (1:2:4) in wall/roof ceiling of air crossing/stopping (any thickness) in UG (Excluding centering, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC material). 10 nos. (5.60m x 1.30m x 0.30m) = 21.84 m3
Item No. 5 of GM’ SOR-2019: Centering, shuttering, finishing, and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete. 10Nos. {2 x (4.60 x 1.00)} = 92.00 m2
Item No. 9 of GM’ SOR-2019: 6 mm thick cement plaster along with locking in sides In ratio of (1:4). 10Nos { (4.60x 1.00)+(1.00 x 0.50) +(4.6 x 0.50)} = 74.00m2
Item No. 10 of GM’ SOR-2019: Loading of all kinds of building materials into tub At Incline mouth (1) Stone chips – 19.44 m3 (2) Sand - 10.31 m3 (3) Cement - 05.04 m3 (4) MS rod (10mm) - 00.13 m3 Total -34.92 m3
Item No. 12 of GM’ SOR-2019: Unloading of all kinds of building materials into tub At destination in u/g
Item No. 13 of GM’ SOR-2019: Lead for transportation of materials by manual labour (lead-up to 61 to 75M)
Item No. 11 of GM’ SOR-2019: Transportation of materials with tramming & pushing, coupling & uncoupling with haulages for a distance every 1.0Km 0r part thereof and bringing the empty tubs to surface. Total Lead is 2.00Km (i.e. 02 nos addl. Except first 1km
Part-B Material Cost supply and stacking of building materials Stone Chips
Cement
Steel rod(8 & 12mm)
Total impact of GST for the purpose of CTC
Ram Awadh Singh
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .