Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.8 LAdmitted-Fee/PreQual/Technical/Finance | -26.00% | ₹16.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹17.4 L+₹58,809.76 (3.50%)Admitted-Fee/PreQual/Technical/Finance | -23.41% | ₹17.4 L+₹58,809.76 (3.50%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹19.3 L+₹2.5 L (14.9%)Admitted-Fee/PreQual/Technical/Finance | -14.99% | ₹19.3 L+₹2.5 L (14.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹22.7 L
EMD Value
₹45,420
Closing Date
21 Aug 2026, 11:00 amClosed
Municipal Council Jhunjhunu
Municipal Council Jhunjhunu
work no 13
2026_DLB_586413_13
E Nit no 09/2026-27
Open Tender
Civil Works
Percentage
60 days
Municipal Council Jhunjhunu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Municipal Council Jhunjhunu
₹45,420
Yes
25 Aug 2026
12 Aug 2026
21 Aug 2026
12 Aug 2026
21 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm | 687.5 | sqm | 46.6 | ₹32,037.5 |
| 2 | Carriage of Materials by mechanical transport
including loading, unloading and stacking : Earth for 2.0 Km | 687.5 | cum | 185.54 | ₹1,27,558.75 |
| 3 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manualy, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 100.5 | cum | 2,955 | ₹2,96,977.5 |
| 4 | Chequered precast cement concrete tiles 22 mm thick in footpath & courtyard jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Medium shade using 50% white cement 50% Grey cement. | 1,005 | sqm | 1,069 | ₹10,74,345 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 54 | cum | 5,510 | ₹2,97,540 |
| 6 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 540 | sqm | 236.5 | ₹1,27,710 |
| 7 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : including Providing/mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:4 (1 cement : 4 fine/ coarse sand) | 233 | sqm | 314.5 | ₹73,278.5 |
| 8 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm). | 1,200 | sqm | 144 | ₹1,72,800 |
| 9 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work | 600 | sqm | 114 | ₹68,400 |
stage.html
html • 0.02 MB
finance_1041653.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
Tendernotice_2.pdf
PDF • 0.07 MB
BOQ_1041653.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .